Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Abdul Rasheed Mohammed

Candidate ID: 238630

Career Summary

About 22 years of professional experience in the areas of HVAC systems, Plumbing systems, Fire protection systems. UPDA-Grade A in Qatar. Lead & own the process of preparation of design deliverables with due consideration for applicable Codes & Standards.

Skill Set

Lead/Senior Mechanical Engineer

Professional Information

Total Experience : 20

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

ABDULRASHEED MOHAMMED

Date of Birth : 28th July, 1968
Nationality : Indian
Specialization : Mechanical Engineering / HVAC,Plumbing &
Fire Protection systems
Position
MMUP :
: Lead Mechanical Design Engineer
UPDA GRADE- A- QATAR


KEY QUALIFICATION AND PROFESSIONAL STATUS

1991 B.E. in Mechanical engineering from Osmania University, Hyderabad, INDIA
1997 Member of Indian engineers forum, Riyadh, KSA
1998
2017 ISO-9001-Certified internal auditor.
UPDA GRADE “ A “

SUMMARY OF KEY EXPERIENCE:
About 22 years of professional experience in the areas of HVAC systems, Plumbing systems, Fire protection systems. Leading the team of engineers and draftsmen to accomplish the projects.

Pre-contract works:
Designing of HVAC systems: Centralized air-conditioning systems: Chilled water Air-conditioning (Air cooled chillers), Package units Air conditioning, Split unit air-conditioning, Heat recovery units, Humidifiers, Air handling units with constant /variable air volume terminals and district water cooling systems, VRF units. Heat load calculations by computer programs (HAP, Elite CHVAC), Chilled water pipe sizing, Duct sizing, Pressure drop calculations of chilled water piping and External static pressure loss calculations of A/C units, Primary and Secondary pumps sizing, Equipment selections, Air distribution systems, Smoke ventilation, Stair pressurization, Bill of quantities, cost estimations, preparation of design reports, preparations of specifications.
Preparation of ACMV drawings and calculations for the QCDD approval- DC2

Designing of Plumbing/ Drainage systems ( domestic water supply, Sanitary drainage, Storm drainage,)
Hot and cold water pipe sizing, Cold water pump sizing, Under ground tank, overhead tank sizing,
Electric water heater sizing. Sanitary drainage pipe sizing, Vent pipe sizing, Septic tank sizing, Sump and sump pump sizing. Storm drainage pipe sizing, LPG systems, Fuel oil system, Preparations of Bill of quantities, cost estimation specifications.
Designing of Infrastructure works ( Wet utility systems): Foul sewerage systems, Surface/Storm water drainage system. Sizing of Soak aways, Manholes, Storm water holding tanks, Site water networks and Fire water neworks. etc.
Prepartion of Water supply and drainage for KAHRAMAA and ASHGHAL approval- DC2

Designing of of Fire protection systems: Automatic wet Sprinkler systems, Dry & wet Standpipe hose systems, Fire extinguishers, Hydraulic calculations of sprinkler systems by Elite program, Fire pumps sizing, Clean agent systems (FM 200), CO2 systems, Foam water systems etc.
Preparation of Fire Fighting draiwings and calculations for the QCDD approval-DC2

Post contract works:
Reviewing and approving of shop drawings, reviewing and approving of material submittals of HVAC, Plumbing and fire suppression systems, site supervision,

Familiarity and implementation of DESIGN CODES AND STANDARDS:ASHRAE Fundamentals, Applications, equipment. ASHRAE 62 for ventilation, CIBSE, Carrier Hand book, Industrial ventilation, SMACNA, International plumbing code, National plumbing code, QCS-2014, QSDDM, ASPE, NFPA 13, 14, 20, 24, 2001, Royal commission standards, Jubail, QCDD applications, Kahramaa and Ashghal regulations.

Computer proficiency: M.S.Windows, M.S office, Autocad etc.
Engineering programs: Elite HVAC load calculations program, Elite duct sizing, Carrier E20-II Hap 4.4 HVAC Calculations program latest version, Elec. cat carrier equipment selection, Zamil equipment selection, Zamil load calculations, Grundfos pump selection and sarlin pump selection , Elite Fire protection hydraulic calculation program, Kiddie FM 200 program etc.

EXPERIENCE DETAILS:

COMPANY : Gulf Engineering & Industrial Consultancy, Qatar
POSITION : Senior Mechanical Engineer (Acting head )
DURATION : April 2016 to till date
Projects accomplished:
• Civil defense preventive buildings, Al Wakra, Qatar,
Client: MOI (HVAC, Plumbing, FF systems and infrastructure works)
• Al Fazaa headquarters. Client: Ministry of Interior.
Fire Fighting systems
• Dar-al-sharq: HVAC, Plumbing, FF systems & infrastructure works.
• Deaf school. Client: Ashghal
Fire protection sytems.
• Updation of FF system for warehouse for QCDD Approval.
Client: Qatar foundation.
• Al-Mutahida twin towers, Pearl Qatar. (As supervision Consultant)
Client: UDC.
• Qatar Rail Project: ( 2 Metro stations & 1 stabling yard in Qatar)
Worked for MEP space proofing and equipment delivery routing for the metro stations.
• Qatar express way- Road tunnel - E ring road project:
Reviewed and modified the design of Fire Fighting systems prepared from Parsons International for the approvals of QCDD.
• Al shamal STP package 1 and package 2:
Reviewed and modified the design of drainage, water supply, ACMV and FF systems prepared from L&T for the authority approvals.
• Camel race @ Umm bab and Manteq development at Umm alhoul:
Prepared the bid-tender design for the contractors.
• Qatar Early warning Radar, Qatar with PAGE, Southerland, Washington.
Responsibilities include reviewing of the design, coordinating and guiding to page, Washington for the preparation of documents as per the local standards in order to take QCDD approvals for Fire protection systems and ACMV systems.
• Barzan Medical warehouse
Prepared the design for the QCDD-approvals ( ACMV and FF systems ) .

Duties & Responsibilities:

• Design: Involved as senior Mechanical engineer by preparation of design, supervising and guiding junior engineers and draftsmen to design these projects for HVAC, Plumbing, Fire Fighting systems and infrastructure works in accordance to codes, standards and local regulations.
• Attending the meetings and coordinating with clients for their approvals.
• Updating/ coordinating the design for the approvals of Ashghal for drainage, Kahramaa for Water supply, QCDD authorities for ACMV & FF systems.
• Supervision: Worked 5 months as Senior Mechanical engineer for supervision Reviewing/ approving the submittals of shop drawings, material submittals, method statement for HVAC, Plumbing & Fire-Fighting systems.
Attended, witnessed for FAT of AHU/FCU-Mekar-AHU units, ITALY

Zaintech Solutions ( MEP Training institute & consulting Services), Hyderabad, India
( June 2014- Dec 2015) Involved as designing of Mechanical systems of builddings as part time/free lancer and involved as an instructor to train fresh engineers for designing of HVAC, Plumbing and FF systems.

SAUDCONSULT,( Saudi consulting services) Riyadh, K.S.A.(ISO 9001 Certified)
Position: Lead Mechanical Engineer. (March 27,2011 to March 26,2014)

Clients: Royal commission, Jubail and BECHTEL. Worked as Lead Mechanical engineer by managing about 6 Mechanical engineers, and by coordinating with the clients for the designing of the projects
EPC of package Potable water supply plant,
EPC of pacakage SWTP, Early infrastructure works, Landfill,
Completed the Labor camp, which consists of 17 buildings,
Jubail University college,
Ummulqura university chiller plant NO.4, Makkah.
Review of shop drawings for Al-afandi project.

Part-time/ Free lancer in India : (July 2009 to January 2010)
Worked as part time and as free lancer for designing of HVAC, plumbing and fire fighting systems.

WSP MIDDLE EAST, DUBAI ( UK based )
Position : Mechanical Engineer ( January 2008 to January 2009)
Projects accomplished
Expo plaza, Client: DWTC: Worked on Expo Plaza of DWTC comprising of 5 star and 4 star hotels.
Prepared scheme design of HVAC for 4* hotels: Novotel, Holiday Inn, Pull man, Crown plaza.
Dubai world trade center: Buildings: 4 star hotel (13 floors), Offices C1 building ( 12 floors)
Partially worked on 3 star hotel, Offices C2-C5, C6,C7
Prepared the scheme design of HVAC systems comprising of District cooling systems EMPOWER,
Heat exchangers, Secondary pumps, FAHU with heat recovery, AHU, FCU etc.

SAUDCONSULT,( Saudi consulting services) Riyadh, K.S.A.(ISO 9001 Certified)
Position: Senior Mechanical design engineer. (October 17,1994 to October 16, 2006)

Projects accomplished
Women's Campus, Client Royal commission, Yanbu and PARSONS CO, YANBU
Prepared the HVAC design, comprising of chilled water system with 10 chillers of each 425 tons each with Variable and constant Air handling units:
King Fahd National Library, Client: ADA. Prepared the HVAC design and plumbing design.
Industrial Training Institute, Yanbu. Client: Royal commission, Yanbu
The area of this project is 25000 sq.m. Prepared the design report for the systems HVAC , Plumbing and Fire protection system according to the Royal commission standards.
Prepared the complete HVAC design. HVAC system comprises of chilled water system with 4 chillers of 400 tons each with Constant Air handling units.
Operation and Maintenance center. Client: Royal commission, Jubail
There are 20 buildings, Administration, ware house, work shops etc
Prince Bander Private Palace, Riyadh. Client : Haif trading and Contracting
This project was being done in association with ABDULHADI, Jordan and KCA International, London.
This project is comprising of 18 buildings.
Prepared the HVAC design for these buildings. System includes chilled water system with 4 chillers of 400 tons each, Variable air volume AHU's and Constant AHU's, VAV's with or without electric heaters, Chilled water pumps and Humidifiers etc.
Saudi Arabian Airlines Flight Training Center, Jeddah
This Project is comprising of an eight story Flight Operations Training Center facility housing, eight Full Flight Simulators (FFS), several Flight Training Devices (FTDs), Computer Based Training Equipment (CBTs), a three story Flight Safety Training facility housing the door Trainers (DTs). This project is being done in association with Groupe T. Tran (A/E Consultants) of Canada. Client: Saudi Arabian Air lines.
Mechanical systems include HVAC systems, Plumbing systems and Fire fighting systems.
HVAC sytems: Chillers, AHUs, Computer Air conditioners and split Airconditioners.
Plumbing system: Sanitary drainage, Hot and cold water supply and Storm drainage.
Fire Protection: Wet pipe Sprinkler system and FM200.
Ministry of Interior Buildings
This project consist of different buildings. Prepared HVAC calculations for few buildings, review of shop drawings and material submittal.
Extension of Marriott hotel, Riyadh
Designing of HVAC systems for Naseem restaurant, Health club and Banquet hall.
Preparation of bill of quantities.
Children Disabled center, Medina, System includes Package air conditioners..
Alternate slaughter house, Mina, Makkah in association with Pro and Associates, New Zealand.
This slaughter house is largest sheep slaughter house in the world. It has 6 buildings. Each building is 3 storied.
System includes HVAC: split air conditioners, Desert air coolers, Exhaust fans for ventilation.
Plumbing : Process drainage, Sanitary drainage, Hot and cold water services.
Fire protections: Fire hose cabinets with the fire pumps.
Responsibilities: Prepared the design drawings of above mentioned system.
Preparation of shop drawings and supervision of Alternate Slaughter house.
Prepared the shop drawings of Process drainage, sanitary drainage, water supply, fire protection, compressed air and worked for cold storage ventilation by coordination with Pro and Associates, New Zealand.
Reviewed the drawings submittals and material submittals from various contractors and subcontractors of HVAC, Plumbing, Compressed air and fire protection system.
Accomodation building of slaughter house, Mina, Makkah
It has 2 buildings.Each building has 4 floors.
Prepared shop drawings of Sanitary drainage, Water supply, Fire protection, HVAC and also prepared drawings for site sewage,water supply and site fire water system.
Rendering Plant, Slaughter house, Makkah
Worked in association with Pro and Associates, New Zealand.Prepared shop drawings of Process drainage, sanitary drainage, water supply,HVAC,Site sewerage, Site water supply .
Reviewed the drawings submittals and material submittals from various contractors and subcontractors of HVAC, Plumbing, Compressed air and fire protection system.
Industrial and Sanitary waste water network, Royal commission, Jubail.
System includes site work of Industrial waste and sanitary waste water to be taken from various industries and thrown into the waste water treatment. Responsibilities include the designing of piping, pump stations and making of sewerage profiles.Coordination of these systems with other disciplines.
Head Quarters,(RTC), Riyadh
This building comprises of 7 floors. Task includes the preparations of HVAC calculations.
VIP Villas, Jubail. Client : Royal commission.
It has 3 main villas, 1 guest villa and 5 other small buildings.
HVAC system include package air conditioners and split air conditioners.
Responsibilities include the preparation of design criteria, HVAC calculations, drawings, Bill of quantities.
Ethiopian embassy, Riyadh
It is a 3 storied building. Responsibilities: Designing of HVAC system, Plumbing system.
Review of shop drawings.
Riyadh Technical college, Riyadh.
It has 8 to 10 buildings.Motors and Vehicles department, Electrical department, Library,
Mechanical department, Administration building, Auditorium etc.
Prepared the HVAC design of these buildings.
Buhairat City, Al-Afandi, Jeddah
It has 7 buildings. Prepared the HVAC design.
Riyadh court complex, Riyadh
It has 4 buildings of 7 storied. Prepared the Hvac Design.
Prince salman bin Abdul Aziz Research and development center, Riyadh
Prepare the HVAC design.
Riyadh central hospital., Riyadh
Worked for emergency building. Prepared the HVAC design. Prepared the bill of quantities of HVAC, Plumbing and Medical gases.
Children Disabled center, Makkah
Prepared the HVAC design.
King Abdul Aziz University, Jeddah
Worked for married housing apartment and Single student housing apartment.
Prepared the HVAC design and B.O.Q
Al Fitaihi hospital , Jeddah
Prepared the Bill of quantities and cost estimation according specifications and drawings for Plumbing, Fire protection, HVAC and Medical Gases Systems.
Intermediate School for Boys and Girls, Yanbu. Client : Royal commission, Yanbu
It is a Site adaptation project. This project is comprising of 3 buildings. Re-design HVAC system according to new site , change of orientation and climatic conditons. Modified the design according to code requirement.
Haemodialysis centre, Ministry of Health, Yambu. Client : Royal commission, Yambu
The project consist of extension of hospital to make Haemodialysis centre. It has 20 dialysis machines.
Prepared the HVAC design, Plumbing design, Fire protection system, Medical gases system and Reverse Osmosis system design for the dialysis machines.
Worked on Peace sun IX with US Airforce for Kingdom Airbase projects from Saudconsult.
Visited the sites, Prepared the design documents, cost estimation, reports of HVAC systems, Plumbing systems, Fire fighting systems, and Compressed air systems, as per the requirements of RSAF and USAF with the references of McDonnel Douglas Aerospace, standard codes and specifications of Peace sun IX. for the following facilities.
1. Logistics wing head quarters, Dhahran Airbase, 2. Weapons systems training, Al Taif Airbase
3.Three site Activation projects, Al Taif : F-15 Hangar expansion, Base supply wearhouse,
Engine repair shop (Low bay expansion )
Khamis Mushyt Airbase. It has 12 facilities(buildings).
Worked for this project in association with El-SEIF engineering. and Ballast Nedam. Client: RSAF.
Responsibilities: Preparation of HVAC design using Carrier E 20-ii program , Preparation of Plumbing design, Preparation of Compressed air system design and coordination with EL-seif engineering and Ballast Nedam group. Attended the meetings with RSAF for the discussions of comments and implementation of comments and taken approval from RSAF for the 12 facilities as follows
Aircraft washrack, Missile build up, Lantirn maintenance shop, Data processing center,
Survival equipment shop, Fire station No.1, Maintenance training control, E.O.D., Field training center
Base logistic wing, Small arms servicing building , Special purpose vehicle maintenance Facility.
Worked for Ministry of industry and electricity from Saudconsult.
Period: 2 months. Reviewed the submittals of different new proposed factories prepared from different consultants according to the rules and regulations of Ministry of industry for the systems Industrial machines layouts, Safety and Fire protections systems, Sanitary Drainage & Storm drainage, Hot and Cold water supply system and HVAC system.

E.A. JUFFALI AND BROTHERS, Al-kharj, KSA.(August 93 to Sep 94) Position: Site Engineer
Job includes site execution of HVAC systems, plumbing systems, Fire protection systems,
Modifications of shop drawings as per the consultant comments and preparation of As-built drawings.
Project: Ministry of defense and Aviation Al-Bayadh Air base, Al-Kharj.
BLUMONT ENGINEERS, INDIA
(Aug 91 to June 93) Position : HVAC engineer
Job responsibilities: Worked as HVAC engineer. Job includes designing and supervision of HVAC systems. Cooling load calculations, Duct sizing etc and also responsible for supervising the installation of package air conditioners, AHU, with supply, return and exhaust ducts

PERSONAL DETAILS:
Mobile: +974 31427463 ( Qatar ) , +91-8179354072 ( India )
Email: abdulrash68@gmail.com , abdul_mrasheed@yahoo.com