Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Mohammed Farhan Farooq Subhan

Candidate ID: 1639801

Career Summary

I have around 15 years of profound experience in the construction industry working for high rise , towers , hotel buildings, villas and mansion project and infrastructure works.

Skill Set

Project Management , Towers , Villas & high rise , infra works

Professional Information

Total Experience : 14

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Site Engineering / Projects

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

MOHAMMED FARHAN

Dubai
Mobile No :- 0558213885, 0558619722
Email: - farhanms81@gmail.com

OBJECTIVE:
An ambitious and dedicated civil engineer with strong practical and technical skills and a range of experience of 14 years within construction engineering and project management. Having a sound knowledge of construction methodologies and manpower resource allocation for overall effectiveness, cost, reliability, and safety. Currently seeking a challenging professional career as a Construction Manager that can utilize my potential and knowledge for completing projects on time and within budget and which ensures professional and personal growth.

PROFESSIONAL EXPERIENCE: 14 YEARS

EDUCATION

B.E Civil Engineering May 2005, Rizvi College of Engineering, Mumbai, India.


COMPUTER SKILLS

PRIMAVERA (CADD Centre), STAAD Pro, AUTO CAD (CADD Centre),

C programming, Pascal programming, M S Dos, M S Office.


Current Organization: M/s. Meydan - Sobha Construction L.L.C FZC.

Current Designation: Project Engineer (From April-15 to till date).

Current Project: Mohammed Bin Rashid Al Maktoum City District One.

Client Name: M/s. Meydan – Sobha group L.L.C

Scope of work: The Project involves developing 45 million square feet of free hold land into an exclusive destination of 1500 luxury villas and Mansions surrounded by expensive green parks, Crystal lagoons on 7 Km Stretch with man-made sublime beaches, 8.8 km of cycling and horse riding trails.


The Contract value of the project is estimated to 10 billion US dollars.






Previous Organization: M/s. ARABTEC CONSTRUCTION L.L.C

Previous Designation: Section Engineer (From May-13 to April-15).

Previous Project: Najmat The Wave Tower- Abu Dhabi as Project Engineer May 2013 to April 2015

Client Name: M/s. Aabar Properties LLC.

Scope of work: Reem Island’s Najmat Abu Dhabi is a 23-storey high-rise stylish residential development spread across a built-up area of approximately 65,000 m².

The Contract Value of the project is estimated to AED 300 mill


Previous Organization: M/s. Al HABTOOR LEIGHTON GROUP.

Previous Designation: Sr. Site Engineer (From March-07 to April-13).

Client Name: Al Hamid Group.

Previous Project 1: Al Bustan Complex May 2012, Abu Dhabi, As a Sr. Site Eng.

Scope of work: The complex includes a shopping mall with associated leisure activities, an office building, a serviced apartment building, and an unfurnished apartment building. All buildings are 15 storeys high. The development includes more than 100,000 square metres of underground car parking over five levels. It also has two residential buildings with a mix of one, two and 3 BHK apartments, a serviced apartment building and a hotel to be operated by the Accor Group as a Novotel Hotel

The Contract Value of the project is estimated to US$: 583 Million


Previous Project 2: Capital Gate January 2011, Abu Dhabi, As a Sr. Site Eng.

Client Name: M/s. ADNEC.

Scope of work: The project comprised enabling works and construction of Capital Gate.
The scope of work also included the relocation of existing services which run through the site, and the excavation, shoring and dewatering of the basement. Designed to be 160 metres high with 35 floors of varying sizes, the tower consists of a basement level, a ground floor, a mezzanine level, 16 levels of office suites and 16 levels of hotel accommodation

The Contract Value of the project is estimated to US$: 231 Million

Previous Project 3: Buildings by Daman, Dubai, January 2010 as a Sr. Site Eng.


Client Name: M/s. Daman Real Estate.

Scope of work: The first tower is a 20-storey structure that mostly houses office space with hotel amenities on the top three levels. The second tower, partially overlapping the office tower, is a 60-storey tower which is composed of two structures that are interconnected with a structural steel link bridge that has impressive sky gardens on both sides.

The Contract Value of the project is estimated to US$: 190 Million
Previous Project 4: Emerald Palace Hotel, Kempenski, September 2009, Dubai, as Site Engineer

Client Name: M/s. Sunny Beach Properties.

Scope of work: This project consisted of the construction of 20 villas, an apartment building and a hotel on Dubai’s man-made island, the Palm Jumeirah. It has a total built-up area of around 206,000 square metres.
The apartment building includes a basement, ground floor, six floors, and a roof terrace complemented by dome structures.

The Contract Value of the project is estimated to US$: 21 Million

Previous Project 5: Business Bay Executive Towers- Dubai (U.A.E) March 2007 as Jr site Eng.

Client Name: M/s. Dubai Properties.

Scope of work: The scope of work included piling, construction of the substructure and superstructure, services and fit-out of 11 towers G+40 featuring luxury residential apartments, a 5-star hotel tower, a shopping mall, clinics, health clubs, and leisure facilities.

The Contract Value of the project is estimated to US$: 550 Million

Previous Organization: M/s. Neev Infrastructure Pvt Ltd, Mumbai, India.

Previous Designation: Site Engineer (From March-2005 to March-2007).


Previous Project 1: Jayant Darshan: March 2006
Previous Project 2: Darshan Heights: March 2005


Responsibilities:

• To organize and manage the actual work on site in order to meet programs and quality standards set by the company.
• Make target programs for the smooth flow of the project.
• Estimation of quantities for the project.
• Make progress meeting with the subcontractors to achieve the targets as per the planning.
• Make delay notice documentation for any poor progress for the subcontractors.
• To provide leadership to project/ site staff in identifying and resolving disputes in order to meet contractual obligations.
• To set up project controls in order to monitor the work progress in comparison with the planned activities of the master schedule.
• To coordinate with subcontractors in order to ensure proper execution of construction works schedule in accordance with the approved shop drawings and project progress plan.
• Managing all the activities related to the boundary wall works and external works.
• Coordination for all the structural and finishing related activities and report to the Project Manager.
• Coordination for the FAÇADE and aluminium system works.
• To review specifications/ drawing in order to resolve any discrepancies or conflicts.
• To promote awareness of individual responsibilities in order to meet company targets in health, safety and environment.
• To assist in monitoring cost control measures on labor cost, material movements, material use and wastage in order to ensure productive work and continually reduce wastage.

PERSONAL DETAILS

Date of birth : 18 Oct 1981
Father's Name : Mohammed Abdul Subhan
Nationality : Indian
Marital Status : Married
Driving license : UAE & India - Yes
Visa : Permanent Residence


I hereby declare that the information stated above is true to the best of my knowledge.



Updated as on –7/29/2019 Mohammed Farhan Farooq Subhan