Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Oyewole Oyebanji

Candidate ID: 1382530

Career Summary

Graduate with 21 years experience in Site Engineering / Projects functional area

Skill Set

Onshore & Offshore Facilities Mgt and Maintenance , Piping and Pipeline Fabrication, Tank Fabrication, Flow-station Rehab,Refinery TAM, Turnkey Projects, Power Plant

Professional Information

Total Experience : 21

Nationality : Nigeria

Qualification Level : Graduate

Job Function : Site Engineering / Projects

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

CONTACT ADDRESS: NO 3 ADENIRAN AJAO
AJAO ESTATE, ANTHONY
VILLAGE, LAGOS - STATE.

PHONE NO: 08023517106 / 08077048894

E-MAIL: woleoyebanji71@gmail.com
woleoyebanji@yahoo.co.uk

Oyewole Oyebanji
Personal Information ? Nationality: Nigerian
? Date of Birth: 12th September 1971
? State of Origin: Oyo-State
Personality A committed, resilient, diligent and enterprising person with good interpersonal relation and good professional skill sets.

Educational Background Institution Certificate Obtained Dates
Bodija International School, Ibadan FSLC 1982
St. Patrick’s Grammar School, Bashorun, Ibadan WASC (Ordinary Level) 1987
University of Lagos, Akoka, Yaba Lagos B.Sc (Mechanical)
Second Class Upper Division
Thesis: Mathematical Modeling and Computer Simulation of a Complete Gas Power Plan 1995
ASNT LEVEL II – VISUAL INSPECTION, DPI, MPI LEVEL 2 INSPECTOR 2013
GENESSARET INST API 570 2015
American Academy of Project Management –(AAPM) Masters Project Management 2009
AGICS
Diploma in Scientific Computing (PASCAL, Turbo Basic, AutoCAD, MS Project, P3) 1992


Professional Membership ? Nigerian Society of Engineers (NSE 002335)
? Project Management Institute(PMI ID 784484)
? American Society of Mechanical Engineers (No. 100022060)
? Pipeline Professional Association of Nigeria (PLAN No. 123)
? Singapore Welding Society (F2182)
? Nigerian National Fitters Association
? Fellow - American Academy of Project Management
? Financial Reporting Council. Nigeria (FRC/2013/NSE/00000002701)

Courses &Trainings
? ANST LEVEL 2
I. Visual Inspection,
II. Dye Penetrant
III. Magnetic Particle Inspection
? API 570 – Gennesaret Resources Ltd
? Safety Workshop UK Trade and Investment – 2006
? Project Management – Primavera 3.0, Methods 123 (MPMM)
? NDT Training – OMAD Inspection 2005
? 5. HEMP- BTIP SPDC 2006
? Training on Fire Fighting DEUX/SPDC - 2006
? STOP WORK @ 10 SPDC - 2006
? Safe Work Ethics in Tank Farms BTIP Bonny 2006
? Forklift /Groove Crane Safety Training 2007
? HSE Level 2 – NISP, Fire Fighting Course – NISP
? AUTOCAD, MS PROJECT, PRIMAVERA, FEA.
Codes Used During the Course of Work ? ASME B31.1 & B31.3
? API RP 570, 574, 579, 1104, API Pub 2201
? API 653, 650, 620, 2000, 14E, 2000
? AWS D1.1
? MPNU GP, SPDC DEP
? EEMUA 159, ASME II, V, VII & IX
Knowledge, Skills and Special Ability
• Contract Administration and Management
• Knowledge of oil and gas business concepts, requirements, industrial practices, applicable national and international Specifications, Codes, Standards, Local Laws, Rules and Regulations.
• Good experiences in oil and gas facilities Engineering Design, Construction, Installation, Assembly, Maintenance and Rehabilitation.
• Knowledge of project and contract management principles, practices, techniques, and tools.
• Ability to identify problems, defines its seriousness, collect data, analyze them and establish facts.
• Good written and verbal communication skills with ability to create, compose, and edit written materials.
• Ability to simultaneously manage diverse, divergent and multiple projects activities and achieve targeted result.
• Knowledge of the principles of strategic decision-making and initiating solution to technical engineering and construction conflicting issue.
• Proficient and skillful usage of engineering software to modeling various work activities – Microsoft Words, Excel, MS Project, TANK (COADE), LRFD/ASD, Primavera and AutoCAD.
Working Experiences
Company: ALLIED ENERGY PLC
Position: Jan 2014 till May 2018 Technical Mgr –VC (OML 108, 278 & 282)
Projects: Production and Drilling of OML 108, 278 and 282
? ALLIED- WALLER MARINE Gas Power Project (ST, GT, CCGP)
? Drilling of Ukpokiti 5R by Trident VIII.
? Completions of 5Y and 5G
? Red and Yellow Reservoir Geosciences and Simulation Studies
? Gas Commercialization of Ukpokiti & Kunza fields of OML 108
? Re-engineering of MOPU
Duties:
? Static & Rotodynamic Machinery Repairs and Alignment
? Pressure vessel Inspection - NDT
? Ukpokiti Platform 4 Repairs
? Production Reporting on OML 108
? Technical review of Waller Marine Power Solutions
? Manage ALLIED’s interest in the field by attending OCM, TCM, Technical Review meetings and DPR meetings.
? Scope generation for the gas commercialization project
? Technical Analysis of Gas Monetization of OML 108 – GTL
? Review of Drilling program and participated in reservoir studies to justify the gas commercialization viability.
? Draft preparation and review of the Addendum to MOU for the JV partners
? Analysis and Monitoring of crude allotted to ALLIED / CAMAC.
? Engineering Design concept review of gas commercialization of OML 108.
? HAZID of Gas Commercialization project
? Manage and coordinate multidiscipline engineering activities and inter-discipline interfaces to ensure projects are executed in a safe, efficient, cost effective and timely manner.

Company: ALLIED ENERGY – Lead Facilities Engineer (OML 120 & 121)
Aug 2012 – Dec 2014
Projects: Drilling of OYO 7 & 8.
Duties:
? Static & Rotodynamic Machinery Repairs
? Pressure vessel Inspection - NDT
? ALLIED- WALLER MARINE Gas Power Project (ST, GT, CCGP)
? Production Report on OML 120 & 121
? Project management of OYO 7 & 8 drilling campaign.
? Design, engineering and technical support for operational needs.
? FPSO Amarda Perdana unit operations management.
? Act as primary technical co-ordination on OML 120/ 121 asset management.
? Helped develop budgets and plans and assist operations personnel in reviewing existing facilities to improve efficiency and reduce costs.
? Worked with the team to execute operating plans and capital and expense budgets and to develop Allied's assets in a cost-effective manner.
? Took responsibility for managing all aspects of construction projects.
? Worked with tanks, vessels, compressors, pumps, piping, power distribution and computer controls, including making repairs, adding new features or functionality and installing new equipment.
? Manage construction projects, such as the installation of oil, gas and water production, separation and injection facilities (upstream) or petrochemical and refinery facilities (downstream).
? Manage and coordinate multidiscipline engineering activities and inter-discipline interfaces to ensure projects are executed in a safe, efficient, cost effective and timely manner.

Company: DeltaAfrik Engineering Limited
Date: Jan 2011 Aug 2012.
Position: Principal Project Engineer (Brownfield Facilities and Pipelines)
Projects: Satellite Field Development Phase 2

? Engineering, Construction Management, Transportation & Installation of four new unmanned platforms (Ibot A, Ifure, Ufan & Idoho N -Topside, Jacket & Piles )with 16-slot each capable of producing 40Kbpd liquid and 110 Mscfd of gas per platform. Water depth for the SFD2 WHPs is in the range of 65ft to 190ft.
? SFD Phase 2, will capture over 200MBOE of oil and gas from five undeveloped fields within the current JV acreage of OML-67, OML-68 and OML-104
? Pipeline Scope of Work is to construct about 75 km of new subsea pipelines (FWS & HP Gas Line) and modifications & tie-ins to associated four existing Brownfield Production Platforms – Idoho BP, Yoho YP, Ubit GY & Ubit GW.
Duties:
? Act as primary technical co-ordination interface with client to ensure that the client’s expectations are satisfied
? Manage and coordinate multidiscipline engineering activities and inter-discipline interfaces to ensure projects are executed in a safe, efficient, cost effective and timely manner.
? Steward the Brownfield & Greenfield Scope of Engineering & Construction activities
? Ensure the project conforms to the client’s approved Basis of Design and all applicable regulatory and code requirements.
? Coordinate Workshops to review design concepts for Pig trap deck extensions
? Steward the review of stick-built and modularized concepts for the associated pig traps on the Brownfield facilities (Idoho BP, Yoho YP, Ubit GY and Ubit GW) to reduce offshore time.
? Steward the review of location of the SDV and access platform at Idoho BP, Yoho YP, Ubit GY and Ubit GW in terms of materials handling studies, dropped object studies and constructability.
? Steward the review of shutdown planning with the client with respect to the prospective project schedule.
? Steward the review of positive isolation for all tie-in on the Brownfield facilities.
? Maintains and builds healthy client relationships.
? Proactively resolves performance, scope and schedule issues with the Client as they arise.
? Identifies documents, communicates and meets the client’s requirements.
? Focuses team on achievement of milestones and other key project objectives.
? Steward the Constructability Roadmap Action Items to closure.
? Maintains HSE focus within the team to ensure OHSE and Worley Parsons’ ONE WAY requirements are included in design and procurement.

Company: MOBIL PRODUCING NIG LTD
Contractor Amazon Energy Ltd
Date: Mar 2010 - Dec 2010.
Position: Principal Project Engineer (Piping / Pipelines)
Projects: Satellite Field Development Phase 1

? Engineering, Construction Management, Transportation & Installation of four new unmanned platforms (OYOT, ABANG, & ITUT-Topside, Jacket & Piles) with 16-slot each capable of producing 40Kbpd liquid and 110 Mscfd of gas per platform. Water depth for the SFD1 WHPs is in the range of 65ft to 190ft.
? SFD Phase 1, will capture over 250MBOE of oil and gas from five undeveloped fields within the current JV acreage of OML-67, OML-68 and OML-104
? Pipeline Scope of Work is to construct about 60 km of new subsea pipelines (FWS & HP Gas Line) and modifications & tie-ins to associated four existing Brownfield Production Platforms – Idoho BP, Yoho YP, Ubit GY & Ubit GW.
Duties/Projects:
? Review Layout Engineering drawings like Piping Isometrics, Equipment and Piping Layout, Vessel Nozzle Orientation, Rack Piping and Tank Farm
? Responsible for final checking and releasing engineering drawings for the construction.
? Providing technical support during construction phase and supporting projects & procurements
? Reviewing the engineering / design changes & resolving quality related problems associated with design.
? Review and Preparation and Interpretation of Engineering Drawing (P&ID, Isometric drawing and General Layout drawing and As-built drawing).
? Redline markup of piping and Mechanical drawings
? Construction/installation supervision for piping systems & Coordinated spool piece fabrication
? Supervised the pump discharge line tie-ins preparation and welding of the reinforcement pad on line for the hot tapping.
? Supervised the preparation, welding and laying of the pipes on the pipe rack.
? Supervised the preparation of the pipe racks and supports. Preparation of punch list for equipment and piping
? Preparation of report for site daily activities



Company: NESTOIL LIMITED.
Date: August 2008 – November 2009.
Position: Project Manager
Report to: General Manager (GM)
Duties/Projects:
? Revamp of Condensate/Crude Storage Tank Revamp Project for Mobil Producing Nigeria Unlimited Contract No A2139813
Condition inspection Tank 5004
De-sludging / Degassing of Tank

? Construction Superintendent: Repair of 48 inch Offshore Export Line for MPNU
Prepare the Engineering Design Basis for Repair
Generation of Work Methodologies for the different aspects of Work.
Riser Repair.
Repair by Techno-Wrap/ Clamping of Ruptured sections.
? Manage contracts and projects to ensure compliance with commercial conditions. Resolution of commercial issues during contract execution. Proper project implementation and updating with regards to HSE, quality, schedule etc
? Provide complete contract related services for project and operation administration.
? Act as the integrating and driving force in the project group, and carry out costing, planning, procurement, finance and time-related project follow-up work.

Company: Deux Project Limited
Date: October 2006 – Aug. 2008.
Position: Technical Team Leader – Oil & Gas
Report to: Project Director (PD)
Projects:
? Laser Scanning of SEA EAGLE FPSO - NETCO
? Laser Scanning of Teslim Balogun Stadium for as-built generation.
? Laser Scanning of Multi-purpose Building at the Ikeja Hospital
? Installation of Foam-Skid and Associated piping – TECH SYSTSEMS / NLNG, Bonny
? Engineering Project Planning & Management of Call off Contract with SPDC, MOBIL & NLNG.
? SPDC Warri Fire Tender Contract – 7 Fire tenders for SPDC West.
? SPDC Port Harcourt MICU Contract SPDC, Bonny Fire Tender Contract – 4 Fire Tenders
Duties:
? Provide, with full responsibility and accountability, technical services for projects in all areas with respect to Design/Engineering, Procurement, Construction, commissioning and Project Management.
? Develop and prepare engineering designs, cost estimates, written reports, and technical specifications.
? Coordinate and review engineering design to assure compliance with the latest Codes, Standards, Specification, National/Corporation requirements and Procedures.
? Manage a multi-disciplined team of Engineers and Technicians including civil, Mechanical, Piping, Instrument & Electrical engineers.
? Monitor and report construction progress, Organize and provide daily site work direction.
? Site supervision and co-ordination of all project materials, personnel and equipment.
Company: AMAZON ENERGY.
Date: October 2005 – October 2006
Position: Lead Project Engineer
Report to: General Manager (GM)
Duties / Projects:
? Inspection Control for the Topside and Underwater inspection of Agbara Platform – Drilling, Production and Floating Flare. – Bottom debris survey, bottom frame measurement and Thickness measurement by ROV inspection. Marine Growth Inspection and Magnetic Particle inspection at defined bathymetric heights and orientations.
? Maintain a proper documentation of drawings with a controlled revision procedure of Agbara Platform Drilling & Production Platforms. Design Presentation for final close-out report.
? Drafting of Drilling & Production Platform Drawing (Agbara Platform).
? Offshore - Structural Assessment of Ubit 'B', Adua 'A' & Edop 'B' platforms with additional conductors. – MOBIL Project.
? Offshore - Structural Assessment of Enang A platform with additional conductors.

Project Name: SPDC Bonny Terminal Integrated Project (BTIP).
Rehabilitation of Tanks in Bonny Terminal (RTBT).
Company: DEC OIL & GAS LIMITED.
Date: Sept 2003 – Oct 2005
Position: Project Engineer/ Planning
Report to: Project Manager (PM)
Duties:
? Tank 3, 4 & 5 Demolition
? Tanks 24 & 25 New Construction for BTIP, Bonny Terminal.
? Reports to the Project Manager and assists the Project Manager to organize execution of the works.
? Provide construction supervision, monitor and report construction progress.
? Project Planning & Scheduling (Network Analysis, Gantt chart) Using Primavera 3.0. Cost Estimates for Projects, CTR of project, Preparation of Job Hazard Analysis, BTIP New Tanks 24 & 25 and Demolition of tank 3 & 4. and Extra works. Level 4 Schedule.
? Planning/Scheduling/ Costing of Nkpoku Scrapper Trap Upgrade. Level 4 schedule.
? Ensures development of functional and dependable work programme which ensures proper scheduling/planning.
? Develops progress and performance evaluation reports.
? Development of dependable project control system. Issuance of weekly and monthly report.
? Prepare manpower and equipment plans/schedules.
? Prepare Work-breakdown structure and project s-curves

Company: Hekiro Nigeria Limited
Date: January 2002 to August 2003.
Position: Construction Engineer
Report To: Project Manager
Projects:
? 6” Pipe laying - Land Flow line- Idu Field 2002.
? Gas Lifting Flow line Laying from Ebocha 8 to 11, (NAOC-2002-N2Y0019P/00).
? Laying of Idu 1 & 3 vandalized flow lines (NAOC-2002 –N2Y0389P/00).
? 14 inches pipeline Construction from Samabri Biseni cluster 2 location to Idu Flow Station (NAOC-2002).
? Flow line Laying at Mgbede 2nd (SAIPEM-2002 SCNL / MGB2 / PH / NAOC / FW /021-S).
? Construction of 24” NLNG Phase 3 Gas Supply project from OB/OB to Kwale(DAEWOO).
Duties
? Coordination of project document preparation for project take-off - i.e. project execution plan, scope of work, work procedures, method statements etc.
? Act as the Company focal point during various projects.
? Preparation of design work packages for various revamp/expansion activities.
? Coordinate and supervise the company scope of work which includes various civil, electrical and mechanical installations works.
? Writing of job work package for various plant unit during expansion and tie-ins works.
? Overall project planning and scheduling, work breakdown system WBS, progress updating and reporting.
? Monitoring of construction progress to assure project plan are followed and proffer solutions to slippages in project progress.
? Assist sectional Managers to prepare plan and schedule for overall project planning.
? Co-ordinate and supervise commissioning activities such piping mechanical cleaning, blowing, flushing, leak test, relief valve calibration and pop test, Nitrogen purging and final start-up.
Company: Horchi Construction Nigeria Limited
Date: Sep 1999 – Aug 2001
Position: Project Engineer / Materials Controller.
Report To: Project Manager
Projects / Duties:
? 10” Concrete-coated pipeline construction supervision at Santa Babara DEC OIL/SPDC/HORCHI
? Design/Construction of Self-Propelling Ramp Barge, Work Barge – Mel 5 (April 2000-Sept. 2000).
? Fabrication of Utility tanks for SPDC flow stations.
? Maintenance Work on Off-Shore Barge.- Victory 2000 Barge
? Replacement of Soku flow line (23/02/2001-12/03/2001).
? Reconstruction of Flarestack and installation of 1 No Boskel at Cawthorne Channel-1 Flow station (01/04/2001 - 24/04/2001).
? Flow-line replacement for Orubiri well 4T(2320m), 7L/S (4860m) &11T(750m).
? Laying of 4” Flow line at Nembe 3 from Flow Station to well head
? Salvaging and re-installation of Well head platform and flow line riser for
? Awoba well 2L/S ( 05/05/2001 – 25/05/2001).
? Rehabilitation of Landing Jetty at Alakiri (06/06/2001-15/06/2001)
? Installation of Diesel & Electric Driven Compressor at Krakama Flow Staion
? Boskel Flare Installation and flare tip and drain line at Diebu Creek (two arms of the flare) and Nun River (one arm of the flare) & Orubiri flow stations
? Leak Repair at Cawthorne Channel 1 & Akaso well 7, 11, 21 & 21 (L/S arms)
? Replacement of riser and approach at Orubiri
? Fabrication of well head platform and skid for two diesel tanks (40,000 litres) for Nembe 3 Flow Station

Duties
? Have the overall responsibilities for construction, quality and project close-out reporting.
? Manage a multi-disciplined team of Engineers and Technicians including civil, Mechanical, Piping, Instrument & Electrical engineers.
? Monitor and report construction progress, Organize and provide daily site work direction.
? Coordination and supervision of all pipe shop fabrication and field erection activities of piping system.
? Preparation of construction work procedures, work instruction, inspection and test plan, and plan/schedule for piping system installation.
Project Name: Obite Gas Plant Project
Obite, Rivers State.
Company: ELF PETROLEUM DEVELOPMENT COMPANY
Contractor: Ponticelli Nigeria Limited/ RODEC SERVICES
Date: Aug 1998 – Aug 1999.
Position: Mechanical /Pipe Fitting
Duties:
? Fabrication ,Assembling, & Installation of Turbine (Typhoon), Compressors and Air filter / housing
? Construction of Utility Tanks for the Gas Plant.
? Air Coolers, Condensers Assembly
? Alignment of turbine with GEC ALSTHOM Generator
? Coordination of laying of piping into the combustion inlet silencer, filter housing.
? Fabrication of air filter supporting structure & brackets, structural parts of mechanical transducers

Company: LATEX COPCO
Date: Dec 1996 – July 1998
Position: Pupil Engineer (Trainee)
Duties:
? Project Management/Design Engineering Trainee
? Engineering Consulting, AutoCAD Design of Mechanical members:-
? Angles, Ratchets, Brackets, Gear-arm, Plant Equipment
? Prepare technical designs for drafting works using AutoCAD, and other design
packages.
? Development of a maintenance pattern for all machinery and pneumatic instruments.
? Review drawings and implant design upgrades/improvements.
? Supervise the implementation of minor mechanical modifications and improvement projects to ensure safe, cost effective and timely execution in addition with company standards.
? Prepare and make report on technical designs and incorporate new information to existing designs.

Company: Shell Petroleum Development Company (SPDC, PH)
Date: July 1994 – January 1995
Position: Industrial Trainee
Department: ECPE 212 – Land & Swamp Flow-lines & Pipeline Projects

Duties:
? Review of SPDC Standard Construction Specification
? Review of Design Engineering Practices (DEP)
? Installation of 4” & 10 line pipes from Cawthorne Channel WHP to Flow-station

Hobbies: Reading, Football and Swimming.

Referees: