Wael Ismail

Candidate ID: 73756

Career Summary

Project Manager MEP with 18 years leading teams of general contractors and laborers on large scale Residential (High rise Bldg.’s, Medium Rise Bldg.’s, Hotels), Power Stations, Pumping Stations, Industrial Projects, Airports and Infrastructure Projects and commercial construction projects

Skill Set

Project scheduling, PMP Study, Project Breakdown / Budget for MEP activities, Protection of MV SWG, Construction Management, Maintenance of MV SWG, Building systems-services, High Rise Buildings, Strong interpersonal skills, Power Stations, Commercial construction, Industrial Projects.

Professional Information

Total Experience : 18

Nationality : Egypt

Qualification Level : Engineering Graduates/PG

Job Function : Site Engineering / Projects

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile


MEP Manager
08/2016 till now
Saudi Arabian BAYTUR – Tabuk.
Review the design and send all the required RFI’s.
Review plans and specs.
Review the material submittals against the specs / compliance statements.
Follow & review issuing the shop drawings according to the specs and codes.
Issue the coordination drawings for Buildings/utility services.
Co-ordination meeting with CDM/AECOM.
Conduct preparatory meeting before starting any new activities.
Review MEP Budget.
Review the MEP Breakdown.
Doing the required value engineering of the project.
Doing Coordination with all sections.
Issue the required requests for the materials according to the approved submittals.
Doing random site checkup for man power, productivity and work progress against the construction schedule.
Conducted weekly meetings (with my staff), which facilitated stronger communication and the ability to resolve
critical issues also, to keep them updated about our target / progress.
Prepare the MEP invoices with Cost control section.
Follow the schedule and give updates to the planning section.
Follow up the execution of the As Built Drawings by instructing the site people to keep feeding the technical staff with
the changes that shall exist on the site work execution against the shop drawings. Also to keep following the technical
staff to produce these drawings.
Follow (with procurement section) the material availability at site on time according to schedule and site conditions.

Project Manager MEP

09/2014 - 7/2016
Saudi Oger – Riyadh
Responsible for the following Projects:-
1- SANG Project (6000 Villas). 2- ARQA CLINC (Rush Project - for the Client No. 1). 3- PFB Palace (Rush Project - Riyadh Prince Palace)
Reviewed plans and specs during the schematic design of pre-construction.
Determined the project schedule, which included the sequence of all construction activities.
Coordinated utility service provider according to project schedules.
Reviewed plans and specs during the schematic design of pre-construction.
Conducted weekly production and operations contractor meetings, which facilitated stronger communication & the ability to resolve critical issues.
Obtained building and specialty permits from local jurisdictional agencies.
Performed regular job site observations to provide direction for all general contractor personnel.
Conducted all critical pre-installation conferences with general contractors, subcontractors, consultants and
Manufacturer’s representatives.
Worked with construction administration consultants to plan field observations on schedule.
Digitally archived weekly progress and technical “Knowledge Base” photographs of all assigned projects.
Prepared and followed through on all required punch lists.
Oversaw the entire building turnover process, while enhancing communication between all construction
management.
Prepared regular interval progress reports.
Prepared the materials Takeoff and the Materials orders.
Avoided construction delays by efficiently following through with all site inspections in a timely manner.
Scheduled all contractors and materials deliveries.
Project Manager - MEP
08/2013 to 06/2014
Al-Arrab Contracting Company – Riyadh.
Responsible for KAP-4 (8- Sites).
Reviewed plans and specs during the schematic design of pre-construction.
Determined the project schedule, which included the sequence of all construction activities.
Review the material submittals against the specs / compliance statements.
Attended the Co-ordination meeting with consultant/Client.
Conducted weekly meetings (with my staff), which facilitated stronger communication and the ability to resolve
critical issues also, to keep them updated about our target / progress.
Prepared regular interval progress reports.
? Review MEP Budget.
? Review the MEP Breakdown.
? Doing the required value engineering of the project.
? Doing Coordination with all sections.
? Issue the required requests for the materials according to the approved submittals.
? Doing random site checkup for man power, productivity and work progress against the construction schedule.
?
Review the prepared the materials Takeoff before issuing the Materials orders.

Saudi Bin Laden Group (SBG)
07/2006 to 06/2013
A)Project Manager - MEP
06/2011 to 06/2013
Saudi Bin Laden Group – Riyadh King Abdallah Finance District (KAFD).
Responsible for Parcel 5.05(two towers 37th floors).
Review the design and send all the required RFI’s.
Review plans and specs.
Review the material submittals against the specs / compliance statements.
Follow & review issuing the shop drawings according to the specs and codes.
Issue the coordination drawings for buildings/utility services.
Co-ordination meeting with Dar AL- Riyadh.
Conduct preparatory meeting before starting any new activities.
Review MEP Budget.
Review the MEP Breakdown.
Doing the required value engineering of the project.
Doing Coordination with all sections.
Issue the required requests for the materials according to the approved submittals.
Doing random site checkup for man power, productivity and work progress against the construction schedule.
Conducted weekly meetings (with my staff), which facilitated stronger communication and the ability to resolve
critical issues also, to keep them updated about our target / progress.
Prepare the MEP invoices with Cost control section and review with the consultant for approval.
Follow the schedule and give updates to the planning section.
Follow up the execution of the As Built Drawings by instructing the site people to keep feeding the technical staff with
the changes that shall exist on the site work execution against the shop drawings. Also to keep following the technical
staff to produce these drawings.
? Follow (with procurement section) the material availability at site on time according to schedule and site conditions.


B) Electrical Manager / MEP Coordinator
05/2008 to 05/2011

Saudi Bin Laden Group – Tabuk
? Review the design and send all the required RFI’s.
? Review plans and specs.
? Review the material submittals against the specs / compliance statements.
? Issue the required requests for the materials according to the approved submittals.
? Follow & review issuing the shop drawings according to the specs and codes.
? Co-ordination meeting with Khatib & Almy.
? Prepared the Invoices and reviewed / Approved from the consultant.
? Follow site man power, productivity and work progress against the construction schedule.
? Conduct the Special systems like Guidance system – BHS – concourse – Main counter – passports counters.
? Conduct all site work for electrical work at the Following Bldgs. Main Terminal, Royal Pavilion, Power House
(Generators – MV SWG – CCMS - BMS), Chiller Plant, Administration – Masjid – Police Cantonment – Water
Supply, Cargo & Mail – Fire & Rescue – METEO - Upper air station- Air ways Engineering, External Work
(Substations–MV&LV Cables –Street Lighting – duct banks Tele. System – Data).
? Testing & commissioning for MV SWG – LV Panel Boards – MCC – AHU – etc.
C) Electrical Section Head
07/2006 to 04/2008

Saudi Bin Laden Group – Yemen / IBB (
IBB Tourist Resort – Owner Representative) 
? Review all Design Drawing and make all required modification.
? Review / Approve all the Shop Drawing.
? Material approval.
? Review/ Follow the specification for Material and shop drawings Approval.
? (Value Engineering) Redistribute the load and Decrease the no. of Generators according to the Load.
? Review/Approve LV Panels feeding Hotel – 26 Villa – 4 VIP Villa- Helipad – Mosque – Multipurpose Hall –
Recreation Club - the services BLDG – power house BLDG.
? Review (MV & LV & control) Cables Paths and make the required modification.
? Grounding system.
? Review power system - Lighting system – MATV – structure (data-telephone) systems – Fire Alarm system – Public
Address system.
? Review BMS and add the necessary signals.
? Review the Invoices.
? Doing random site checkup for man power, productivity and work progress against the construction schedule.
? Doing random site checkup for Site Execution Procedure and give SON if any.
D) Electrical Manager
07/2005 to 06/2006

Al-Assad Rolling Mill – Sudan
? Start Up The Factory.
? Review all the Shop Drawing and Material submittals approvals status with the Consultant.
? Co-ordination/progress meeting with consultant.
? Co-ordination with mechanical section for all the requirements.
? Study the site issues and problems and then submit proposed solutions to consultant for approval Make Material
supply request for all Material.
? Issue the required requests for the materials according to the approved submittals.
? Installation and connection of all the electrical equipment’s at the production line and all control devices proximity
switch, limit switches connection for the solenoid valves.
? Installation of two control room (main) pulpit and secondary one complete with work stations.
? Installation of MV SWG and make testing and commissioning.
? Primary and secondary injection for the MV SWG.
? Protection relay setting.
? Installation of (5) generators.
? Installation of (4) step down transformers & (2) step up transformer.
? Installation of LV Panels (power center-MCC).
? Installation of (A-C & D-C) Drives for the motors.
? MV & control Cables (Pulling & Connections) and make continuity & megger tests for the cables.
? Fill the Batteries with its solution and charge it.
? Installation of Cable tray – Conduit.



Kahromika Company – Cairo 08/2000 to 07/2005
A) Site Engineer - NUBARIA Power Station [2 × 750 MW] Combined Cycle. 02/2004 to 07/2005
? Conducted Installation of (6) Main transformer.
? Conducted Installation of (4) Aux. Transformer.
? Conducted Pulling & Connections MV, LV, control Cables.
? Conducted continuity & megger tests for the cables.
? Conducted the Grounding of the TR. & all equipment in the station.
? Conducted Installation of MV SWG & Load center and MCC Panels.
? Conducted Installation of Instruments.
? Conducted Installation of the Batteries Racks and DCS rooms.
? Conducted the H.V Test for M.V Cables.
? Conducted the Primary and secondary injection for the SWG.
? Conducted Installation of the lighting system – Fire Alarm system.
? Conducted Installation of Cable trays – Conduits.
B) Site Engineer – Canal Company. 12/2002 to 01/2004
? Install new MV SWG.
? Replace the existing oil SWG by SF6 MVSWG / or Vacuum SWG.
? Protection for Medium voltage SWG.
? Test and connect the protection devices (Sepam-Spage-Mic-Mif-ABB).
? Batteries erection and maintenance & Operating DCS.
? Maintenance and test the circuit breakers.
? Test and maintenance the transformers.
? Test C.T &V.T & Protection devices.
? Pulling the power cables and Test these cables.
C) Site Engineer – Mubarak Pumping Station. 08/2000 to 12/2002
? Conduct the installation of the Lighting system.
? Conduct the installation of the Fire Alarm system.
? Conduct the installation of the control room of the station.
? Conduct the installation of (24) units of synchronous motor (12 MW each).
? Conduct the installation of the control devices of (24 units) of motor.
? Conduct the installation of cable trays.
? Conduct the installation of (24) units of distribution panel the motor & local control panel for every unit.
? Conduct Pulling & connection of the M.V / L.V & Control cables.
? Conduct the continuity test for all the control cable.
? We didn't have Q.A so all Inspection Reports assigned to me and I conduct all the required inspections reports with
Procedures as per the consultant requirements.
International Arabian Company – Sharm Al- sheikh 06/1999 to 10/1999
Trainer
? Trained to read the Shop Drawings.
? Trained to conduct the Voltage Drop and Short circuits calculations.
? Trained for Takeoff the Material.
? Conduct the installation of the Lighting system in a resort.
? Conduct the cable pulling.
? Follow 20 Villa Subcontractors.
International Arabian Company – Sharm Al-sheikh 06/1998 to 10/1998
Trainer
? Trained to read the Shop Drawings.
? Trained to conduct the Voltage Drop and Short circuits calculations.
? Trained for Takeoff the Material.
? Conduct the installation of the Lighting system in a resort.
? Conduct the cable pulling.
? Follow 20 Villa Subcontractors.
International Arabian Company – Sharm Al- sheikh 06/1997 to 10/1997
Trainer
? Trained to read the Shop Drawings.
? Trained to conduct the Voltage Drop and Short circuits calculations.
? Trained for Takeoff the Material.
? Conduct the installation of the Lighting system in a resort.
? Conduct the cable pulling.
? Follow 20 Villa Subcontractors.
Education
Bachelor of Science: Electrical Engineering 2000
ZAGAZIG University – Egypt
? Coursework in Electrical Power and Machine Department.
? Grade: - Very Good.