• A competent professional with over 14 + years of experience in: Erection & Fabrication Stadium / Metro Construction Industrial & Warehouse Building EPC - Power plant projects

Skill Set

construction,structural,project,autocad,steel , Fabrication,erection ,mechanical.epc

Professional Information

Total Experience : 14

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Site Engineering / Projects

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

SARAVANA GURU.G
Mobile Qatar ; 00974-55753011 ~ E-Mail : gurus2k@rediffmail.com

JOB OBJECTIVE

Seeking assignments in EPC-Structural Engineering /Project management–Power plant / Thermal / Gas Combined cycle /Industrial / Stadium Construction with an organization of repute

PROFILE SUMMARY

• A competent professional with over 14 + years of experience in:

Project Planning & Management Design & Detail Engineering Erection & Fabrication
Stadium / Metro Construction Material Management MIS Reporting & Documentation
EPC-Structural Projects Power Plant Construction PEB and Metal Sheeting

• Participate in Pre-let meeting organized by client to understand the specs, establish working relationships with various stakeholders involved in the project (QS, architect, consultant, etc).
• Review Project documents issued by the client so as to
o Prepare a Project Plan
o Compilation of specs
o Understand the Budget
• Manage Projects from conceptualization stage to execution, finalization of technical specifications, BOM, procurement, negotiation, documentation and purchase of all capital equipment, raw materials, spares & consumables.
• Working in synergy with clients and Fabrication Department to analyse the detailing & shop drawings of Steel structures for Construction.
• Working expertise in AutoCAD for steel detailing in Steel fabrication & Roof sheeting works
• Team player with strong planning, interpersonal, communication, analytical, motivation & people management skills

ORGANISATIONAL EXPERIENCE

Since Jul’18 M/s Alfasi Construction (Qatar) as Site Engineer

Role:
• Coordinate and discuss with architecture coordinator, site engineer and M&E engineer/coordinator on site technical issues pertaining to Secondary Steel structure site installation, to make sure Roof, façade and curtain wall works progress can be moved on smoothly and completed duly.
• Responsible for entire site coordination in technical matters and other matters indicated in shop drawings with relevant consultants and other trade contractor.
• Supervise and monitor site installation work progress and co-ordinate with consultants, architects and façade contractor on site installation technical issues which are not tally with shop drawings due to actual site conditions, and come up with a solution with architects and consultants to meet the requirements.
• Attend factory inspections, mock-up inspections and site inspections, and then feedback the test report to project manager, architects and consultant.
• Liaising with subcontractor and other trade subcontractor to coordinate site interface issues, such as installation sequence, protection works during installation process, so as to keep up with project master programme

Highlights:
• Executed as Site Engineer for Al Wakrah Stadium Secondary Steel Works - Roof frames, Façade Frames and Curtain wall structures Site Assembly and Erection works.

Since Sep’17-Jul’18 M/s Steel Engineering Technology (Qatar) as Project Engineer

Role:
• Coordinate with Design Department for revisions, drawing clarification and change in designs as per the site conditions.
• Raising crane request for the next day erection and submitting to the client for approval. Preparing Method statement and Risk assessment to the Client for approval.
• Coordinating with other contractors for the next day work in daily coordination meeting.
• Making rigging plan and prepare safe work methodology.
• Coordinating with survey department.
• Allocating Fit-up, Welding and finishing team according to the priority.
• Raising Stage wise inspections such as Fit-up, welding visual, NDT (UT, RT, MPT, and DPT), painting and Handing over inspections.
• Establishing the Execution Progress Reporting.
• Execution meetings (Kick-off, weekly, monthly internal and external).
• Ensuring Safe work for the workers.
• Contribution, take Ownership and Support related projects to comply with cost, time and quality
targets.

Highlights:
• Executed as Project Engineer for Qatar Metro Red Line – Erection of Elevator Structures for 5 Stations.
• Executed as Project Engineer for Qatar Metro Gold Line – Erection of Entrance Shelter Structures for 3 Stations .


Since Jan’16-Jul’17 M/s Samsung C & T Corporation (Qatar) as Senior-Structural Engineer

Role:
• The elaboration and necessary revising of the Specialized Structural steel Schedules (esp. Temp Structure).• Checking civil foundations elevation before steel (columns / frames Erection).
• Determination of Structural steel QC Inspection Process.
• Technical execution expertise for a specific subject (steel structure, welding, fabrication, cutting erection, painting of finishing works, specialized structures).
• Making rigging plan and prepare safe work methodology.
• Involved in making lifting plan and get it approved from Client on each erection activity.
• The Structural steel handover from one department to another as delegated Work Scope (Work Units).
• Checking of compliance of cutting, fabrication, welding, painting, erection with scope and quality requirements.
• Establishing the Execution Progress Reporting.
• Execution meetings (Kick-off, weekly, monthly internal and external).
• Continuously checking and preparing the BoQ for the steel structural work.
• Specific Functional/Technical authority (besides DoA):
• Participation in structural steel Construction with Ownership related to Quality and Time
• Contribution, take Ownership and Support related projects to comply with cost, time and quality
targets.

Highlights:
• Executed as Total Structural In charge for Gas Turbine Generator Building Phase -1 & 2 of Um Al Houl Power Project 2,550MW combined cycle power plant – Qatar.


Since Feb’15-Jan’16 M/s ABIR Infrastructure private limited (Andhra Pradesh - India) as Manager-Structural

Role:
• Reviewing Steel Erection drawings.
• Checking civil foundations elevation before steel (columns / frames Erection).
• Supervising ground assembly for main columns with beams to compose frames can be lifted and erected one time.
• Supervising erection of main steel girders and bracings between frames (with consideration of erection sequence).
• Supervising alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection.
• Supervising erection of Dressing (erection of small beams, bracings, angles, C-Channels and other medium & light steel items).
• Supervising balance bolt tightening and offering for final inspection.
• Supervising Erection steel handrails and gratings.
• Through all previous steel erection steps, solution for many technical problems in erection due to material defects or wrong design to be set by my or client proposals through RFIs (Request for Information).

Highlights:
• Executed as Total Structural In charge for Power house Building (Gas Turbine Generator Building), Bunker building and Coal Handling Plant of. Bhavanapadu Thermal Power Plant 2 x 660MW, Andhra Pradesh, India.


Since Jan’11- Dec’14 M/s Star Plus Global Limited, Hong Kong (China) as Deputy Manager

Role:
• Submit the required documents to the customer/client such as Project Plan, Quality Plan, Inspection Test Plan, Method statements, Risk analysis, material movement plan, material schedule, drawing schedule, and labour histogram.
• Conduct a site visit, understand the contract drawings, co-ordinate with consultants along with our designers for approvals.
• Preparing and solving technical & field queries related to steel structure detailing, fabrication and erection.
• Project Plan implementation – Deploy project as per plan. Monitoring deployment progress and sharing the same with all team members, internal stakeholders and customers.
• Submission of updated Project Plan, Health & Safety Plan, and fortnightly look ahead planning.
• Submission of BOQ and weekly & monthly progress reports with review meeting with Clients and contractors
• Heading a team of Project engineers in the organization
• Interacting with Factory & clients for scheduled fabrication & erection with regular meetings
• Coordinating with Consultant, Vendors, Factory, Design and Inspection Department
• Providing necessary information & support to facilitate Invoicing & Collection.

Highlights:
• Successfully executed projects such as Bhavanapadu Thermal Power Plant 2 x 660MW, Andhra Pradesh, India (Project Value 24000 MT) from M/s Honglu Steel Construction Group Ltd– Hefei, China and Singhitarai Thermal Power Plant 2 x 600 MW, Chhattisgarh, India (Project Value 18000 MT) from Laigang Jinan Steel Structure Ltd- Jinan, China
• Performed Heavy Steel Structure detailing , planning & fabrication works from China Factory and site Erection coordination works in India
• Worked with Heavy Steel structures mostly with build-up sections and also Rolled sections
Total Project value of nearly 50,000MT approx. handled in 2 projects at the same time.


Feb’09-Dec’10 M/s Metecno India Private Limited, Chennai – India as Engineer-Technical Services (Projects)
Role:
• Preparation and implementation of work execution plan as relevant to the construction activities.
• Directing and coordinating construction work within company policies and procedures.
• Monitor quality, quantity and security of work, performance of direct labor and subcontractors
• Preparing and solving technical & field queries related to Steel structure detailing, fabrication and erection by organising Erection procedure and sequence of materials for easy erection.
• Creating BOQ and weekly & monthly progress reports with review meeting with Clients and contractors

Highlights:
• Successfully executed projects like Ashok Leyland (Rudrapur) and Vedanta Aluminium Limited (Jharsuguda) for roofing & cladding of Puff Panel
• Performed detailing & fabrication of Light Gauge & Pre-engineering Buildings (PEB) & Heavy Steel Structure for Industrial purposes
• Prepared & analysed all type of Roofing & Cladding Sheets like G-4, G-5, G-6, Clip Lok , Hi-Rib Profiles and Polycarbonate sheet as well as Puff panels and Double skin sheets like Rock wool .

PREVIOUS EXPERIENCE

Jun’07-Jan’09 M/s A.E. Automotion (M) SDN., BHD., Chennai – India as Design Engineer-Projects .

Role:
• Involved in Detailing of Heavy & Light Gauge Steel Structure for Coal Handling Structures (CHP) such as Gallery, Gantry, Trestle, Tower, Platform and Stair Case

Highlight:
Executed projects on Detailing in India and Site Coordination (Fabrication) in Wahanna Mines (Malaysia), Albany Wood Chip Handling (Australia) and Kuttai Coal Handling (Indonesia)


Dec’05-May’07 M/s G.K. Roofings India Pvt. Ltd., Chennai – India as Design Engineer-Projects.

Highlight:
• Successfully executed projects such as A.K. Associates Pvt. Ltd. (Chennai), Selvi Spinning Mill (Chennai), GMR Sugar Division (Vizag, Andhra Pradesh) and other projects

Aug’04-Dec’05 M/s Indian Commerce & Industries Co. Pvt. Ltd., Chennai - India as Site Engineer.

Highlight:
• Involved in fabrication work of project such as Tube Products of India (Murugappa Groups, Chennai)

CERTIFICATION

• Certified - Appointed Person – Lifting Operations by Enertech – Qatar.
• Certified in AutoCAD,
• Certification Course on Tekla X-Steel at William Hare Chennai
• Professional in Project planning and Management (PPM) using Primavera at CAD Centre Chennai.
• Certified Work at Height .

TECHNICAL SKILLS

• Proficient in Lifting Operations, Erection works, Project management , AutoCAD, Tekla X-Steel, Primavera, Microsoft Office, Adobe Photoshop and Internet Applications

EDUCATION

2004 B.E. (Mechanical) from Sethu Institute of Technology, Madurai with 64%
2001 Diploma in Mechanical Engineering from P.A.C.R. Polytechnic, Rajapalayam with 69.1%

PERSONAL DETAILS

Date of Birth: 2nd February 1982
Address: Doha , Qatar .
Languages Known: English, Hindi, Tamil and Telugu.