Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

SIRAJ AHMED KHAN

Candidate ID: 1530449

Career Summary

Project Manager with 24 years experience in Oil / Gas / Petroleum functional area

Skill Set

Project and construction management, scheduling, cost controlling,

Professional Information

Total Experience : 24

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Site Engineering / Projects

Work Location Preference : Kuwait, Bahrain, Oman, Qatar, UAE

Detailed Profile

SIRAJ AHMED KHAN
Mobile: (+974) 66451684,Phone:-+974 44354634
E-mail: khansiraj2003@yahoo.co.in

PROFILE:

23 years of managing construction/shut down projects including installation and commissioning of projects. Having expertise in following areas:-

Project and Site Management. Pipeline , Piping, Station, Mechanical works.
Supervision & team building. Installation ,pre commissioning, Commissioning.
Planning and Development. Managing Multidiscipline activities.


Planning and managing projects from inception through completion. Able to build effective and productive working relationships with clients, contractors as well as team members.
Worked in various fields like Oil and Gas, Petrochemical, Chemical, Mechanical, Refinery projects involving multi discipline activities. Worked in Green field , Brown field and shut down related projects.

Well conversant with Primavera.

Presently associated with M/S BCEC as Project Manager .

Training/Seminars

- H2S/BA Training Course
- PMP Training course
-ASNT RT level II course
-Planning, scheduling and projects control for EPC projects by METCON.


EMPLOYMENT HISTORY

SL No From To No. of
Years Company Designation

1
05/2006
Till Date
12.5 Yrs.
Black cat Engineering & Construction Co.Doha-Qatar.
Project Manager.
2 9/2004 04/2006 1. 5 Yrs. Essar Projects Ltd . Senior Project Engineer.
3 05/2001 8/2004 3. 3 Yrs. Reliance Engineering Associates (p) Ltd. Senior Mechanical Engineer.
4 7/1999 3/2001 1 .8 Yrs Mitsubishi Heavy Industries Ltd.
Mechanical Engineer.
5 6/1998 7/1999 1 Yrs. Toyo Engineering India Ltd.
Mechanical Engineer.
6 7/1995 5/1998 3 Yrs. Nitson and Amitsu Pvt Ltd. Site Engineer.


MAJOR PROJECT EXPERIENCE

MAY 2006 to Present

Company : M/s. Black Cat Engineering & Construction.
Current Position : Project Manager.

1.PROJECT: ETHANE EXPORT PIPELINE PROJECT
JOB:- Installation and commissioning of 3 km 20 inch pipeline consisting 13 nos major crossings and 2 nos Micro Tunnel includes 22000 cub mtr machine and 4500 cubic mtr manual excavation , CP works including anode installation and bore drilling, it also includes station piping, structural and system integration works. This project enables safe and reliable export of Ethane from Shell NGL to QP A21 station.
CLIENT: QATAR SHELL/WORLI PERSON

2.PROJECT PROJECT: EPIC OF HOOKING UP OF KHUFF & ARAB D WELLS.
JOB:- Scope includes installation of new facilities to the respective well head treatment plants (WHTP) manifolds and all related piping, instrumentation, electrical, CP,telecom and civil works .Major works are 14 km pipeline with hot insulation, 2200 nos pipe support , 6 nos bore drilling works, wellhead hydraulic unit control panel, 19 culverts, SCADA modification, solar power system etc.
CLIENT: QATAR PETROLIUM.

3.PROJECT: EPIC FOR GAS SUPPLY TO FACILITY D AT AL WAKRAH (PHASE-1)
JOB:- This project facilitated supply of fuel Gas to Facility D power station south of al Wakrah, via a new QP gas receiving station W5. Appx 7 km new 30 inch pipeline , conducted DCVG(Direct Current Voltage Gradient) inspection on 30 KM existing 30 inch pipeline , a new Gas receiving station , station W5 installed adjacent to Al Wakrah Station.The new Station W5 consists of pipeline receiver,KOD’s,vent stacks,closed drain system, LER building, DG system,N2 skid,SCADA PLC system,ESD,F&G system etc .All associated electrical, instrumentation, pipeline, piping, civil, structural works as well.
CLIENT: QATAR PETROLIUM.

4.PROJECT:- THREE COMBINED EPIC SHUTDOWN PROJECTS
JOB:- Engineering, Procurement , Construction and Commissioning (EPC) services for upgradation at QG2,QG3 and QG4. Major Job includes Excavation to modify underground sea water system, Process and instrument piping fabrication, installation /modification including supports, Glass flake lining, cold tapping, and major Tie-in activity, stress analysis for existing piping and provide necessary solution, ESDV installation, DCS modification, pre commissioning and commissioning. This project includes three Major shutdown.
CLIENT: QATAR GAS

5. PROJECT: GC 10100600- EPIC FOR PRODUCED WATER TREATMENT & INJECTION .
JOB:- This is a project of produced water Treatment & injection ( Dukhan Fields KN,FS.FM & JALEHA Degassing stations and PWI Stations PS-2,4,6,8 & 9) Phase-2. It is a multidiscipline project and major job includes demolition of existing piping and associated works, site preparation and earthworks, construction of culverts, duct banks, equipment foundations, pump sheds, substation buildings, installation of internally HDPE lined 12” & 10” pipelines (25 km), FBE coated station piping ( 95 000 ID), pressure control valves (PCV), shutdown valves, ESD valve partial stroke testing system, transfer pumps (12 Nos), instrument air lines, DCS / ESD / F&G system, F&G detection and protection, field instruments, telecom network system, power management system (PMS), substation control system (SCS), installation of new substations, DC & AC UPS, building systems, area lighting, earthing system, cathodic protection system, rotary and static equipment, surface preparation and painting of piping & pipelines, testing, pre-commissioning & commissioning.
CLIENT: QATAR PETROLIUM.

6. PROJECT:-GC09102200- EPIC OF SWEET FUEL GAS SUPPLY TO DUKHAN CONSUMERS.
JOB:- Major jobs are design, procurement ,installation and commissioning of 36” -7.2 Km , 18” – 25.5 Km , 12”- 12.5 km ,& other 6” & 4 “ pipelines, 24 nos valve stations, 4 nos electrical sub stations building and other electrical and instrument job , 35 000 Id piping, 48 km Fiber optic cable installation, electrical cable installation, Microtunnelling, 550 MT structure, rotary and static equipment, modification of existing GDS SCADA SYSTEM and in some stations new SCADA PLC system. installation, loss prevention, telecommunication and shut down for tie in with existing pipe and system modification etc.It is a combination of green and brown field job.
CLIENT: QATAR PETROLIUM.

7. PROJECT: New Arrangement to improve N2 Availability.
JOB:- N2 Pipeline/Piping to facilitate additional N2 to existing facilities
CLIENT: QATAR GAS.

8. PROJECT:- GSL 003- N2 PIPELINE
JOB:- Construction of Centralized facility for N2 and O2 storage and construction of 12 km- 14 inch pipeline to transport Gas from Oryx GTL facility to various consumers at Ras Laffan Industrial city.
CLIENT: GASAL

9.PROJECT: AL/3091/50 & QIG 0001.4 - PIPELINE.
Construction and commissioning of Nitrogen plant at Mesaieed Industrial city & Construction of 14 inch dia 15 KM Nitrogen pipeline at Mesaieed.

CLIENT: GASAL/AIR LIQUID

10.PROJECT: GC08110600 : EPIC FOR IMPLEMENTATION OF CRITICAL MECHANICAL PCR (MCE/MC/04/248) FOR REPLACEMENT OF DISULPHIDE SEPARATOR IN NGL-1 PLANT, MESAIEED.

11.PROJECT: GTC/05/162/ED - EPIC Of 3 NOS Firewater Tank At Fahahil South Plant.

CLIENT: QATAR PETROLIUM

Responsibilities and duties:
• Understand the project charter , scope and its importance to client and own Organization
• Schedule the project in logical steps and budget and time required to meet deadlines.
• Compiling project risk register and reviewing the same periodically to mitigate the issues.
• Co ordinate with Engineering dept for FEED validation, TOPO and Geo Technical investigation,Design Review Meeting,CEMP(Construction Environment Management plan)SIL(Safety Integrity Level), QRA(Quantitative Risk Analysis), HAZOP(HAZard and Operability) ,HAZID(Hazard Identification) ,Design Basis Memorandum(DBM),Vendor Technical Evaluation, Drawings and arrange site surveys as required.
• Co ordination with Engineering and Procurement to complete the TBE (Technical Bid Evaluation).
• Resolved queries received from vendor in coordination with Engineering and QA/QC during manufacturing of key equipments.
• Finalize Change orders (received from client) in coordination with client and internal disciplines.
• Co ordinate interface management with various other companies and conducting meeting if required to resolve issues.
• Coordinate with HSE department for Deliverables like EMP(Emergency Management plan),HSE plan,Environment Management Plan,Environment Risk Register etc.
• Review of fabrication , erection , pre commissioning / commissioning schedules and monitoring site progress. Reviewing the Manpower mobilization and release plan to ensure minimum idlness.
• Ensuring proper construction documents like MS and JSA/RA are prepared ahead of work starts.
• Co ordinate with QA/QC department for quality documents like Project quality plan(PQP), ITP,WPS,PQR etc.
• Raise TDR (Technical Deviation Request, TQ (Technical queries) in co ordination with Engineering and QA/QC department when required.
• Ensure timely issuance of MAR( Material Approval Request) to client, MIV(Material Inspection and verification) as well as timely review of vendor documents to avoid delays.
• Co ordinate with Functional Managers and HR for project team members.
• Co-ordinate with support service departments to ensure timely delivery of required resources.
• Responsibilities for day to day client Management and coordinate with vendors and Subcontractors.
• Arrange regular meetings with construction team members to identify risk areas and find out solution to ensure timely completion of project.
• Provide support to project team for expenditures and related issues as identified during the different phases of the execution stage. Providing regular feedback to Operations Manager about project issues.
• Resolve issues and disputes on invoice/purchase orders if any with vendors/sub-contractors.
• Ensure quality and safety parameters being implemented at site as per the client / company standards.
• Reviewing the cash flow and S-curves, manpower histogram etc.
• Reporting/reviewing financial status of the Project along with cost control department and senior Management.
• Ensuring that all the punch item received are within scope, if not to take up with client/end user to resolve the issue.
• Review/prepare Project closed out reports in coordination with Documents Control, QA/QC Dept. and Planning controller.
• Expediting SAP coding / submitting SPIR records as necessary and expedite project handover process.

September 2004 to March 2006

Company : M/S Essar Projects Ltd.

Position : Senior Project Engineer

• To ensure that the projects are planned, executed and implemented as per the schedule with minimum deviations starting from design and approval of engineering drawings to the commissioning of the project.
• Preparing site procurement requirements, schedules, planning operation, site progress monitoring, establishing construction methods, resolve design issues and control of resources.
• Report deviations in the drawing, arranging to issue revised dwg and procuring material as per revised dwg.
• Assisting Deputy General manager in various issues including project schedule and budget.

May 2001 to September 2004

Company : M/S Reliance Engineering Associates (p) Ltd,

Position : Senior Mechanical Engineer

Responsibilities:

• Working out the scope of various services for the execution of jobs in consultation with Lead engineer and construction manager.
• Plan and execute yearly turn around shut downs for refinery as per plan.
• Release the drawings to the contractor for the construction.
• Co-ordination for proper mobilization of contractors.
• Ensuring availability of material at site.
• Installation/alignment and commissioning of static and rotary equipments including vessels, heat exchangers, pumps, Gas turbines, boilers, Cooling Towers ( for Captive power plant) etc.
• Provide technical support to execute job as and when required.
• Installation of piping (CS/SS &ALLOY) with various type of supporting systems through study of P& ID and isometric drawings for field modification & up gradation (Quality Yield Improvement and Value Maximization projects) of Jamnagar refinery/petrochemical.
• Interfacing with plant operation personnel for work permits and with contractors for completing the job within planned time, cost without effecting safety and quality standards of the job.
• Ensuring HSSE requirements and provide a leadership for the improvement of it.

July 1999 to March 2001

Company : M/S Mitsubishi Heavy Industries Ltd
Position : Mechanical Engineer .

Working out the scope of job for execution, reviewing the drawings and handing over the same to contractors. Monitoring and assistance to sub contractor for day to day activities.
Pre commissioning and commissioning activities.

June 1998 to July 1999

Company : M/S Toyo Engineering India Ltd
Position : Mechanical Engineer .
Job : Haldia petrochemical Ethylene Project at West Bengal, India.

Supervise and provide technical support/expedite in relation to execution of piping, equipment installation, testing, pre commissioning etc at Heater and Quench section.

July 1995 to July 1998

Company : M/S Nitson and Amitsu Pvt Ltd
Position : Site Engineer

Projects completed:-

a)Pumping stations at Virangam chaksu Panipath pipeline Project , IOCL,S’nagar, Gujrat.
b)Pumping stations at Salaya Mathura pipeline Project, IOCL, Rajkot, Gujrat & Kota, Rajasthan.
c) Modernization and Maintenance of Alipore Mint, Calcutta, West Bengal.
d)LPG import cross country pipeline, IOCL, West Bengal.

Erection, Alignment and pre-commissioning of various rotary and static equipments like Allen Engine (an oil pumping unit having 3000m3/hr capacity), pumps, compressors, Generators, lub oil filter, fuel oil filter, diesel service tank, oil mist detector, silencer, lube oil cooler, radiator, control panels etc for different pumping stations.Fabrication, erection and testing of various types of piping and pipeline.







EDUCATION

B.E(Mechanical) with first class from National Institute of Technology, Agartala. ( formerly Tripura Govt Engg College), Tripura university in the year 1995.

PERSONAL INFORMATION

Date of Birth : 12-11-1970.
Nationality: Indian
Passport Details: R8199456 Issued from DOHA, QATAR.
Valid upto:- 27.11.2027
Driving License:- Qatar driving license valid upto 14-05-2023
Mobile No:- +97466451684.