Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

ANISH SHANKARA

Candidate ID: 1770577

Career Summary

Engineering Graduates/PG with 24 years in Oil & Gas - Upstream & Downstream Petrochemical Complexes, Refineries, Pipelines, Marine, Power and Large Civil Industrial Projects in EPC, PMC, PMC & Consultant roles.

Skill Set

BEDD, FEED, Detail Engineering, Procurement, Construction, Pre-Commissioning, Commissioning & Start-UP, Planning Scheduling, RISK Engineering, ORACLE Primavera Ver 5.2, EPC, FEED

Professional Information

Total Experience : 24

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Oil / Gas / Petroleum

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

EXECUTIVE SUMMARY

Professional experience: 25 Years as Lead/Senior Engineer in the field of Commissioning Planning, Scheduling & Risk Engineering. An expert in Project /Program Management, on which skills and expertise have been earned from execution of Projects from Concept Phase to PRE-FEED, FEED, Engineering, Procurement, Construction, Pre-Commissioning, Commissioning & Start-Up of Oil & Gas Upstream, Midstream & Downstream Projects. Petrochemicals, Refineries, LNG Plants, Marine Facilities, Power, Aluminum Smelter, Pipe Lines, Interface & Other Large Civil Projects in PMT, PMC, Consultant & EPC roles in Multi Disciplines.

25 + years in Middle East Projects in Lead/Senior roles with 9 Years in YOKOHAMA - Japan.

From May 2017 to Present with KNPC, Kuwait National Petroleum Company as Planning Specialist for MAA Facility - Mina Abdulla Refinery – KUWAIT in charge of all Process Plants, Utility Units and Interface.

Employer History: KNPC / SHELL / GASCO / SATORP/ SAFER / TOTAL / SAUDI ARAMCO / DUBAL / SUMITOMO / JGC Yokohama / CHIYODA Corporation, Yokohama / TOYO Engineering, japan / Petrofac / KENTZ.

Technical knowledge: Project Planning / Program Management / Pre-Commissioning Commissioning & Start-Up / Risk Engineering. – Specialized in Quantitative Modelling

Interpersonal skills: Team Player, Positive Attitude, Self Confident, Logical/Critical Thinking & Problem Solving, Strong Work Ethics & Judgment capability, Time management skills.


EDUCATION AND TRAINING

EDUCATION:

• (2009) BE - Bachelor Degree in Civil Engineering
Vinayaka Missions University Tamiland, India

• (1992) DCA - Diploma in Civil Engineering
State Board of Technical Education - Kerala, India

• (2016) MBA – Project Management (Ongoing)
Bharathiyar University, India

TRAINING:

• 2017 - ORACLE Primavera P6 - Ver 15.2.0
KNPC – Mina Ahamadi Refinary – KUWAIT.

• 2015 - ORACLE Primavera P6 - Ver 8.3.4
GASCO – ADNOC – Abudhabi – U.A.E.

• 2012 - ORACLE Primavera P6 - Ver 8.2 / ORACLE Primavera RISK Analysis / Easy Risk /@Risk
SHELL, Bangalore – India

• 2005 - Pertmaster - Advanced Training / Cristal Ball - Advanced Training / RISK - Advanced Training
Toyo Engineering –Japan

• 2004 - Primavera Montecarlo – QSRA Advanced Modelling Advance Training
JGC Yokohama –Japan

• 2001 - Quantitative/Qualitative RISK Analysis / Artemis SP, Open Plan, Project Scheduler
CHIYODA Corporation Yokohama – Japan

• 1993 - Primavera - DOS Ver.3 / 1996 – Primavera Project Planner
Saudi ARAMCO, Dhahran - Kingdom of Saudi Arabia
• 1993 - Project Scheduling (Critical Path Scheduling, Critical Chain Scheduling by Arrow diagramming and Precedence diagramming, Gantt Chart Development)
SAUDI ARAMCO, Dhahran - Kingdom of Saudi Arabia

EXPERIENCE SUMMARY

PRE-COMMISSIONING / COMMISSIONING & START-UP.

• Case Studies for Utility and Process Unit Sequencing on different Scenarios for Brown Field and Green Field.
• Development of CSU Unit/Area wise Schedule Program LEVEL- I/II in ORACLE Primavera Ver 15.2 Top Management.
• Development of CSU Detail System/Sub-system level Integrated Level –III Schedule program in ORACLE Primavera
• Interface Studies Unit level and System Level – OSBL and ISBL on different Scenarios.
• Development of Detail Level System wise Interface Schedule Program for Process / Utility Units in ORACLE Primavera.
• Detail Case Studies on different Process & Utility Scenarios: What-if Scenarios for Incorporating in Detail Schedule.
• Verification of EPC’s UNIT/System Level Flow diagram and Sequence Block Diagrams for Utility and Process Units
• Detail Case Studies on FEED Stock Requirement & Availability from Interface Process Units (Brown Field & Green Field)
• Review, Verify CSU Sequence Block Diagrams, Flow Diagrams & Streams (System/Sub-System) -Utility & Process Unit
• Evaluate EPC Pre-Commissioning Commissioning & Start-Up Schedules & corrective actions.
• Aligning Construction Level-IV Construction Schedule w.r.t to Pre-Comm, Commissioning & Start-Up Sequence.
• Aligning Commissioning & Start-Up Sequence w.r.t Operational Planning Sequence and Product Delivery Schedules.
• Process Units Schedule Delay Analysis, Findings on Occurrence of Delays, Mitigations and Recovery.
• Add-on Values to Pre-Comm, Commissioning & Start-Up RISK Workshops for RISK Register and Follow-Up.
• Pre-Comm, Commissioning & Start-Up Manning’s requirement – Loaded on Oracle Primavera – Histograms.
• Pre-Comm, Commissioning & Start-Up Progress Reports / Participate in Commissioning & Start-Up meetings.
• Development of Quantitative Risk Models QSRA for P-10 P-50 P-90 (As on requirements)
RISK ENGINEERING
• Develop, Establish and Implement and Review PRM – PROJECT RISK Management Procedures.
• Identify Key PROJECT RISK Elements TECOP< Technical- Time & Cost/Economic/Commercial/Organizational/Political>
• Identify Evaluate Project KRI - Key RISK indicators for Qualitative and Quantitative RISK Assessments.
• Develop, Establish PROJECT RISK Scoring System for Quantitative RISK Assessment: RAM.
• Participating, add -on values to Qualitative & Quantitative RISK Workshops.
• Developing, Establishing & Implementing PRR: PROJECT RISK Register.
• PROJECT RISK Register: Quantifying Tracking, Monitoring, Mapping, Populating, Ownerships.
• Develop and Follow-up of PROJECT Risk Mitigation Actions on different Projects.
• Developing Tracking and Monitoring Project Residue Risks and Project Discrete Risks.
• Develop Cost and Schedule RISK Models for CSRA Quantitative RISK Assessments. - Montecarlo Simulation
• Cost and Schedule RISK Analysis for P10-P50-P90 Values - Project Contingency Evaluation.
• Develop, Establish & Analyze Schedule RISK CAT Models.
• Assessments and Evaluation of EPC Schedules & Cost Estimate Robustness - Quantitative RISK Analysis.
• Develop and Integrate Cost and Schedule RISK Models.
PROJECT PLANNING & SCHEDULE CONTROL.
• Contract evaluation and Implementation – Planning and Schedule Control
• Develop, Establish & Implement Planning and Scheduling Procedures.
• Develop, Establish and Implement Project WBS (Functional & Project Controls).
• Develop, Establish Critical Path Studies /Critical Path Schedules/Gantt Chart/ Network Schedules /Liner Scheduling.
• Develop, Establish and Analyze Critical Path/Sub-Critical Paths/Heavy Lifting Paths.
• Develop, Level-I/II/III/IV EPC Baseline Schedules Loaded with Resources /Update Working Schedules & Forecasts.
• Develop and Implement FEED Base Schedules / Progress Monitoring – Deliverables / Update.
• Develop and Integrate Master Schedule programs for different process and utility packages.
• Develop, Establish Micro Level Schedule program for Critical Path to Arrest Slippages/Look ahead Schedules.
• Participating and add-on Values to Constructability and Work Sequencing /Schedule Workshops.
• Earned Value Analysis /Trend Analysis/Delay Analysis.
• Progress S-Curves/Physical Progress Measurement, Calculations / Invoicing.
• Develop Project Cash-flow Curves
• Monthly/Weekly Reports/Participating Monthly & Weekly Meetings & Daily Meetings.
PROFESSIONAL EXPERIENCE
COMMISSIONING PLANNING SPECIALIST
May 2017 – May 2020
KNPC, Kuwait National Petroleum Company – Mena Ahmadi Refinery Project – Kuwait.

Plant Details : Sulfar Block / C5 C6 ISOM / LPG / DCU NHT / Delayed COKER / Deisopentanizer / ARDS / Diesel HTU / Deisobutanizer /
IC5 Merox / Hydrogen /HSR / SWT / Vacuum Return / FCC Naptha / FCC-NHT SWT. & Utility Plants

Roles and Responsibility: In charge of all 39 Units commissioning & Start-UP Planning and Scheduling, Develop Commissioning and Start-Up Breakdown Down Structure – CBS by Cluster and Unit wise. Unit wise and System level Critical Path Studies. Development and Update of Process and Utility Unit Summary Level and Area Summary Level Schedule Programs in Oracle Primavera Ver.15.2 and Issued to KNPC Top Management / Develop and Update Detail System, Sub-System wise Interface Integrated CSU Schedule Programs in Oracle Primavera Ver 15.2 for all Utility and Process area to KNPC CSU team for detail execution and schedule control. Develop and Update Detail System wise Schedule program for Interface and Tankage Area in Oracle Primavera Ver 15.2. Review detail system level process and Utility Block diagrams. Progress Measurement & Progress “S”-Curve for each Unit, Daily Progress Measurement Sheets – DPR, Delay Analysis for Delayed Units Findings for Occurrence of Delay, Effect of Delay and Mitigation, RCA Analysis, Development of Manning’s Schedule Loaded with Man-Hours in Oracle Primavera Ver.15.2. Comparison of Manning’s Schedule with OBS, FEED Requirement studies What-If Case Studies, Add on values to Risk Workshop and update Register, Weekly and Monthly Meeting with KNPC Team Leads.

LEAD PLANNING SCHEDULE CONTROL & RISK ENGINEER
Jan 2015 – 30 Aug 2016
EXCELERATE ENERGY – GASCO LNG TERMINAL PROJECT – ABUDHABI – U.A.E (On shore and offshore portion
including Jetty, Mooring Dolphins, Access Trestle, Cat walks, Gangways, Berthing Dolphin, Offshore Civil, Piping, Pipeline, Mechanical, Electrical, Instrumentation, Pre-commissioning, Commissioning Scope)

Roles and Responsibility : Develop Project Planning Schedule Control Procedure, Project WBS(Functional and Project Controls), OBS Establish Project Baseline Schedules in line with EPC Contractual Milestones and Schedule Benchmarking. Develop Level-I/II/III/IV Schedules and update Weekly and Monthly wise. Notify Project Manager, Project Control Manager on Potential Delays, Threats, Risks and Issues for Recovery and arrest slippages. Critical Path and Sub-Critical Path Analysis, Delay Analysis, Findings and Observations on Delay Occurrence and recommend solutions. Close Monitoring of Engineering Technical Document Register on IFA, IFIR and IFC dates. Schedule Performance Index’s, Co-ordinate with Engineering discipline leads to arrest schedule slippages on discipline interface data and key vendor information for design calculations. Coordinating with Procurement Leads and verify interface data from engineering team provided accurate information to vendor to arrest slippage during equipment fabrication stage. Monitoring and Tracking vendor shop fabrication progress and shop visits. Chairing Critical Equipment’s Kick-off Meetings, Monthly and Weekly meeting on critical and Long Lead Equipment’s Fabrication status. Chairing Constructability workshops and add-on values on Constructability Reviews on Construction Work Sequencing and related schedule logics, Heavy Lifting and Inland Transportation. Align Level-IV IFC Drawing schedule in line with Construction Required Date. What-if Analysis and case studies; Craft and Productivity Analysis; Routine construction site visit for Physical progress checks, certifying for Invoices. Monitoring, Tracking and recording scope change and related delays. Support Contractor on Planning and Scheduling Issues whenever required; Development of Pre-commissioning, Commissioning and Start-up Logics and Detail Schedule program by Sub-System and System wise and update. Development of Micro Schedule Program and update for key potential schedule risk areas.
Develop Procedure for RISK Management < Quantitative and Qualitative >, Develop and Implement Project RISK Breakdown Structure; Identify Key Project Threats, Risks and Issues; Develop and Implement RAM, Risk Assessment Matrix, Identify Occurrence of RISK Triggering Point and develop RISK mitigation strategies and populate among the team members for responsibilities, actions and arrest the schedule and cost overruns; Development of RISK Register, Follow-up, Tracking and Update; Charring and add on values to Quantitative and Qualitative RISK Workshops; Schedule Critical Path Studies ; Development and establish Critical Path and Sub-Critical Paths; Contractor Schedule Program Robustness checks and corrective actions; Schedule RISK Analysis on Project Baseline schedule and Work schedule for P-10-P50-P90.


SENIOR PLANNING ENGINEER
2013 OCT – 2014 NOV
PETROFAC – AlKHOBAR, SAUDI ARABIA.- PETRO Rabigh - II
Roles and Responsibility: Maintaining and updating Engineering Document Register – PETROCEPT, Identify critical delays and overdue and notify engineering discipline leads for recovery; Interface with discipline leads and vendor representative for key design data inputs; Coordinate with Petrofac
– India design center for timely progress ; Coordinate and Follow-up 3D Model close-outs(Clashes/Observations/Findings); Notify Engineering Manager/Project Manager on Critical Delays on Key Engineering Areas; Participate in Engineering Meetings; Align Engineering deliverables in line with Construction CRD/ROS dates; Discipline wise progress calculation, S-Curve and Manpower Histogram; Level- I/II/III Schedule Development and Update on EPC Phase.(Baseline/Working Schedule) ; Guide Sub-Contractor Level-IV Development and Implementation; Add-on values in Constructability Workshops and RISK Workshops; Develop Risk Register, update and maintenance; and Implementation; Coordinate with Procurement team and make sure all events are on schedule ; Cross check vendor weekly report for FOB dates and ETA dates. Chair Procurement weekly meeting.


RISK ANALYST (ASIA PACEFIC & MIDDLE EAST )
Apr 2012 - Sep 2013
Shell: Shell, Bangalore
Iraq Majnoon FCP Gas Plant, Calgary Based Projects, Leo/Silver, ECC Debottlenecking (Singapore) – Pre FEED / FEED

Roles and Responsibility : Develop Project Milestone Schedules, Summary Level Conceptual Schedules; Develop Establish Overall Project Timescale and Timescale for Key Critical Events ; Evaluate FEED Contractors Schedule and Progress system and recommend solutions; Evaluate FEED Contractors Project Control Procedures(Schedule/Progress/Invoice/Document) ; Participate in EPC Contract Evaluation and Awarding Process; Evaluate EPC Level-I/II/III Schedule and Project Control Scope; Evaluate EPC Contractor Critical Path Studies, Lifting Path Studies and recommend necessary actions ; Evaluate Robustness of EPC Contractors Schedule and Cost; Develop and Establish and Implement RISK Management Procedure; Develop and Establish RAM - Risk Assessment Matrix; Chairing Schedule and Risk Workshop and add on values; RISK Register update as in line with SHELL TECOP Spectrum and Follow-up for different projects; Development of EPC Schedule & Cost RISK Model for Schedule RISK Analysis; Chair CSRA (Cost and Schedule RISK Analysis) Workshops and add on values; CSRA Reports for FID’s to Line Manager.


Senior Engineer : Planning Schedule Control & RISK Jun 2011 - Apr 2012
SEPOC : Safer Engineering Procurement Operations Co. SAANA, Yemen
Yemen LNG Project - Upstream Gas Plant as Consulting Senior Planning/Schedule & RISK Engineer. (Construction/Commissioning & Start-up Phase)
Roles and Responsibility : Key person at PMT side; Establish RISK Management Plan and Procedure; Identify RISK Items(Cost/Schedule) and perform Quantitative Risk Analysis; Establish Spike Values/SD for Duration and Cost for Qualitative RISK Analysis - Montecarlo Simulation; Perform Montecarlo Analysis for Identifying cost and Schedule Contingencies; Participates and adds value in the risk workshops; Review and recommend solutions on EPC’s Level-IV/III/II/I schedules, on Logics, relations, Critical Path, sub-critical paths, conjunctions (Baseline/Work Schedule) for Schedule Optimization and execution as necessary to meet the project objectives and contractual conditions ; Develop, establish and control Pre-commissioning / Commissioning Start-Up detail logic schedule for Owner by Sub-System and System wise; Coordinate, supervise and support Contractors constructability studies, Critical Path studies for Level-IV Schedule development and establish; Review and analyze EPC Progress Measuring System to ensure no errors in control and reporting system ; Delay Analysis. Reviews and endorses measured progress reported by the Contractor for certify invoices; Reviews and interrogates the schedule basis of Contractor's change requests/proposals - assist with reviews and endorses change orders; Coordinate and support contractor during construction to Pre-commissioning swing over period from discipline to sub-systems, systems for Test pack schedule development. Review contractors weekly and Monthly reports, Manpower, Work Volumes for Performance ratio; Coordinate with Vendors for schedule and progress for the Pre- commissioning activities. Follow-up contractor for TQ’s and FDM’s.


Senior Risk Engineer
Oct 2007 - Dec 2008
SCHEMA MANAGEMENT GROUP
GE - Qurayyah Combine Cycle Power Plant (QCCPP) Al-Khobar, Saudi Arabia
Roles and Responsibility: Develop and Establish Risk Assessment Procedures for Quantitative and Qualitative Risk analysis; Develop and Establish Risk
Assessment Matrix and Risk Scoring System. Identify Key Potential Project Threats, Risks Opportunities and Issues. Develop and Propose Measures and Mitigation strategies with core project members for Implementation. Chairing Risk Workshops (Quantitative and Qualitative). Check Contractor Schedule Program Robustness for Schedule Risk Analysis. Development and Implementation of Risk Register. Integrate Qualitative Diskrete Risk Items in Quantitative Risk Analysis. Chairing Key Weekly and Monthly Meetings. Develop Reports for Dash board. Weekly Site Visits.


Senior Consulting Engineer: Planning/Schedule Control and RISK. Jan 2009 - Dec 2010
Satorp (Saudi Aramco Total)
Jubail Export Refinery Plant (Package # 4 COKER Unit) SATORP - Yokohama, Japan
Roles and Responsibility: Key Interface person between Contractor and PMT side; Direct interaction and Co-ordination at EP Phase with EPC Contractor Chiyoda Samsung at Yokohama; Review, evaluate, recommend solutions and support EPC Level-III/II/I Schedule (Baseline/Work Schedule); Support EPC for Developing and Critical Path Studies and Establishing Critical Path, Sub-Critical Path and Lifting Path. Support EPC for Developing Level-IV Construction Schedule and Construction work sequencing; Review contractors Schedule logics, relations and sequence of activities in Level -III Schedules; Support EPC in developing Level-IV Work Schedule in lining with Constructability Work Shops. Chair and Add-on Values for Constructability workshops. Chair and add-on values to Schedule development workshops; Checking and make sure the Vendor, Sub-contractor schedule scope incorporated and aligned in Level-IV/III Schedule; Review and Analyze EPC Progress measuring system to make sure no errors are reported; Support EPC in developing commissioning and start-up logics for establishing Pre-commissioning/ Commissioning and start-up Schedule; Evaluate and Approval of Monthly Physical Progress Reports, Level-III/IV EPC Schedule updates. Notify Company PM/Core team leads on Contractor Schedule Slippage. Anticipated delays, Schedule RISKS and Issues; Weekly Productivity/Performance for critical crafts. Review EPC Level-III/IV; perform Schedule Delay Analysis and find out occurrence of delay and implement mitigation measures; Support and Respond to PMT Quarries from Main office in Rome-Italy; Support EPC to develop RISK Management Plan and Procedures; Support EPC to derive spike values, standard deviation for Durations; Support EPC to perform Schedule RISK Analysis for schedule contingency; Chairing RISK and Schedule Workshops.
Prepare Weekly and Monthly Report for PMT; Develop and update Dashboard meetings.


Senior Planning Engineer May 2004 - Oct 2007
TSS (Subsidiary of Toyo Engineering Japan)
Narashino-Shi, Chiba 275-0024, Japan

(TSS, Subsidiary of TOYO Engineering Japan seconded to JGC Yokohama, TOYO Japan, SUMITOMO CHEMICAL ENGINEERING
Company as Senior Planning Schedule Control and RISK Engineer in the - Home offices for the EPC of Chevron Philips Ethylene Plant, EPC of Pearl GTL Qatar, EPC of PETRO Rabigh Polypropylene Plant.)

Senior Engineer (Planning Schedule control /RISK)
Sumitomo Chemical Engineering Company Mihama-Ku, Chiba Japan.
EPC of Poly Propylene Plant for PETRO-Rabigh as Lead Engineer
Roles and Responsibility : Develop and Establish Project Control Procedures, Progress Measurement Procedures, Schedule Control Procedures, Document Control Procedures; Develop and Establish Project Critical Path studies and Critical Paths and Sub-Critical Paths; Develop and Establish Level
–I Project Management Schedule, Level-II Schedule Program and Overall EPC Level-III Baseline Schedule Program; Develop, establish update and Analyze Critical Path, Sub-Criticality Paths; Develop, establish and update EPC Progress S-Curve, EPC Man-Hour Histogram; Develop Schedule RISK Model perform RISK Analysis – for Schedule contingency evaluation; Schedule delay Analysis; Develop, establish and update EPC RISK register; Tracking Earned Value for Engineering Disciplines for Efficiency; Engineering Progress Measurement and Follow-up with disciplines at different Engineering design centers; Coordinate between Engineering Discipline leads for discipline Interfaces; Interfacing with Engineering Discipline leads for Critical Vendor Engineering Documents like P&ID’s, Loads, GAD, Nozzle Orientations; Close tracking of Vendor PIM Dates and Manufacturing Schedule to Mitigate slippages on FOB Dates; Close tracking of Inquiries, Bid Proposals. Technical Bids, Commercial Bids, PO’s; Attend Weekly Project Controls Meetings, Engineering Meetings, Procurement Meetings; Critical Path Analysis and Improvement narrative report to Control Manager, Project Manager, Project Director; Identification of Schedule Risk Occurrence and Consequence and set mitigation Plan with management team. Advise Construction Team and Construction Sub- Contractor for Schedule Optimization and Improvements; Productivity Analysis for Key Events Such as Piping D/I Vs Planned Man-Hours, Civil, Steel Structure, Electrical and Instrument; Monthly/Weekly Report Preparation; Quarterly/Monthly site visits.



Senior Planning Engineer at Toyo Engineering: Project Management Division
Toyo Engg. Corporation Narashino-Shi, Chiba Japan
Roles and Responsibility : Establish RISK Analysis Methodology and standardize Risk Development Plan & Procedure for Toyo Engineering Japan; Research and Case studies of the Historic Project Information for the establishment of O-M-P Durations and fix the limit state of duration SD’s for EPC work elements; Develop and establish RISK Register (Cost & Schedule) for various projects(ongoing and proposals); Perform RISK Analysis, Montecarlo simulation for Cost and Schedule Contingency for on-going and Proposal Projects; Conduct detail discussion with project team members for Identifying the Risk elements and discuss with principal planning Manager on RISK Occurrence consequence and Mitigation plan for the preparation of the Schedule RISK Register for the top management; Understanding the outcomes of Cost and Schedule contingencies with different software platforms like PRIMAVERA Montecarlo, PERTMASTER, @RISK, CRISTAL BALL.

Senior Planning Schedule Control and RISK Engineer
JGC YOKOHAMA
Minatomirai, Yokohama, Japan
EPC of Ethylene Plant for Chevron Philips.
Roles and Responsibility : Develop and Establish procedures for Project Control, Schedule Control, Progress Measurement, Document Control, with Project Control Manager; Develop and Establish Project Control Work Break Down Structure and Functional Control Work Break Down Structure; Develop and Establish Level- I Project Management Schedule and Monthly Update; Develop and Establish Level-II and III EPC BASELINE Schedule, EPC WORK Schedule and Weekly and Monthly Update; Develop and Establish Pre-Commissioning Logic and Detail Schedule by Co-ordination with Pre- Commissioning Manager; Develop Schedule RISK Model for Schedule Risk Analysis; Perform RISK Analysis periodically. Preparation of RISK Register and Inform Schedule Manager/Project Manager for Immediate Actions. Participate; Schedule and RISK Workshops. Level - III/II/I EPC Baseline Schedule preparation and periodical updating and reporting to Project Control Manager; Management Summary Schedule update by status line by remaining duration. Procurement and Construction Progress calculation and input those values in the Progress S-Curves for Monthly report; Update Man-Hour Histograms for Monthly report. Summarize the Material Status Report from PMS for Monthly Report. Attend Expediting meeting; Update INDRA Document Control System. Attend Weekly meeting with Chevron Phillip team members; Weekly updating of JDOC and VDOC downloaded from INDRA for the Chevron Phillips and JGC. Maintaining e-room in the FTP Server; Maintaining e-room in the FTP Server. Gathering attachments for Monthly Report, compiling the Original and distribute the copies to Chevron Phillips and JGC Yokohama and JGC Saudi Arabia. Schedule Coordination with Engineering Team Procurement Team and Construction Team; Settlement of Schedule Disputes and Establishment of Scheduling Methodologies between Project Control Manager, Field Control Manager and the Construction Schedule Engineers; Close Monitoring of Construction Schedule and Sub- Contractor Performance.


Planning/Schedule Control Engineer Aug 2001 - Dec 2003
Chiyoda Corporation - Yokohama Tsurumi-ku, Yokohama Japan
EPC of OMAN LNG for Shell / EPC of SABIC Methanol Plant for Saudi Industrial Petrochemical Company / EPC of Raslaffan Cooling
Water Project – Phase –I QATAR.
Roles and Responsibility: Developed Project 32 month EPC Baseline Schedule i.e. Level –I,II, III and Pre-commissioning/Commissioning Schedule. Progress S-Curve’s were superimposed on Level - I Summary Schedule; Periodical updating for Level - III Working Schedule, review with Baseline Schedule and reporting to Controls Manger; Critical Path Studies and Critical Path Analysis. RISK Analysis (Montecarlo Simulation
/RISK Register); Engineering Physical Progress values were gathered from Chiyoda Document Management System and assigned to proper tasks defined in Level - III Project Master Schedule. Schedule Status was defined by Status line; Engineering Progress Meeting was held with each discipline Lead Engineers and Most Likely Forecast Dates were fixed by detail; discussions on each Engineering Deliverables and Tasks; Major delays and impacts highlighted and notified to engineering discipline leads to avoid further delays in the engineering deliverables; All Major Changes were highlighted in Level - III Master Schedule and informed the company on schedule deviations and additional scopes by Narratives; Detail evaluation on Material Vendor reports were carried out for close monitoring for Fabrication status and Vendor Key interface drawings and documents with engineering; Delay’s on the Vendor Fabrication Schedule were highlighted and reported to the Procurement Manger and Controls Manager to avoid further delays in fabrication; Logistics schedules were checked and estimated time for delivery of equipment’s at port, site and required site dates were closely monitored to avoid the delay in Erection Schedules; Procurement Physical Progress values were gathered from PROPS and assigned to proper tasks defined in Level - III Project Master Schedule and schedule status were defined by Progress line; Construction Sub-contractor’s detailed Schedules were thoroughly checked against their target milestone dates, Work sequence, Manning’s schedule, Physical Progress Curves; Subcontractors Heavy Rigging Schedules were closely evaluated and Coordinated with Equipment Fabricators and Logistics supports to avoid further delays; Detailed Commissioning and Start-up Schedules were made system wise in line with Construction and Pre-commissioning events; Preparation of Monthly/Weekly Reports.
EPC of SAFCO - IV Ammonia Plant for Jubail Petrochemical Complex
Roles and Responsibility: Preparation of Level –I/II/ III EPC Baseline Schedule, Manpower Histogram, Progress S-Curve for Proposal Stage; EPC of Raslaffan Cooling Water Project, Qatar Petroleum and Working Schedule update on weekly wise on project execution phase.
EPC of Kuan Tang LNG Receiving Terminal, Tung Ting Gas Corporation < FEED >
Roles and Responsibility : Created and Updated Engineering and Procurement Phase of FEED Baseline Schedule; Man-Hours were loaded in master schedule craft wise and Man-hour histograms were produced; Money Value was loaded in US$ Euro, Taiwan dollar and Japanese Yen; Earned Value reports were produced in all mentioned currencies; Attend Monthly client meeting held at Client office in Taiwan for payment settlements on Primavera EVMS Reports; Schedule updating were done weekly wise and Engineering Physical Progress values were gathered from engineering deliverables list and assigned to proper tasks defined in Master Schedule. Schedule Slippages were highlighted and reported to the Control Manager and Project Manager for actions.



Planning Scheduling Engineer Jul 1998 - Jun 2001
KENTZ Corporation-QATAR.
EPC of Power Plant at Halul Island, Doha Qatar, Flour Daniel Steam Power Plant at Rabigh, Saudi ARAMCO Gas Oil Separation Plant at Abqaiq & Shedgum.

Roles and Responsibility: Preparation of Manpower Loaded Schedules and Progress S-Curves for Ongoing and Proposals Projects ; Development of Overall Progress Monitoring System and update. Forecast required Man-hour to complete the remaining Scope and Required Manpower. Coordination with Engineering Team and forecast IFC required date monthly wise. Produce work front availability – Plan from loaded quantity in Primavera detail schedule. Development of Pre-Commissioning Logics and Pre-Commissioning and Commissioning Schedule. Development of detail schedule for EOT.




Construction Planning Engineer.
FEB 1999 - FEB 2000 – DUBAL, Dubai – U.A.E
EPC of Dubai Aluminum Smelter: Pot line 6,7, Cast-House and Power Generation Unit.

Roles and Responsibility: Review and Check Construction Contractor Procedures in line with Detail Schedule and Progress Measurement system. Support Contractor to Establish Critical Path Studies, Lifting Path, Constructability Studies. Support Contractor for Development of Level-V Construction Baseline Schedule and Working Schedule. Support Contractor for Development of Micro Schedule on Critical Areas. Review and Approve Contractor physical progress measurement for Monthly Progress and Invoicing. Coordinate with engineering lead discipline engineers for timely release of engineering IFC Drawings. Attend weekly monthly meetings with DUBALandContractor representatives. Review Contractors weekly and Monthly reports, Progress measurement and certification for Invoicing. Prepare Monthly report for Top Management. Daily site visits to ensure actual work progress as perplan. Coordinate with Civil, Mechanical and E & I Contractors to avoid work clashes. Development of Pre-Commissioning, Commissioning and Start- Up Schedule Program and updates. Development of Shutdown programs for Potline 4,5 and Cast-House, Kilen, Power Plant.



Schedule Engineer Feb 1996 - Apr 1998
Chiyoda Petrostar , Alkhobar, Saudi Arabia
Petromin Lubricating Refinery LUBREF - II Project for Mobil
Roles and Responsibility: Detail Construction Schedule development and updating, reporting, Pre-commissioning Schedule preparation, Updating,
Manpower and Material Control; Physical Progress Monitoring and Reporting/Weekly/Monthly Reporting; Development of detail level Schedule for Piping Test Packs on Sub-System and System wise; KPI tracking on weekly wise .i.e Actual Installed Quantity Vs Planned. And Productivity; Coordination with Procurement team for ETA and ATD of equipment’s and Materials; Assist Lead Planning and Schedule engineer to meet daily department requirements.

Schedule Engineer Feb 1993 - Nov 1995
Al-Muhaidib Contracting Co., Dammam-Saudi Arabia
Saudi Aramco, SABIC, SCECO, Royal Commission, King Faisal University & Medical Collage.
Roles and Responsibility: Development of Detail Schedule program by Critical Path Method by Arrow Diagramming and Precedence diagraming Method by PRIMAVERA DOS Version and then Primavera Windows Version(Ver-03). Develop Progress and Superimpose ‘S-Curve and Manpower Histogram on summary level construction schedule program. Schedule update on weekly wise and monthly wise and report to Saudi ARAMCO Representative. Establish Construction Progress Measurement system and weekly update. Weekly Site visit and weekly progress update. Development and update recovery schedules and update and monitoring. Schedule revisions as required.