Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Fiaz Ahmad

Candidate ID: 1643764

Career Summary

Engineering Graduates/PG with 15 years experience in Engineering functional area

Skill Set

Piping,Structure Fabrication,Erection. Hydro testing,Pre Commissioning.

Professional Information

Total Experience : 15

Nationality : Pakistan

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile



Fiaz Ahmed


PERSONAL HOME ADDRESS
Born in Sahiwal, 15th April 1984 Chak No 50/G.D Noor Shah Tehsil & District Bahrain Sahiwal Punjab Pakistan
? +97333864473, ? + 92-3014353648
? wattoj533@yahoo.com & fiazahmad100@gmail.com

CAREER OBJECTIVE
Seeking Challenging assignment to associate myself with the organization where there is a chance to exhibit my techno-proficient skills and to be part of the mechanical team that work dynamically towards the growth of the organization in my professional carrier. I have15 year’s hands on experience in fabrication and erection of pipelines, Steel structure and tanks. Having good knowledge of hydro testing, Pre-commissioning.


EDUCATIONAL QUALIFICATION
• SSC from Multan Board of Intermediate & Secondary Education
• Diploma of Associate Engineer (Mechanical) Awarded by Punjab Board of Technical
• B-Tech (Honors) Mechanical from Preston University Islamabad

COMPUTER LITERATURE
• Microsoft Office 2013
• Primavera Project planner (P6)
• AutoCAD 2016

DRIVING LICENSE
Having LTV driving license (Bahrain)


FAMILIAR WITH
• Construction Drawings such as GA, P&ID, Piping Isometrics, Equipment and Structural.
• Familiar with Client Job Specifications and Work procedures.
• Familiar with Bapco & Tatweer work permit system.
• Familiar with Client Specifications and Method Statements and Risk assessments.
• Familiar with Lifting & Rigging requirements of Bapco and Tatweer Petroleum.
• Familiar with different materials fabrication and erection such as BS S275 Jr, API 5L, ASTM SA 36, SA 53, SA105, SA 106, SA 234, SA 515, SA 516, SA672, SA 333, SA350, SA420, SA671, SA 240, SA 312, SA358, SA182, SA403, SA387, SA 335, SA 691, B705, INC825, NACE materials etc. and with ANSI standards of B36.19, B 36.10, B 16.5, B 16.9 etc.
• Thorough knowledge in ASME B31.3, and API codes and welding Standards of ASME Section IX.
• Familiar with P numbers, Selection of electrodes, Welding Supervision etc.
• Final line checks and punches preparation. (A, B and C punches)
• Hydrostatic and Pneumatic test activities.
• Heat shrinkage sleeve application for FBE Coated pipes,
• Cold and Hot tap Tie in works.
• Reinstatement activities.
• Proper coordination with Quality Department.
• Proper coordination with Sub Contractors.

? EXPERTISE IN MECHNICAL & PIPING WORKS

• Prepare daily reports of work progress and man power utilization.
• Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.
• Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning.
• Issue the work permits ensuring HSE requirements.
• Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.
• Supervision of all piping works and ensures safety and quality standards of the client.
• Inspection and approval of all the QA/QC submittals of the subcontractor.
• To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work.
• Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.
• Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.
• Monitoring the QA/QC Documentation of the subcontractors and ensure that all the activities are incorporated to their system on daily basis and can be traced according to our requirements.
• Supervise and Inspection of cold and hot insulation, cladding on piping and equipments.
• Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.
• Scheduling of work prioritizing in sequential order.
• Planning & Allocating of Manpower, Materials & Equipments.
• Planning of Work and scheduling.
• Liaison with Quality Control Personnel for inspection and ensuring error – free.
• Supervision of Piping Pre – Fabrication, Erection, Hydro – Testing.
• Supervision of Pipe Stringing, Welding, Lowering, Hot – Tapping etc.
• Supervision of Boiler Structure and Piping Erection
• Coordination of Tank construction works
• Work Permit Management for Safe working
• Inspection of the work to adhere to strict Quality Maintenance
• Overseeing of Safety Management System at the work place
• Handling of Complete Documentation work & Record Keeping
• Assists the Cost: Manager in the supervising and monitoring of work execution at site.
• Responsible of Contractors supply material as per Construction documents.
• Review/approve the project schedule and mobilization plan
• Review Method Statements, rigging plan
• Liaise with operations, safety, QA/QC for smooth functioning of SD jobs
• Foresee constructability difficulties and prepare a solution.
• Participate in daily review meeting and report progress/areas of concern.
• Verifies the adequacy of equipment to perform work safely. Supervise and coordinate the activities of construction contractors.
• Ensure that contractors comply with all aspects of the worksite HSE plan and policy; site regulations, permit to work and client requirements. Ensure by leadership and guidance that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions.
• Maintain daily supervisory surveillance checks and records ensuring that contractors management and supervision are providing safe working conditions and permitting procedures, all required competent personnel protective equipment, adequate supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets. Ensure by leadership and guidance that contracted works meets all practical, commercial, requirements of productivity, quality and contract target completions.
• Verifies competence of construction contractor’s personnel.
• Routinely study, check and review all contractors’ scope as detailed in drawings, specifications and instructions, ensuring contractors proper interpretation and compliance with the latest AFC drawings and specifications.
• Ensure proper change control by issuing field instructions for all changes, reviewing technical queries to ensure responses are appropriate and practical, and reviewing advanced revision notices prior to issue to contractors to ensure correct use of construction resources.
• Ensure contractors dimensional control methods for checking that the works are properly set out. Supervise specialist surveying contractors where necessary.
• Ensure supervisors carryout the witness, inspection and surveillance checks in accordance with the quality plan and the requirements of the quality control manager.

? EXPERTISE IN HYDRO TEST AND PRE- COMMISSIONING

• Planning, Execution, Control and Supervision of all activities like Test pack and Test equipment preparation.
• Planning, Execution, Control and Supervision of all activities like Pigging, Pneumatic testing, Hydro testing, Watering, Dewatering, pressurizing, Depressurizing, Nitrogen purging etc.
• Pipeline of different material like, SS, CS(Corrosion resistance alloy lined/gladded inside),LTCS, Nickel alloy and GRE carrying hydrocarbon at high pressure range, in compliance with Project specification, International codes and Project HSE plan.
• Communicates and interfaces with other engineering disciplines, Coordination with Pipe engineers, QA/QC and HSE team in the organization and those of client for related activities.
• Attending/generating punch points as a part of mechanical completion activities. Confirm there are no category A punch list items.
• Monitor work permit issuances and check strict implementation of all safety requirements during testing & pre-commissioning works.
• Review of Hydro test Package and check the limit of test pack.
• Confirm all valves are set to the pre- test position shown in the system P&ID limits.
• Isolation Hand Valves have been set in positions specified by the checklist prior to the test.
• Organize plans for execution of Pre-commissioning / Commissioning activities.
• P&ID check for system readiness for mechanical completion, punch list, co-ordination of mechanical completion in accordance with procedures
• Compiling “As built” drawing to reflect changes implemented during commissioning activities also compilations & confirming of completed Punch List items, participate in demonstration handover/ acceptance of system to the operation group (Client).
• Involved in joint inspection with client in order to satisfy the project standard, safety, performance & legislative requirement before ready for startup.
• Supervising various discipline technicians in completing the commissioning activities which promoting safe working practice in line with the safety management system

? EXPERTISE IN PLANT SHUTDOWN (OIL & GAS,PETROCHEMICAL)

• Shut Down Permit to Work Coordination.
• Vessels/Rotating Equipment inspection.
• Interpret and understand P&IDs, Isometric & GA drawings.
• Commissioning Start up / Shut down Operations-Process Plants.
• Oil Gas & Petrochemical Services Construction Mechanical completion Pre-commissioning.
• Coordinating shell course shifting from fabrication yard to tank area
• Preparation/coordination in getting approval of daily inspections from the client.
• Getting the mechanical clearance for testing.
• Supervise and manage the subcontractors for the construction of storage tanks and report to engineer.
• Monitoring the tank age job as per required by client.
• Lead and coordinate with the QA/QC in all quality related aspects.
• Review the approval documents about Inspection Test Plan of the project to ensure inspection shall be in accordance with the required quality standard and procedures.
• Equipments-Leveling/alignment recording forms for horizontal and vertical package type-Axial/radial, soft foot parallelism forms for pumps and compressors.
• Execute and submit inspection documentation works for static and rotating equipments
• Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage
• Check the physical condition of anchor bolts and leveling of foundations before erection of equipments.
• Check preservation status of equipments at site.
• Obtaining a complete check list of the assembling equipment and keep a record of a same
• Responsible person for clearance of materials inspection
• Responsible for erection of equipments such as pumps, vessels, tanks and compressors and other equipments as per the approved method statement.
• Check equipment orientation before and after erection.
• Check the shimming requirements for static and rotating equipments
• Check the condition of pump alignment (axial/radial) without piping prior for preparation for piping installation.
• After getting clearance note of civil about foundation ready preparation for alignment and leveling and checked setting of padding plates
• Responsible for modification works.
• Good knowledge in permit to work system


EXPERIENCE SUMMARY
CURRENT EMPLOYER
MCSC (Mechanical Contracting & Services Company) Bahrain

PROJECTS DETAIL DONE WITH MCSC

1. Duration : April 2019 to till now
Project : EFPS (Enhancement of fire protection system)
Client : JGC
Owner : Bahrain Petroleum Company (BAPCO)
Position : Assistant Engineer Mechanical Site

2. Duration : December 2018 to April 2019
Project : Alba Potline 6 Project (GTC-1 & 2
Client : Fives Solios
Main Client : Bechtel International
Owner Project : Alba B.S.C
Position : Assistant Engineer Mechanical Site

3. Duration : April 2017 to November 2017
Project : Relocation & Modification of Bapco/Tatweer/Ministry Facility
Client : Bapco/Tatweer/Ministry of work
Consultant : Teboddin Middle East
Position : Project Supervisor (Piping & Mechanical)

4. Duration : August 2016 to April 2017
Project : NAG (Non Associate Gas) Project
Client : Petrofec
Owner : Tatweer Petroleum Company
Position : Project Supervisor (Piping & Mechanical)

5. Duration : November 2014 to October 2016
Project : General Construction Services
Client : Tatweer Petroleum
Position : Project Supervisor (Piping & Mechanical)

6. Duration : February 2013 to August 2014
Project : 3#SRU (Sulphur Recovery Unit)
Client : Technip
Owner : Bahrain Petroleum Company (BAPCO)
Position : Project Supervisor (Piping & Mechanical)

7. Duration : January 2013 to March 2013
Project : Shutdown of BAPCO oil refinery plant
Position : Supervisor (Mechanical)



8. Duration : August 2012 to October 2013
Project : New Well Manifold Project
Consultant : JGC Engineering
Client : Tatweer Petroleum
Position : Supervisor (Hydro testing & Pre-commissioning)

9. Duration : August 2011 to December 2012
Project : Lube Base Oil Project
Company : Samsung Engineering
Owner : Bahrain Petroleum Company (BAPCO
Position : Pre-Commissioning Supervisor

10. Duration : February 2010 to August 2011
Project : Lube Base Oil Project
Client : Samsung Engineering
Owner : Bahrain Petroleum Company (BAPCO
Position : Supervisor (Projects)


PREVIOUS EMPLOYER
DESCON ENGINEERING LTD PAKISTAN
1. Duration : June 2009 to Jan 2010
Position : Supervisor (Piping & Equipments)
Project : Engro Expansion Project Daharki
Consultant : Snamprogetti S.p.A
Client : Engro Expansion Project (Enven 1.3) Daharki
2. Duration : 9-Aug 2008 To 18-Feb 2009 (Ruwais UAE)
Position : Supervisor (Piping)
Project : Urea Debottlenecking Project
Client : Fertil

3. Duration : 25-10-2007 To 20-07-2008 (Pakistan)
Position : Supervisor (Mechanical)
Project : DG Cement Plant Expansion Project
Client : DG Cement Pakistan Ltd

4. Duration : 05-07-2006 To 15-06-2007 (Pakistan)
Position : Assistant Supervisor (Mechanical)
Project : 200 TPH Water Tube Boiler
Client : Bulle shah paper Mill

1. Duration : 5-11-2004 to 20-06-2006
Company : Honda Atlas Cars Pakistan Limited
Position : Technician
Department : Maintenance
Role and Responsibilities
• Electrical, plumbing, carpentry, masonry and painting.
• Repairing and treating structures such as showers, sinks, appliances, doors/cabinets, walls and building exteriors
• Make ready units for new move-ins
• Have a working knowledge of HVAC systems and be able to maintain, repair and replace HVAC Systems
• Responsible for 24 hour emergency maintenance
• Schedule and complete preventative maintenance program
• Complete grounds work such as: grounds pick upsweeping and light landscaping.




PERSONAL DETAILS:
Father’s name : Mohammad Riaz
Nationality : Pakistani
Date of Birth : 15-04-1984
Marital Status : Married
NIC NO. : 36502-4440880-7
Passport NO. : JT1158803
Language Known : English, Urdu, Hindi, Punjabi
Mobile No : +97333864473

DECLARATION:
? Here by, I declare that all the above mentioned information’s are correct and true to the best of my knowledge.