Key Responsibilities
As the successful candidate you will be required to perform the following:
Develop non-electrical utilities Capital Projects from feasibility assessment to full funding, including scope of work development, economic justification and alternatives assessment, and value improvement.
Lead the Integrated Project Team (IPT) during the study and scoping phases of the project.
Develop the non-electrical utilities scope for major crude, gas, and refining, and chemical programs.
Conduct engineering studies to establish project business case and economic viability.
Assess the feasible alternatives for capital projects and perform economic evaluations to identify optimal project solutions.
Perform project specification review during the details engineering phase to ensure economic design and conformance with Design Basis Scoping Papers.
Develop executive level briefings, memos, presentations and documents on capital investment and other special study items.
Mentor Utilities Planning engineers.
Minimum Requirements
As the successful candidate you will have:
Bachelor’s degree in Chemical or Mechanical Engineering. Advanced degrees are highly preferred.
Minimum of 20-year experience in non-electrical utilities systems technologies, scope development, design, economics and execution, including at least 5 years in business case evaluation and assessment for various non-electrical utilities systems, leadership of major engineering studies and design packages.
Experience of oil, gas, and chemical processes and industry.
Knowledge of engineering practices and economic principles, calculation methods, design details, Codes, Standards and Specifications.
You will be able to demonstrate development of strategies and feasibility studies for the upgrade or replacement of installed systems.
You will be redirected to the company website to apply for this position