Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Thet Htun

Candidate ID: 424428

Career Summary

Diploma with 5 years experience in 2d detailing and 3d modelling up to production stage in the field of Façade industry

Skill Set

Drafting and 3D visualizer

Professional Information

Total Experience : 7

Nationality : Myanmar

Qualification Level : Diploma

Job Function : Engineering

Work Location Preference : UAE

Detailed Profile

CURRICULUM VITAE


Name
THET HTUN
Email address: t.htun1910@gmail.com
Contact No: 971-0521379003

Personal Information
Date of Birth : 19-10-1979
Nationality : Myanmar
Religious : Buddhist
Marital Status : Married
Gender : Male
Residency Expiry date: 15/04/2021
Visa Status : Employment visa
Passport No : MA 832576
Issue dated : 14th Jan 2011
Expiry Date : 13rd Jan 2022

Education:
Diploma in GTI (Mechanical Power) (From 01/12/1998 to 01/11/2000)
Government Technical Institute, Hinthada, Myanmar

Other qualifications
AutoCAD 2D, 3D modeling, Inventor, Catia V5 and Microsoft office
UAE Automatic driving license

Hobbies
Reading newspaper and playing guitar

Language
English, Myanmar

Notice period
1 Month

Reason for Leaving
• To gain a better career prospects, professional growth and work opportunities (a long-term career)










Working experience

12th March 2017-Present
Affan innovative Structure LLC
Dubai Investment Park 2,UAE
Senior Designer
• Design and develop concept and shop drawings in line with Architect drawings and project specification and requirement.
• Prepare Materials submittal.
• Develop 3d Model in Catia and Prepare 2d Detail drawings in AutoCAD for Concept design and Shop drawings.
• Prepared the superimposed model with as built site survey and Panels assembly’s in design models for checking any clashing and any discrepancies.
• Prepare and Release Fabrication drawings and site installation drawings
• Prepare As-built drawings.

Key project involved in
1. Carbon Fibre Composite glass door and Aluminium Cladding panels, Rolex internal Shop Front, Dubai Mall, Dubai
2. Carbon Fibre Fins with SS cladding, Armani, Dubai Mall, Dubai
3. Aluminium and Steel Framing for Reception’s Media Screen, Damac by paramount, Dubai
4. Stainless steel cladding, Museum of the Future, Dubai

18th October 2015 To 09-March-2017
Cladtech International LLC
Ras Al Khaimah,UAE
Senior Designer
• Prepared and developed complex parts of the building in 3D based on shop drawing and project’s specification.
• Finalized 3d Wire mesh and modelling the complex parts of a building of project up to production stage.
• Revised and Updated Shop drawings for resubmission.
• Prepared BOM AND MTO.
• Prepared the superimposed model with as built site survey and Panels assembly’s in design models for checking any clashing and any discrepancies.
• Prepared and Released Fabrication drawings and site installation drawings.

Key project involved in
1. Aluminum Composite panels, KKIA Terminal5, Riyadh, Saudi Arabia
2. Skylight Aluminum Flashing panels and Sub Steel Frame, Al Fattan Crystal Tower, Dubai, UAE
3. Aluminum Composite panels and steel frame, Stick and United Curtain wall panels’and Roof Crown Aluminum Composite Cladding panels and Sub frame, Damac Tower, Dubai, UAE
4. Stick Curtain wall panels and Aluminum Flashing panels, Glass Balustrade panel’s brackets and Glass Panels, MARINA GATE 1, DUBAI




8th Nov 2011 To 14th-Oct-2015
Permasteelisa Gartner Middle East L.L.C
Dubai, UAE
Designer
• Prepared and developed complex parts of the building in 3D based on shop drawing and project’s specification.
• Finalized 3d Wire mesh and modelling the complex parts of projects up to production stage.
• Prepared Fabrication drawings and site installation drawings.
• Prepared BOM AND MTO.
• Prepared the superimposed model with as built site survey and Panels assemblys in design models for checking any clashing and any discrepancies.
• Prepared and Released Fabrication drawings and site installation drawings.

Key project involved in
1. United Curtain wall panels and GRP panels, KAFD parcel1.15-Riyadh Saudi Arabia
2. United Curtain wall panels and Aluminum Cladding panel, KAFD A01 conference Center-Riyadh Saudi Arabia
3. Stick and United Curtain wall panel and Aluminum Cladding panels, Tadawul Tower Riyadh-Saudi Arabia
4. United Curtain Wall panels, Sheikh Zayed National Museum Mockup-Abu Dhabi UAE

23rd June 2009 To 31st Jan 2011
PBG Metal Works.,
Singapore
Draftsman
• Prepare Shop drawings and Details for Alum window and door, Curtain Walls Structural
and glazing, Aluminium Composite Cladding, Aluminium screen and trellis and canopy.
• Suggest design solution according to architects conceptual details and requirements.
• Inquire cost, quality of material from supplier and liaise with material suppliers
• Revise Shop Drawings, Details, Elevations, and Floor Plans as per comment of the architect.
• Estimate and prepare Quotations compared to Bill of Quantity and tender drawing.

20th March 2008 To 30th April 2009
Kl Marine Service Centre. Yangon, Myanmar
Projector coordinator
• Check and take on-site measurement of ship’s equipment’s needed to replace or repair on board
• Cost estimate and place orders of equipment and piping materials.
• Monitor and Supervise workmanship and installation of machinery, equipment’s and piping system.
• Prepare P&ID, piping detailed drawing, other machinery and equipment’s layouts and arrangements, isometrics fabrication detailed drawing and material take-off on CAD.


Applicant