Kuldeep singh Parmar

Candidate ID: 1803317

Career Summary

Accomplished and results-driven professional with extensive experience managing all aspects of mechanical engineering. Proven success in completing installing equipment, pre-commissioning, commissioning, and start-up of projects, and preserving and maintaining permanent plant project equipment.

Skill Set

Mechanical / Equipment / commissioning Engineer

Professional Information

Total Experience : 27

Nationality : India

Qualification Level : Diploma

Job Function : Installation / Maintenance / Repair

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

Kuldeep Singh Parmar:
kuldeepsinhp@ymail.com https://www.linkedin.com/in/kuldeep-singh-parmar-4aaa73177/
+91-9909747958 / +91-9638326578
Accomplished and results-driven professional with extensive experience managing all aspects of mechanical engineering. Proven success in installing equipment, commissioning, and start-up of projects, and preserving and maintaining permanent plant project equipment. Elite presenter with the talent to achieve ambitious outcomes by galvanizing teams, and building allies. Possess exceptional communication and interpersonal skills, ability to build relationships and synergy across business lines to drive positive change.
Mechanical professional, Areas of Expertise include:
• Installation & erection of Mechanical facilities • Static & Rotating equipment • Maintenance & repair
• Planning and execution • Turnaround shutdown • Rotary & Package operation activities
• Rotary equipment troubleshooting • Pre-commissioning & commissioning • SPIR activities
• Resource planning for equipment maintenance activities • Refining Maintenance procedure
I have relevant experience of 20+ years of handling and managing mechanical work including equipment installation, erection, Maintenance, pre-commissioning, commissioning & start-up in oil & gas projects. I handled all Rotating & static Equipment such as pumps, centrifugal compressors, Gas turbines, Gas engines, Diesel engines, LNG Loading arms, air fin coolers, Heat exchangers, storage tanks, Distillation & stripper columns, filters, and Package Equipment such as chemical dosing skids, Firewater packages, Flare Packages, industrial boilers, Instrument air packages, Desalination packages, HVAC packages, Nitrogen generation packages, produced water & wastewater packages, Gas dehydration packages, Emergency generator package.
HSE Training & Accountability:
• Specific training for SCBA • Specific training for authorized gas tester • Specific training for Scaffolding safety
• Firefighting training • work permit issuing authorization in KOC Team • Training on the Job safety assessment
• Specific training for confined space entry • Specific training for work over water • Commissioning HSSE awareness
• Work permit Authorization in the ADNOC team • Work permit authorization in the SONATRACH team
Professional Experience
Saipem S.P.A • Asia pacific area, West Papua. Indonesia. March 2023 to continue.
Project: Tangguh LNG expansion project train: 3 • Value $ 8 B • Client: BP, designed as a Rotating equipment lead engineer performed overall supervision of pre-commissioning and commissioning activities on all systems as per scheduled networks, acceptance criteria, and start-up specific procedures, documentations and ensure completion on time prior to hand over to operation team.



Key Accomplishments:
• Contributed to the success of company progression by ensuring the commissioning, and maintenance of rotary, and packages at the LNG project.
• Perform tasks assigned by the project commissioning Leader, related to the preparation and execution of the pre-commissioning, commissioning, and startup activities. Interface with engineering disciplines, construction personnel, vendors, and subcontractors.
• Identify technical problems, agree with corrective actions, and follow up with their implementation.
• To drive mechanical pre-commissioning and commissioning activities at the site.
• Ensure the safe execution of all commissioning activities through the application of the work permit procedure.
• MRT Activities for the Centrifugal pumps, Chemical dosing pumps, and Reciprocating compressors.
PETROFAC ONSHORE CONSTRUCTION & ENGINEERING • Kuwait • Feb 2019 to August 2022
Project: GC 32 (Gathering Center project) • Value: $1.3B • Client: Kuwait Oil Company (KOC) designated as a Maintenance Engineer-1, Completed the preparation of the preservation maintenance dossier in mechanical completion & commissioning dossiers. Delivered exceptional leadership and management to the high-performing installation & preservation team activities. Maintained accurate records and draft reports using Win PCS (Windows-based project completion system)/ Petro Pcs.
Key Accomplishments:
• Planning of activities for rotary, and static & packages for the construction, commissioning, and maintenance phases.
• Scheduled audits of the subcontractor team to effectively implement the Maintenance schedule.
• Effectively utilization of available resources for the Preservation and maintenance activities.
• Assigned the responsibilities of identifying and troubleshooting rotating equipment issues.
• Checking and testing rotating equipment to ensure that the rotating equipment meets operational standards.
• Perform the tasks of developing and implementing long-term operational and maintenance strategies for rotary equipment.
• Operation activities for the Man Gas compressors & Caterpillar engine packages.
• Spare parts (SPIR Forms) have been reviewed & verified for the commissioning & maintenance phases.
• Supervising the installation & alignment of mechanical stationary and rotating equipment in the plant.
• Dry Gas seal cartridge installation, Pre- alignment & train final alignment activities for the MAN centrifugal gas compressors.
• Overhauling of Gas compressor including replacement of bearings and dry Gas seal.

PETROFAC INTERNATIONAL • ALRAR, ILLIZI, Algeria • Jan 2016 to Feb 2019
Project: Inlet Gas separation & boosting facility • Value: $650M • Client: SONATRACH designated as a COMMISSIONING & MAINTENANCE ENGINEER-1, Held accountability for crafting construction, mechanical commissioning, executing fields, and following up on vendor activities. Verification of spare parts and Lubricants for the pre-commissioning & commissioning activities.
Key Accomplishments:
• Prepared and implemented the Preservation and maintenance schedule plan for the installed equipment.
• Physical Verification of the spare parts for the pre-commissioning & commissioning phase.
• Efficiently utilized available Manpower for the Preservation and maintenance activities.
• Assigned the responsibilities of identifying and troubleshooting rotating equipment issues and developing techniques to address the issue.
• Caterpillar Gas engines, maintenance & operation activities after the commissioning phase.
• Troubleshooting for the Gas engines & turbines including mechanical, electrical & instrument discipline.
• Handled failure investigation and RCFA of malfunctioning equipment.
• Imparted advice to the Operations team and coordinated with vendors for the specific Rotating equipment.
• Experience in the development of maintenance strategies and procedures for static & rotating equipment.
• Experience in various API Standards and Recommended practices like API 610, 614, 616, 617, 686, etc.
• Experience in Baroscopic inspection (Olympus IPLEX).
PETROFAC INTERNATIONAL • Abu Dhabi, UAE • Aug 2015 to Nov 2015
Project: Bab Gas Compression Project • Value: $500M • Client: Abu Dhabi Company for onshore oil operations Ltd designated as a COMMISSIONING & MAINTENANCE ENGINEER-1, Spearheaded all witness and verify contractor preservation activities. Controlled construction, and pre-commissioning/commissioning activities of rotary and static equipment. Kept abreast with various types of lubricating agents/coolants, their grades, and related standards.
Key Accomplishments:
• Delivered exceptional support to vendor’s representative to carry out the commissioning test and during start-up.
• Development and implementation of a Periodic Maintenance schedule for the installed equipment.
• MRT activities of the centrifugal pumps, screws & centrifugal compressors.
• Identification & segregation of gaskets & cartridge filters for final box-up of pressure vessels & filter packages.
• Inspecting various parameters such as Vibration, Bearing temperature, Sound, RPM, and Alignment Checks.
ESSAR CONSTRUCTION LIMITED • Abu Dhabi, UAE • May 2014 to Aug 2015
Project: Spent caustic treatment Plant, Refinery • Value: $80M • Client: ADNOC– TAKREER designated as a DEPUTY MANAGER, (MECHANICAL) Assumed accountability for generating and managing the planning for the equipment progress and assessing vendor documents for mechanical activities. Efficiently implemented TRAs for health, safety, and Environment relevant to the piping activities. Allocated daily tasks to equipment and piping crew to maintain site progress.
Key Accomplishments:
• Streamlined and managed processes for the installation & alignment of equipment, including routine preservation maintenance activities of rotating, static & package equipment.
• Vendor documents reviewed & implement for static & rotary equipment activities.
• Assigned the responsibilities of identifying and troubleshooting rotating equipment issues
• Preparation of method statements for equipment installation.
• Properly managed the piping spools fabrication and field progress of piping activities
DODSAL ENGINEERING & CONSTRUCTION Pte. LIMITED • ABUDHABI• Feb 2012 to Apr 2014
Project: Shah Gas Development Project (Al. Hosn Gas company) • Value: $4B • Client: Gasco, Adnoc & Oxy Ltd designated as a DEPUTY MANAGER (STATIC & ROTARY) Improved knowledge of the various construction tools, rigging tools, safe working standards -such as permit to work, hot work permits, vessel entry permits, and vehicle entry permits, and other safety standards. Static and rotary equipment installation as per the work-specific method statements.
Key Accomplishments:
• Acknowledged by senior management for the erection of 550 No’s of static and rotating equipment, including alignment and preservation of equipment.
• Preparing & implementing rigging plan and method statement for the critical and heavy lift equipment.
• Spare parts identification for the final box-up of static equipment including pressure vessels &filters.
• Experience in the development of maintenance strategies and procedures for static & rotating equipment.
• Responsible for the Air fins coolers installation & erection including structural, Plenum & fan assembly activities.
• Prepared the method statement of construction & pre-commissioning as per the Client DGS.

Huber Group India (Germany), Vapi, Gujarat, Apr 2000 to Feb 2012
Senior Engineer (Mechanical Maintenance)
Key Accomplishments:
• Routine maintenance and overhauling jobs during the shutdown.
• Turnaround shutdown activities of Boiler, Reactors and heat exchangers.
• Installation and maintenance of pumps, columns, vessels, exchangers, and other static equipment, reviewing of piping isometrics, Plant startup, and safety audit Review.
• Developed and implemented preventive maintenance procedures for rotary equipment.
• Handled the preparing and maintaining reports of repairing and replacement parts of the equipment.
• Proficient in SAP-R3 in the PM module including inspection, notifications, corrective and preventive maintenance, and repairs of the installed equipment.
• Diesel engines, screw & reciprocating compressors maintenance & trouble shooting.
• Erected & commissioned new Utility Plants including IBR Boiler, Air Compressor, Reciprocating, Screw Chilling, and Ink Manufacturing Plant with Layout.

________________________________________
Educational Background
Higher Diploma in Mechanical Engineering (Three years course)
Directorate of Technical Education M.P.- Ujjain | India
Languages: English, Hindi, and Gujarati (Fluent), Arabic (Basic)