Engineering Graduates with 9 years broad experience in design and build project, project management, MEI design and installation, project execution as well as testing and commissioning water and wastewater treatment plant projects across South East Asian countries.

Skill Set

Project handling and management, M&E design and installation, water and wastewater treatment plant

Professional Information

Total Experience : 9

Nationality : Malaysia

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

Over 9 years’ broad experience in overseeing end to end project design and management of water and wastewater treatment plants in line with set timeframes, scopes and budget. Well versed in expediting engineering design and MEI installation as well as testing and commissioning coupled with excellent acumen in developing collaborative understandings in design and construction with consultants, contractors as well as end users alike. Recognized as a self-driven and decisive professional with solid multitasking capabilities.

STRENGTHS
Project Management
Engineering Design
MEI Installation
Project Team Leader
Project Scheduling & Execution
System Testing & Commissioning
Structural Design & Construction
Cross-functional Collaboration
Process Flow Design
Operational Training
Piping Design & Installation
Process Monitoring

CAREER HIGHLIGHTS

• Instrumental in spearheading teams in expediting the end to end design and build of local as well as
international water and wastewater treatment plant projects in line with design and within the set timeframes, manpower and budget.

• Played a key role in supervise and monitor project progress, operational, testing and commissioning the system to successfully commissioned and handover to end user.

WORKING EXPERIENCE

INDUSTRIAL WATER ENGINEERS (M) SDN BHD

Assistant Project Manager (2015 – Present)
Senior Project Engineer (2013 – 2015)
Project Engineer (2010 – 2013)

Work Description:
• Oversee the end to end design and construction of wastewater treatment plants in line within projects
scopes, timeframes as well as budget.
• Develop engineering design & drawing in process flow, civil guideline, mechanical, piping routing
as well as control philosophy and control panel.
• Define the project schedule while coordinating the design and engineering teams onsite.
• Lead the equipment and system installation [Pre-Treatment Process (Oil Water Separator and Static
Screen), Chemical Treatment (Dissolve Air Floatation DAF and Dosing Systems), Biological
Treatment (MBBR, UASB, Aeration system & SBR) and Dewatering Process (Belt Press, Filter
Press and Screw Press)].
• Lead the commissioning works, process monitoring as well as providing the training

Projects Delivered:

Local Projects (Malaysia)

• Project: Upgrading WWTP (600m3/d) at KL Supreme Sdn Bhd (Team of 3)
Key Deliverables: Led the upgrading of an existing WWTP including installation of biological (MBBR) and chemical treatment systems (DAF) for a chicken slaughtering house in Kuala Lumpur.

• Project: New WWTP (450m3/d) for Hume Cemboard Sdn Bhd (Team of 2)
Key Deliverables: Headed the design, construction and commissioning of a new WWTP including chemical (clarifier system) as well as biological (MBBR and Aeration) systems.

• Project: Upgrading WWTP (1800m3/d) for Kuantan Oil Products (Team of 2)
Key Deliverables: Installed a new chemical treatment system (DAF) into an existing biological process in treating palm oil refinery wastewater.

• Project: Leachate Treatment Plant (2000m3/d) for Kayu Madang (Team of 2)
Key Deliverables: Constructed a leachate treatment plant with chemical treatment system (DAF) while introducing the MBBR biochip system in treating leachate wastewater.

• Project: Water Treatment & Dewatering Plant for Kejuruteraan Sheafi (Team of 4)
Key Deliverables: Managed the full cycle design and construction of chemical clarifier and dewatering system one of the largest water treatment plant for Pengurusan Air Pahang (PAIP) in Pahang.

• Project: New WWTP for Hershey Malaysia Sdn Bhd (Team of 4)
Key Deliverables: Led the end to end design, construction and commissioning of new wastewater treatment plant (600m3/d) including the introduction of an anaerobic (UASB) system in treating high COD loading, together with DAF and MBBR system.

• Project: New WWTP for Ramly Food Processing Sdn Bhd (Team of 3)
Key Deliverables: Oversaw the design, construction and testing of a new wastewater treatment plant (1200m3/d) with DAF and MBBR system for the new food processing plant.

• Project: Kossan Rubber Industries Sdn Bhd (Team of 3)
Key Deliverables: Headed the end to end design and construction of a new wastewater treatment plant (1600m3/d flow) with DAF and MBBR system introduced in treating the latex industry (rubber glove) wastewater as well as using belt press and filter press for dewatering system.

• Project: Nestle Manufacturing Sdn Bhd (Team of 3)
Key Deliverables: Led the upgrading of an existing wastewater treatment plant including installation and commissioning of new chemical treatment systems (DAF).

• Project: Coca Cola Bottlers Malaysia Sdn Bhd (Team of 2)
Key Deliverables: Led the design, construction and commissioning of a wastewater treatment plant with biological treatment (MBBR) and DAF system as chemical clarifier.

Overseas Projects

• Project: Pec-Tech Asianagro Agung Jaya, Jakarta, Indonesia (Team of 3)
Key Deliverables: Led end to end design, construction and commissioning of a new wastewater treatment plant including chemical (Microfloat) and biological (MBBR & ASP) processes.

• Project: Pec-Tech Sari Dumai Sejati Palm Oil Refinery, Dumai, Sumatra, Indonesia (Team of 4)
Key Deliverables: Designed, constructed and commissioned a new wastewater treatment plant encompassing biological treatment and chemical treatment (Microfloatation) for one of largest oil refinery complex in Sumatra (2000m3/d).

• Project: ACAPALM Plantation, Balikpapan, Indonesia (Team of 3)
Key Deliverables: Designed, constructed and commissioned of a new wastewater treatment plant with DAF system, Anaerobic MBBR, MBBR and Aeration process for oil refinery plant (500m3/d).

• Project: Pt Cibadak Indah Sari Farm, Jakarta, Indonesia (Team of 3)
Key Deliverables: Oversaw the design, construction and testing of a new wastewater treatment plant (1700m3/d) with DAF and MBBR system for a new chicken slaughtering plant.

• Project: Ayamku Chicken Slaughtering House, Brunei Darussalam (Team of 3)
Key Deliverables: Spearheaded the design, construction as well as commissioning of the first chemical and biological wastewater treatment plant for chicken slaughtering plant in Brunei.

• Project: Gillard Middle East FZE, (2000m3/d) Chicken Slaughter House, Uzbekistan (Team of 4)
Key Deliverables: Led the design, installation and commissioning of a new wastewater treatment plant with biological treatment (MBBR & ASP) as well as chemical treatment (DAF) for largest slaughtering plant in Uzbekistan.

• Project: Gillard Middle East FZE, (150m3/d) Latex Glove WWTP, Uzbekistan (Team of 3)
Key Deliverables: Designed, constructed and commissioned a new wastewater treatment plant for new latex glove industry, using DAF, Anaerobic MBBR and MBBR system.

• Project: Polytrade Inc (2000m3/d) Chicken Slaughter House, Philippines (Team of 4)
Key Deliverables: Led end to end design, construction and commissioning of a new wastewater treatment plant including chemical (DAF) and biological (MBBR & ASP) processes as well as dewatering systems.

Project: La Primera Pollo Inc (1950m3/d) Chicken Slaughter House, Philippines (Team of 4)
Key Deliverables: Oversaw the design, construction and testing of a new wastewater treatment plant (1200m3/d) with DAF and MBBR system for the new chicken slaughtering plant.

• Project: Montida (1200m3/d) Chicken Slaughter House, Mauritius (Team of 3)
Key Deliverables: Designed and constructed a new wastewater treatment plant encompassing biological treatment and chemical treatment (DAF), MBBR and Aeration System (ASP)