Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Jose Martins

Candidate ID: 1730588

Career Summary

Engineering Graduates/PG with 20 years experience in Civil Engineering functional area

Skill Set

Civil Engineer

Professional Information

Total Experience : 20

Nationality : Portugal

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

Jose Martins > CIVIL /STRUCTURAL DESIGN ENGINEER – Oil & Gas

• Highly dynamic engineering professional, offering 20 years of experience in design and project supervision, site management, field operations, team supervision and leadership, and client liaison in the construction industry. Construction expert with a degree in civil engineering with expertise in a handling a wide range of projects whilst working in challenging environments, ensuring superior quality and efficient service delivery, adding value to the business consistently. Skilled in managing multi-million-euro civil projects utilizing client management skills, strategic insights, and sharp planning techniques towards managing contractual requirements whilst completing projects on time and to the desired quality level. Visionary thinker, an inspirational leader, and an outstanding team player utilizing collaborative approaches in work to translate vision into achievements whilst demonstrating strong analytical, problem solving, and decision-making skills with a passion for excellence in quality and construction services. Familiar with international codes & Standards such as: (BS, ACI, ASTM, IBC and AASHTO).
• Front-End Engineering Design (FEED), engineering design approach used to control project expenses and thoroughly plan a project before a fix bid quote is submitted. It may also be referred to as Pre-project planning (PPP), front-end loading (FEL), feasibility analysis, or early project planning.
o Contents
o Overview
o FEED Methodology References External links
• The FEED basic engineering which comes after the Conceptual design or Feasibility study. The FEED design focuses the technical requirements as well as rough investment cost for the project. The FEED can be divided into separate packages covering different portions of the project. The FEED package is used as the basis for bidding the Execution Phase Contracts (EPC) and is used as the design basis.
• FEED will reflect all of the client's project-specific requirements and avoid significant changes during the execution phase. During the FEED phase there is close communication between Project Owners and Operators and the Engineering team to work up the project-specific requirements.
• Front-End Engineering focuses on technical requirements and identifying main costs for a proposed project. It is used to establish a price for the execution phase of the project and evaluate potential risks. It is typically followed by Detailed Design (or Detailed Engineering). The amount of time invested in Front-End Engineering is higher than a traditional quote, because project specifications are thoroughly extracted and the following typically developed in detail:
• Project Organization Chart
• Project Scope
• Defined civil, mechanical and chemical engineering
• HAZOP, safety and ergonomic studies
• 2D & 3D preliminary models
• Equipment layout and installation plan
• Engineering design package development
• Major equipment list
• Project timeline
• Fixed-bid quote
• All of these documents would be developed in detail during a design review after a quote has been agreed to. Company using FEED will develop these materials before submitting a quote.
• Front-end engineering used by design/build engineering facilities industries including:
• Construction
. EPC
• Technical supervision over Civil and Structural engineering to bring the design into full compliance with the Contract Work History
2008-08 - 2019-11 Civil/Structural Engineer - Oil & Gas >Arabian Gulf Oil Company, Benghazi, Libya
• Oil & Gas Projects; Scope of Work, Time Schedule Work Breakdown Structure (WBS) and Budget Appraisal.
. Structural Engineering, Steel and Concrete Design for EPC Projects of buildings and infrastructures: Desert Airports, Terminal building, Office Buildings, Management Buildings, Telecom Buildings, Accommodation blocks, Substations, Water Tanks, Foundations,
• Oil Spill Response Center design, for Oil & Gas Terminal at Al- Hariga Tobruk -Libya;
• Marine Structures
• Quay Wall
• Finger Jetty
• Gangway
• Pontoon
• Berth
• Ramp
• Ship to Shore System
• Develop studies for maritime and concrete structures
• Prepare MTOs and BOQs
• Prepare S.O.W. and technical specification for maritime construction subcontracts
• Prepare technical documentation for maritime material requisition and assists the procurement dept. in the technical evaluations
• Created visual concepts either by hand or with assistance of computer programs.
• Obtained approval of concepts by submitting rough drafts to management or to client.
• Developed and maintained expense budget while applying drawing 3D, REVIT 2019 continually decrease expenses
. Consulted with Engineering & Construction Manager to identify design requirements for each project. EPC experience, verification and acceptance of engineering, construction and other documentation on civil and structural discipline, Technical evaluation of bidders offers during tender stage.Engineering support during contract preparation at Oil&Gas Company: - Construction of The Airport Terminal Building at Messla Field.- Supply and Installation of The New Fuel Facility Storage Tanks and Refueling Station at Messla Field Airport,
- Construction of Fire Fighting Vehicle Shelter at Messla Field.
- Repairs & Maintenance of Centre Hall at Seismic Data Processing Center In Benghazi.
- Construction of Oil Spill Response Centre at Tobruk Terminal.
- Construction of Telecommunication Building at Tobruk Terminal,
- Construction of Main Administration Building at Al-Hariga Harbour, Tobruk,
- Design & Construction of Pile Foundations for Installation of Three (3) New Automatic Manifolds at Messla Gathering Centres Gc-07 & Gc-O8.
- Work & Technical Specification for Trailers Substations & Warehouse Substation at Sarir/ Messla Fields
- Rehabilitation and Upgrading of Sarir Airport,
- Construction of Connecting Bridge Between Main Office and Computer Buildings at Agoco H/Q El Kish- Benghazi,
- Revamping of Existing Shipping Yard Office Building at Tobruk Terminal,
- Construction of New Offices Building, at Company HQ, El-Kish, Benghazi” - Training Classroom Building,
- Remaining Works for Construction of The Fire Station Building at Majid Field,
- Construction of The Laboratory Building at Sarir Field,
- Construction of Field Accommodation Blocks at Sarir Field,
- Construction of Field Accommodation Blocks at Nafoora Field,
- Construction of Field Accommodation Blocks at Messla Field, - Construction of Field Accommodation Blocks at Beda Field,
- Construction of Field Accommodation Blocks at Hamada Field,
- Construction of Pipe Racks for Stockpile / Storage of Pipes at Sultan Field,
- Construction of Security Fence for Christmas Tree at Sultan Field,
- Inquiry for Engineering & Consultancy Services; Pavement Inventory and Evaluation at Agoco Oilfields Airports,
- Report Assari Offer Evaluation: For Engineering & Consultancy Services; Pavement Inventory and Evaluation at Beda Oilfield Airport, Benghazi - Contractor Ferrostaal Submittals - Concrete Mix Design, drawings, calculations and others
- Construction Of “Multi-Storey Car Parking Building at Agoco Headquarter El-Kish Benghazi”,- Rehabilitation & Upgrading of Beda Airport. - Construction of Petroleum Facilities Guard Building at Beda Field,. - Foundations for Supply and Installation of one Stand-By 1st Stage Compressor and one (1) Stand-By 2nd Stage Compressor at Sarir GTP,
- Foundations For “Installation of The New Imva-4.16kv/208-120 And 250 Kva-4.,16kv/480v-60hz Substation (Containerized Type) and the Relevant Equipment for Nafoora Field”.
- Foundations for (8) Eight Substations for Sarir and Majid Field.
Architectural detailed design for oil company
- Airport Terminal Building at Messla Field..
-New Fuel Facility Storage Tanks and Refuelling Station at Messla Field Airport,
-Fire Fighting Vehicle Shelter at Messla Field. No: F 68, - Repairs & Maintenance of Centre Hall at Seismic Data Processing Centre at Benghazi.
- Oil Spill Response Centre at Tobruk Terminal.
– Passenger Station at Beda Airport.
-Petroleum Facilities Guard Buildings at Beda Field,
- Steel buildings. Structural detailed design for oil company - Steel buildings. - Manual Manifolds Foundations,
- Filing Machines Installation of six machines with 4ton each other on 1st floor at AGOCO HQ, Benghazi..
2005-12 - 2008-06 RESIDENT ENGINEER Base4 , Ifrane, Morocco
• Team Leader of: Architecture, Structural, MEP and Infrastructures (RFI´s, Shop Drawings, Contractors Submittals appreciation) at Ifrane Palace Project
• Identified and resolved process issues to encourage smoother procedures, more efficient workflow and overall business growth.
• Liaised with MEP Engineers on defining product features and managing takeoffs involving features, schedule and life-cycle.
• Managed and archived quality documentation and participated in internal and external quality audits.
• Team Leader of Inspectors: Architecture, Structural, MEP and Infrastructures (RFI´s, Shop Drawings, Contractors Submittals appreciation) at Ifrane Palace Project
• Updated quality control standards, methods and procedures to meet compliance requirements.
. Determined and recommended methods to address improvement opportunities.
• Developed exceptional attendance record with special attention to punctuality and preparation to work upon arrival.
• Tracked customer shipment requirements to improve customer satisfaction while increasing service efficiencies.
2000-01 - 2005-11 DESIGN MANAGER > GUARDAPROJECTS, Guarda, Portuga
• Work along with Architecture, Structural, Infrastructures, MEP; Luxury Villas, Hotels, Residential, Commercial and Industrial
• Tracked customer shipment requirements to improve customer satisfaction while increasing service efficiencies.
Education / Cerification 1989-02 Master of Science: Civil Engineering
Universidade de Coimbra (UC)– Portugal
Chartered Professional Engineer (CPEng) status.: Licence nº23196
Bsc. Degree: Architecture IMPP - Portuga Institute of Public Markets, the Real Estate and Construction (IMPP) - Portugal
Chartered Professional Architect (CPArch) status.: Licence nº144

References available on request