Andhra Pradesh State Fiber net Ltd...
Since Dec 2018 : Working as District Network Manager in Anakapalli
BBNL Project & Maintenance
? Lead the Fiber team to make Rings of Master mandals, Mandals & GP through fiber for giving
the connectivity to each grama panchayiti
? Lead the Active team (L&T vendor, delite team) for Installing the routers in Master mandals,
Mandals, And GPs and configure it. OLTs configurations done at GPs level for giving domestic &
Enterprise connections.
? Day to day monitoring the Mandal, GPs & OLTs offline & Online count and co-ordinate with
Active team & Passive team for making live with in SLA
? Hourly monitor the link connectivity & protection links of each mandals for take necessary
actions on down rings with FRT team. Co-ordinate with NOC team for router & OLT
configuration issues as well as co-ordinate with Electrical team for power issues.
APSFL Project & Maintenance
? Maintain 1 District Node & 2 Zonal Nodes GPON Techno ledge of NCS 55A2, Cisco DWDM, Cisco
4port & 2 Port Routers, PT OLTs8port & 32 port with DHQ & POP Engineers.
? Proactively Monitoring Nodes closely and co-ordinate with respective NOC, O&M and FRT teams
at the time of outage and restore the links with in SLA.
? Link up gradation, New links establishments done as per traffic & customer utilization by
verifying the traffic reports & clear the losses for existing links which are crossing threshold.
? Co-ordination with Marketing Team for new OLTs Installation, PONs allocations shifting of OLTs
with vendor team as per business requirements.
? Co-ordination with Enterprise teams, BSS Teams, NOC team for new caf activation and services
adding for new customers and clear the Trouble Tickets with in Time lines.
? Timely supported and closed the issues for proactive complaints which is received in operational
Groups and calls.
? Co-ordinate with all vendors (UPS, Batteries, Genset, AC Etc..) for any activities. Installations &
Issues.
? As per report time to time fiber loss rectification work has been completed by coordinating with
NOC & FRT Team.
? Maintain all related reports like inventory and timely submitted to Concern Department.
? Co-ordinate with Electrical Department for power issues and make it clear with Minimum
outage time on war foot basis
? Inspection of Material & Inspection of BBNL Project
? Planning of new Mandal Connectivity paths for ring protection based on Surway.
? Maintain Domestic & Enterprise Connections (Govt and Private)
Airtel Project:
Aug 2017 to Dec 2018 : Zulu Teleservices pvt.Ltd.. ..Visakhapatnam.
FTTH project
• Working As a team lead in FTTH Airtel project in Visakhapatnam
Responsibulities:
? Making Individual ODF drawings from Auto-cad drawings of site and make project
Synopsis.
• Supervising The HDD machine drilling as per drawing in the Area
• Supervising the Chamber Installation, Cable pulling (96F,48F & 24F)
• Supervising the Splicing, Midspan and splicing at Fatbox locations.
• Installing the Fatbox with the Residence permissions as per drawing.
Reliance Project:
Dec’2014 to June 2017: Essjay Ericsson India Pvt..Ltd..Visakhapatnam as a BSS -SME
Oct’2008 to Nov 2014: Alcatel-Lucent Managed Solutions India Pvt..Ltd..Visakhapatnam as a
BSS & RF -SME
Sep’2007 to sep ’2008: Reliance Communications Limited. Guntur as a RAN Engineer
Responsibilities:
• Participate as a team Member in Installation, Integration and up-gradations of GSM
Huawei Frequency Radios ( BTS 3012,3900& BSC6900 ).
• MW Installation and clear the line of site issues and make the link up in both sides.
• Regular monitor the service effect & non service effect alarms liKe VSWR and clear with
in SLA with WOs.
• Attend the Outages in both media and Radio. Trouble shooting and make it up with in
SLA.
• .Preventive Maintenance for BSC & BTS on regular Bases (Health-check &Backups) (BSC
weekly, BTS-for every six months).
• Integration for new sites. Up gradations, Rehoming, Trouble shoot for existing sites for
improving performance.
• Planning the sites ( BCCH,MAIO,BSIC) around the network, fine tuning the neighbors &
Key parameters for better utilization & KPI Improvement without Interference.
• Monitoring the sites performance in all Aspects and doing the corrective Actions.
• Doing retrofits as per TAC instructions. And attend on-line trainings for up gradations
• Conduct the Conferences with team for corrective & preventive actions. And given
trainings to the team.
• Attend meeting with central team for Network Improvement (NWA) and KPI. Planning
for new sites.
• Connectivity and coverage complaints taken from Clarify tool & From Distributers and
solve within SLA
PREVIOUS ASSIGNMENTS
Nov’2004 to Aug’2007: M/s Indian Telephone Industries-Bangalore as a BSS Engineer
Responsibilities:
• Installation & commissioning of the CDMA ZTE ZXC-10(2G) BSC, MSC and BTS.
• Configure the BTSs in BSC OMCR, Maintenance, Alarm Monitoring and Trouble Shooting.
• Acceptance test of BSCs and BTSs for AP circle to BSNL.
• Co-ordinate with BSNL to solve the customer complaints.
• As per Instructions from vendor ZTE to upgrade the software and carrier up gradations.
• Modify the Radio resource parameters according to the requirement and take the
backups.
Mar’2002 to Oct’2004: M/s Saudi Delta Company Ltd..Kingdom of Saudi Arabia as a Engineer
Responsibilities:
• Hand over and takeover the new SRS sites (TDMA) from the Installer Lucent tech Ltd…
• Configure the base and terminal station equipment via local or remote connection.
• Retrieve performance data and alarms events with monitoring systems analyze records
and initiate action to rectify deficiencies.
• Install system software up-dates if required and re-install software in case of failure.
• Carryout tests and measurements on site for routine tests or trouble shooting like
transmit/receive levels, VSWR measurement, BER test, etc…
Feb’2000 to Feb 2002: M/s Advanced Radio Masts Ltd..Hyderabad as a Assistant Engineer