BE Electrical Engineer with total 14 years experience including 12 years in GULF (UAE and Bahrain) in Oil and Gas Construction and Building Construction. Having good knowledge in Electrical and Instrumentation works. Able to handle projects independently. Execute and deliver the projects on time.

Skill Set

Electrical and Instrumentation Construction execution in Oil and Gas field. Having experience in Designing, Estimation, Testing and Commissioning in Electrical Works

Professional Information

Total Experience : 14

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Oil / Gas / Petroleum

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile



NAMBI ARUMUGAM
Electrical Engineer
E-mail : nambi.eee@gmail.com
Mobile : +91 9384322115
Skype Id : nambi.eee@gmail.com
Whats App : 9384322115
Current Location : India


Career Objective:
Aim to be responsible Engineer to drive the assigned projects in Oil and Gas, Pipeline Construction,Shutdown Project for successful completion without deviate the schedule, cost and man hour.

PROFESSIONAL SUMMARY

Total Experience:14+ as Electrical Engineer/E&I Engineer (Experience Overseas 12 Years and India 2 Years)
Electrical Engineer in Onshore work experience in the field of Oil &Gas industrial projects with Green & Brown field Experience such as Pipe line, Well Manifold’s, Tank Battery’s, Compression Station’s, GDU’s, Gas Plant, Beam Pump wells, Oil lift Well’s and Term Maintenance oil and Gas project’s with EPC.
Handled Major electrical equipment’s such as RMU,MVSwitchgear, LV Switchgear,Power Transformer’sLV and MV,Generator’s ,Synchronising panels,LCS,HV termination kits, DC and AC UPS,Hazardous area Panels/DB’s, MV and LV cables,Lightning Protection system,Grounding System,Cathode Protection System, MCC’s,Solar Panel,Lighting,Welding Sockets,Cable tray,Trunking, Fire Alarm system(Smoke detector, Manual call points, Heat Detector,H2S Detector, Flammable gas Detector, Cabling and Argonite System) Telephone system, Marchaling panels, SSTubings, PT,TT,Valve,Heat tracing system, Gland ,Lugs, CAD weld and Electrical &Instruments Bulk items.

? Scope of excellence :
- Project/Site Supervision -Design Engineering Co-ordination - Estimation Electrical
-Testing & Commissioning -Procurement Co-ordination

? Comprehensive experience in managing project electrical construction activities with close coordination with Supervisors , Manufacturers , subcontractors & all interdisciplines
? Able to perform Electrical Calculation such as Cable sizing/Voltage drop calculation etc.
? Attending meeting Daily Progress, Weekly Progress and HSE Meeting.
? Review project documents such as P&ID,Data sheets,layout,SLD,Cable laying,Cable testing,Calibration and Loop checking.
? Testing and Commissioning of Transformer’s, RMU,LV Switchgears, UPS, Lighting and Sockets etc.


ENGINEERING SKILLS:

? Preparation of DB and Cable Schedule
? Project incharge to attend technical meeting to solve the technical issues.
? Preparation Method statements,RFI,Technical query and as well as build drawings.
? Knowledge of IEC,IEEE,API and relevant local engineering standards & specifications
? Review of Engineering Submittals i.e Project Drawings, Vendor Drawings, Vendor Material Submittals etc.
? Coordination and followup with Client for getting approval of project drawings & other documents
? Hazardous Area classifications such as Zone 0, Zone1 and Zone 22.

EDUCATIONAL BACKGROUND

2000-2004 Bachelor of Engineering in Electrical & Electronics from RVS Engg.College under Madurai Kamaraj
University.Secured 60%.
1996-1999 Diploma Engineering from Scad Polytechnic , Tirunelveli. Secured 78%.
1995 10th from Margosis Hr.sec School , Nazareth Tirunelveli Secured 76.6%.


EXPERIENCE SUMMARY


Tenure Company Designation

April ’2011-April 2019 Mechanical Cont.&Services WLL, Bahrain Senior E&I Engineer
June ’2008-March’2011 El-Mech Electromechanical works WLL, Abudhabi Senior Electrical Engineer
Nov ’2006-April’2008 AL-JABER GRINAKER –LTA Engineering LLC, Dubai Electrical Engineer
April 2004-Oct ’2006 Techser Engineers & Contractors, Chennai Site Engineer


DETAILED WORK EXPERIENCE

PROJECT 9:

PROJECT DESCRIPTION : BANAGAS FIELD PIPE LINE & SITRA EXPANSION PROJECT& ALBHA POTLINE -6 GTC-2
CLIENT : BANAGAS
DESIGNER : JGC
CONTRACTOR : MCSC WLL BAHRAIN.
DESIGNATION : ElectricalEngineer
DURATION :2018 to 2019
KEY RESPONSIBILITIES :
• Installation of Electrical equipment’s such as Eexe JB’s, Panels, Local Control Stations, Light fittings,Cables, CableGlands, Cabletrays,Cable Lugs, Cad weld,Cathiodic protection,CAD weld,LCS, system and consumables.
• Procurement of all Electrical consumable items and CAD weld items, Grounding materials,Switch,Sockets,light fittings,LCS and GI conduits with accessories.
• PTW procedures and regulations by controlling and signing Work Permits.
• Co-ordinate &complete the Electrical works in the Brown field Shutdown works.
• Attending Client meeting, Monitor the productivity & execute the projects with in schedule & solve technical issues.
• Monitor & attending system handover walk through to hand over the system by equipment wise.
• Preparation of Method Statement, Material Approval Request, RFI and Root cause Analyze.
• Ability to highlight potential bottlenecks in advance to develop and implement solutions. Review the project planning and scheduling during Construction phase.

PROJECT 8:

PROJECT DESCRIPTION : NAG LFTD PHASE-1
CLIENT : TATWEER PETROLEUM
DESIGNER : PETROFAC
CONTRACTOR : MCSC WLL BAHRAIN.
DESIGNATION : Electrical Engineer
DURATION : 2016 to 2017
KEY RESPONSIBILITIES :

• Construction Focal point, control and supervise the Construction activities of the assigned projects, including monthly/ weekly construction progress meetings.
• Installation of 33KV Transformer, HV/LV Switchgear and RMU
• Preparation of BOQ/Estimation with pricing and calculating labour resource
• Carryout the installation works as per approved shop drawings, standards and specification
• Ensure all Latest drawings (AFC) issued to the Supervisors and Site team.
• Coordinating with Client & Subcontractors to sort out the Technical problems
• Troubleshoot and investigate malfunction systems & provide recommendations to reactivate the issues
• Responsible for cost, schedule,manpower and material quality and Budget control.
• Co-ordinate &complete the Electrical works in the Brown field Shutdown works
• Hazardous- and safe-area equipment, Cable containment systems, Fire & gas detection systems and Industrial lighting and general services
• Monitoring site activities according to the schedule and timely handover the projects to client
• Preparation of Method Statement, Material Approval Request and RFI

PROJECT 7:

PROJECT DESCRIPTION : GENERAL CONSTRUCTION SERVICES & CHOKE VALVE AUTOMATION& RELOCATION OF K-30 GDU.
CLIENT : TATWEER PETROLEUM
DESIGNER : TATWEER
CONTRACTOR : MCSC WLL BAHRAIN.
DESIGNATION : Electrical &Instrument Engineer
DURATION :2014 to 2017



KEY RESPONSIBILITIES :
• Beam pump installation, Oil lift motor Installation works and Choke valve Automation with solar power or LV power supply works.
• SS Tubing,F&G systems,Instrument Cabling,Loop testing &Marshaling Panels.
• Procurement of Electrical & Instruments materials such as Eexe JB’s, Panels, Local Control Stations, Light fittings,Cables, CableGlands, Cabletrays, Cable Lugs, Cad weld items and consumables.
• Co-ordinate &complete the Electrical works in the Shutdown works.
• PTW procedures and regulations by controlling and signing Work Permits.
• Construction Focal point, control and supervise the Construction activities of the assigned projects, including chairing the weekly construction progress meetings.
• Follow the LOTO system while commissioning/operation stage.
• Attending Client meeting, Monitor the productivity & execute the projects ahead of project schedule & solve technical issues.
• Evaluate monthly/ final valuation claims submitted by Contractors and forward for review and approval as per schedule of authority.
• Testing and Commissioning of Electrical equipment’s.


PROJECT 6:

PROJECT DESCRIPTION : TEMPORARY COMPRESSION STATION -6 NOS
CLIENT : TATWEER PETROLEUM
CONTRACTOR : MCSC WLL BAHRAIN.
CONSULTANT / ENGINEER : EXTERRAN & ENERFLEX
DESIGNATION :Engineer Electrical & Instrument
DURATION :2013 to 2014
KEY RESPONSIBILITIES :
• 500 KVA 11/415 kV Dry Type Power Transformers& RMU Installation works.
• 415V Low Voltage Switchgear, Marchalling Panels and Lighting panel Installation works.
• SS Tubing,F&G systems,Instrument Cabling,Loop testing &Instrument Installation works.
• Cable tray.Grounding,Power Cabling, Gland& Terminations works.
• Light poles,Light fitting Installation, Socket Installation,Grounding and process motor connection works.
• Construction focal point, Control and supervise the construction activities for the assigned projects.
• Responsibility for PTW procedure and regulation by controlling work permit.

PROJECT 5:

PROJECT DESCRIPTION : TANK BATTERY 7 & 8 and Well Manifold’s Facilities EPC project
CLIENT : TATWEER PETROLEUM
CONTRACTOR : MCSC WLL BAHRAIN.
DESIGNER : JGC
DESIGNATION :Engineer Electrical & Instrument
DURATION :2012 April to 2013 August
KEY RESPONSIBILITIES :
• Engineering, Installations, Procurement, Pre-commissioning Coordination.
• 2 MVA 11 /0.433kV Distribution Power Transformer ABB ELECTRIC&33kv RMU Installation works.
• 33KV/415 V 3150 KVA Transformer Installation, Cabling & Termination Testing &Commissioning.
• 2 MVA , 415V Diesel Generator CATERPILLAR
• 11Kv/415 V High Voltage & LOW Voltage Switchgear POWELL ELECTRIC
• Installation,Testing & Commissioning of 11KV & 415 V 250 HP Motor (Solorun Test).
• 415V LV Switchgear POWELL ELECTRIC
• 24V and 110V DC UPS systems
• Building Services - HVAC System,lighting & small power,Earthing system
• Cathodic Protection for Tanks.
• SS Tubing,F&G systems,Instrument Cabling,Loop testing &Marshaling Panels.
• Procurement of Electrical & Instruments materials such as Eexe JB’s,Panels,Local Control Stations, Light fittings,Cables, Cable Glands, CabletraysCable Lugs, Cad weld items and consumables.
• Preparation of ‘as built drawings’ on completion of the project to ensure ‘as built’ information is available and submitted to client.
• Evaluate monthly/ final valuation claims submitted by Contractors and forward for review and approval as per schedule of authority.
• Construction focal point, Control and supervise the construction activities for the assigned projects.
• Responsibility for PTW procedure and regulation by controlling work permit.
PROJECT 4:

PROJECT DESCRIPTION : AGEP COMPRESSION STATION CS-8 & 20
CLIENT : TATWEER PETROLEUM
CONTRACTOR : MCSC WLL BAHRAIN.
DESIGNER : WORLEY PARSONS
PLANT : CONSTRUCTION OF CS-8 & 20
DESIGNATION :Engineer Electrical & Instrument
DURATION :April2011 to January 2012
KEY RESPONSIBLITIES:

• 33 KV RMU Installation Testing & Commisioning.
• 33 KV/11 KV Transformers& 33KV/415 V Transformer Installation, Cabling & Termination Testing & Commisioning.
• Compressor motors,Earthing,CAD Welding’s,LV Panels,Solar Lighting Installation,Cabling& Testing.
• Fire & Gas system& Marshalling panel, field instruments Installation&Testing.
• ABB Switchboard HV & LV Installation & testing
• Knowledge of EWA specifications , BS standards &TatweerStandard Work Practices
• Exproof Panels,JB’,Exproof Lighting fixtures and Exproof Sockets.




PROJECT 3:
PROJECT DESCRIPTION : SUBSTATIONS 11KV ABUDHABI
CLIENT : ELMECH ELECTROMECHANICAL WORKS.
DESIGNATION :PROJECT ENGINEER ELECTRICAL
DURATION :JUNE 2008TO MARCH2011
KEY RESPONSIBLITIES :
• Installation of Cable tray,Cable pulling,Glanding& Termination.
• Installation of Substation Grounding,Transformer,HV/LV terminations& Lightning Protection.
• Fire Pump Motors,Fire Alarm systems,UPS,Central Battery System,UPS,CCTV,GRMS,Lighting Control System & Dimming system.
• LV and HV cable laying underground and cable ladder.
• Estimation for the new projects.
• Preparation of cable schedules, Substation equipment layouts.
• LV Power Cable Sizing Calculation, Earthing works & Lightning Protection works

PROJECT 2:
PROJECT DESCRIPTION : BETWEEN THE BRIDGES SPA,RETAIL,APPARTMENTS RETAIL & HOTELS ABUDHABI
CLIENT : AL-JABER
DESIGNATION : ELECTRICAL ENGINEER
DURATION : NOVEMBER 2006 TO APRIL 2008
KEY RESPONSIBLITIES :
• Engineering, Installations, Testing & Commissioning Coordination of Substation Equipments which includes
• 1000 KVA Power Transformers Tesar.
• Gas Insulated Switchgear, Air Insulated Switchgear Siemens.
• 11kV Power Capacitor Banks NOKIAN,FINLAND
• Power Cables 0.6 to 11 KVDucab, UAE.
• Power Cabling Termination & Jointing Coordination RAYCHEM,GERMANY
• Substation Grounding & Lightning Protection WALLIS,UK
• Fire Pump Motors,Fire Alarm systems,UPS,Central Battery System,UPS,CCTV,GRMS,Lighting Control System & Dimming system.
• Auto Transfer Switch & Manual transfer switch to operate the generator with Synchronization panels.
• Preparation of cable schedules, substation equipment layouts , Grounding System,
• LV Power Cable Sizing Calculation, Earthing Calculation & Lightning Protection Calculations

PROJECT 1:
PROJECT DESCRIPTION : ASHOK LEYLAND,FORD , HOSPITALS.
PLANT LOCATION : INDIA
FACILITIES COMPANY : TECHERS ENGINEERS & CONTRACTORS
DESIGNATION : ELECTRICAL ENGINEER




KEY RESPONSIBLITIES :
• Cable pulling, Glanding& Termination.
• Substation Grounding & Lightning Protection.
• Fire Pump Motors,Fire Alarm systems,UPS,Central Battery System,UPS,CCTV,GRMS,Lighting Control System & Dimming system.
• Estimation for the new projects.
• Preparation of cable schedules, Substation equipment layouts.
• LV Power Cable Sizing Calculation, Earthing works & Lightning Protection works

PERSONAL INFORMATION & CONTACT DETAILS

Date of Birth : 28 May, 1978

Address : 6/22, West Street, Tirunelveli, Tamil Nadu, India

Languages : English &Tamil (To Read, Write & Speak)
Hindi (To speak only)

Marital Status : Married / one child

Driving License : Automatic light vehicle (State of Bahrain)& India

COEPP NO : EPP/C2065/EL/01-D

Passport Details : Passport No – M4180590
Place of Issue – BAHRAIN
Date of Expiry – 23/08/2024