Profile

Candidate ID: 1669363

Vikash arora

XXXXXXXXXXXXXXX

XXXXXXXXXX

United Arab Emirates

Career Summary

B.Tech in Electrical with approx. 20+ years of exp in Basic & detailed engg. activities incl. optimisation of design for project, vendor engg, tendering/FEED, Cost estimation,Inspection, support to commissioning, Operation & maintenance team in EPC for Oil & gas (ADNOC On/off shore, CCPP, Boiler .

Skill Set

Electrical designing

Professional Information

Total Experience : 20

Nationality : India

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

VIKAS ARORA
?: www.linkedin.com.in//vikas-arora-60b10778
?: +91 9958632827 (WhatsApp message)/ +971 509727183 (voice call)
Email ID : arora.vikas2701@gmail.com

Seeking Assignments in Designing of Electrical system with a reputed Organization

PROFESSIONAL SYNOPSIS
• B. Tech in Electrical with Approx. 20+ years of experience in Basic & detailed engineering activities inclusive optimization of design for project, Vendor Engineering, support to Tendering, Cost Estimation, Inspection (Quality), Support to Commissioning, Operation & Maintenance team in EPC contract for Oil & gas (ADNOC Onshore & Offshore), Combined cycle power plant (650MW), Critical/super-critical Boilers (Oil & Gas fired/Traveling Grate Bagasse, fired), ESP, Sugar Plant & FGD Plants.
• Noteworthy Highlight: 8+ Years of experience in Gulf Countries (Iraq, UAE)
• Performs electrical discipline work which involves the preparation of Data sheet, Specification, Material Requisition, Calculation, Adequacy Check, Schedule, Electrical load list, Design optimization, Material Take-off, Cable routing, Earthing & illumination layout, relay setting.
• Noteworthy Highlight: Deputed at GE-Sweden for “Participate in preparation and completion of engineering deliverables" for FGD- NOWA Project on work visa from 30th, Jan’17 to 15th, Apr’17.
• Noteworthy Highlight: ADNOC Onshore & Offshore experience
• Noteworthy Highlight: Familiar with ETAP. Attended Training of 7 days from ETAP
• Noteworthy Highlight: Knowledge of ADNOC Standards (AGPS/ AGES / ES) & international standards (IEC/NEMA)

PROFESSIONAL EXPERIENCE SUMMARY
Duration / Position Organization Name
Apr’2025- Cont’d / Lead Electrical Engineer China Petroleum Pipeline Engineering Co ltd (CPPE)- Abu Dhabi
Oct’22 –Apr’25 / Lead Electrical Engineer China Petroleum Engineering Co ltd (CPE)- Dubai
Feb’22 / Oct’22 / Lead Electrical Engineer Equilibrium Engineering Consultancy ltd – Abu Dhabi
June’18 to Jan’22 / Lead Electrical Engineer Kar Electrical Power Production Trading FZE- Erbil (Iraq)
June’15 to June’18 / Lead Electrical Engineer GE Power India Pvt. Ltd – Noida, India
Dec’06 to June’15 / Deputy Electrical Engineer ISGEC heavy engineering ltd- Noida, India

AREAS OF EXPERTISE

• Detailed study of Contract agreement regarding the Scope of supply, terminal Point, Exclusion, makes & the engineering required for the process. Ensure Technical/engineering Dossier is delivered that can be procured & operated safely while meeting the requirement of international standards, COMPANY standards, Design Basis & SOW. Attend internal & external kick of meeting for the projects.

• Responsible for Designing & Creating overall key line diagram of Electrical system up to 650MW Power Plant from 400/132KV GIS (Gas Insulated Switchgear) to field equipment and other design documents for the customer and providing clarification/reply for the comments receive from end user customer.

• Preparation of purchase order technical specification for electrical brought out equipment (Gas Insulated switchyard), Generator & their auxiliaries including excitation system, Generator circuit breaker, (GCB), Power transformers (GT/UAT) up to 350MVA(Oil type), IPB/SPB/NSP Bus-Duct, HT/LT Motor Control Centre (Draw out/Fixed/ Intelligent MCC), HT-LT Motors (Squirrel Cage & Slip-ring), Rotor starter (liquid/FCMA), Control panels, DC battery & battery Charger, EHV/HT /LT Power & Control Cables, HT/LT VFD & Soft-Starter, electrical heat tracing system, Cable tray, Earthing material, lighting fixtures, Local Push Button Station, Cable Lugs & Gland etc.

• Typical metering & protection diagram, Schematic (Power & Control) drawings for LV/HV Motor feeders, Power feeder & transformer feeder, Lighting system SLD., Instrument List, DCS I/O list.

• Selection & Sizing of various electrical equipment such as Transformer, DG set, LV/HV Switchboards, EHV/HT/LT Power cables considering Voltage drop, fault level, laying method etc. Switchgears selection components as per Type-2 Co-ordination, Battery and battery charger, Motors, grounding mat design calculation and lightning protection system, lighting system, VFD, Soft-starter, CT /PT sizing etc.

• Preparation of Electrical load list, Instrument list, SCMS I/O list, Electrical MV/LV Power, Control & Instrument Cable Schedule, Electrical Tie-in Schedule, Electrical interconnection diagram. Cable Drum schedule.

• Preparing reports and documents, necessary for the project. Preparing of documents for approval agencies.

• Release of enquiry (material requisition) of all electrical equipment to Vendors. Evaluating technical offers/Bids and selection of vendors. Preparation of Technical Bid evaluation of brought out items. Purchase supports for milestones of the total project. Checking and review vendor submitted post-order drawings and give them the required clearances.

• Review of Power system studies, short circuit calculation (fault level at different level of system), relay protection and coordination, load flow, motor starting analysis.

• Preparation of cable tray layout. Bus ducts arrangement layout. Layout design for switchgear and control room. Study of civil and mechanical drawings and preparation of civil assignments related to electrical equipment. Calculation of erection BOM requirement and its documentation.

• Preparation of lighting distribution scheme and layout for Indoor areas, office areas, control and switchgear room, outdoor areas, cooling tower, conveyors, coal yard, plant treatment areas, Boiler platforms and street/road lighting. Calculation of lighting BOM requirement and its documentation

• Zone/Division Classification, Type of Protection for Hazardous Areas, Hazardous list preparation, certification of Hazardous area equipment, marking of equipment name plate, Hazardous area drawings/Layout preparation.

• Preparation of proposal for Electrical Package and estimation of Bill of Materials. Site study for Renovation job and estimation of Electrical Hardware and configuration of the same.

• Detailing of electrical system interface such as Fire Alarm /Fire Protection, HVAC.

• Understand the scope and the requirement of electrical equipment in tender specification. Coordination with proposal department to highlight deviations (if any).

• Co-ordination with other departments. Interaction with Client/Consultants. Noteworthy Highlight: Visited Columbia to attend the meeting with customer

• Ensuring quality of documents/drawings and on time delivery of deliverables to the satisfaction of customer and as per quality process procedure. Deputed at GE-Sweden for “Participate in preparation and completion of engineering deliverables" for NOWA Project from 30th, Jan’17 to 15th, Apr’17.

• Conducting Inspection for various equipment such as HT/LT MCC, Bus –ducts, Transformer, Motors (Sq. cage/Slip-rings), VFD & soft-starter etc.) as per standards like IEC & IS testing at manufacturer premises. Noteworthy Highlight: Visited Shanghai-China for the Inspection of Siemens make 4.16 KV HT VFD Drive.

• Co-ordination for erection & Commissioning activities at site. Technical support to the Commissioning team, remove difficulties in day-to-day execution of project with an objective of completion of project within time schedule. Noteworthy Highlight: Visited China for the commissioning of Boiler MCC, VFD Panels & Motors at Nestle-China project.

• Good knowledge of standards and Working day-in day-out on IEEE/IS/IEC/GB/NEMA standards/ Shell DEP.






WORK EXPERIENCE
Apr’25 ~ Till Date China Petroleum Pipeline Engineering Co. Ltd, Abu Dhabi, UAE Lead Engineer
Project Handling:
• One Tie- Program works in South East. The Scope of work under the this engineering Contract is structured into ON-Pad/Off Pad / ESP Artificial wells which involves electrical scope as follows:
- Off-Pad for GLOP/WAG/WD/PWRI/NOP/WI- Solar System, Cable routing, Earthing layout
- On Pad for NOP/GLOP/WI/WD/WAG- Tie in from Existing UPS /Switchgear, Cable routing, earthing layouts, lighting scope.
- ESP Wells- Tie in from existing PSS, HV cables from 33kV OHL to PSS, lighting, cable routing & earthing layouts

• One Tie-in Program for Well Tie-in Works in Buhasa The Scope of work under the this engineering Contract is structured into ON-Pad/Off Pad / ESP Artificial wells

• EPC Work for Sahil –Phase-III Development Project: Supported vendor engineering for
- Modification in existing 33kV Switchboard for power supply to 3 Gas lift compressor motor unit transformer for VSD system.
- Supply of 11kV Switchboard for power supply to LV Switchgear through Distribution Transformer for Plant auxiliaries.
- Supply Distribution Transformers (3.15/4 MVA)
- Supply of Power Transformers (25MVA/33/11.5kV)
- Supply of new 415V/690V Switchboards.
- Supply of Cast resin 415V LV busduct between Distribution Transformer to New Switchgear
- Replacement of 1 no. 11kv, 3.4 MW main oil pump (MOL) motors
- Modification to existing 415 Emergency switchboard
- SCMS system modification to integrate new signals into existing system
- Supply of 33kV/11kV HV/MV and LV Cables
- Supply of lighting distribution board & lighting fixtures
- Mechanical Packages for GDU/GLC Chiller

Proposal handled:
• EPC for South East Gas Division
• Condensate System upgrade
• Modification at Manifold –MP21
- Preparation of deliverable list/ Technical clarification / Mahours
Oct’22 ~ Apr’25 China Petroleum Engineering Co. Ltd, Dubai UAE Lead Engineer
Project Handled:

• EPC Work for ASAB Phase-II-Stage-2 Project(Onshore)
- Modification in existing 33kV Switchboard for power supply to New Train -3 Gas lift compressor motor unit transformer for VSD system including harmonic filter.
- Modification in existing 11kV Switchboard for power supply to Gas dehydration package unit transformers(1.6MVA) and 11/0.433, 3.15MVA Distributions transformers.
- Supply of new 415V Switchboard.
- Supply of Cast resin 415V LV busduct between Distribution Transformer to 415V New Switchgear
- Replacement of 4 nos. 11kv, 4.9MW main oil pump (MOL) motors
- Modification to existing 415 Emergency switchboard
- SCMS system modification to integrate new signals into existing system
- Supply/Modification of MOV DBs, and other distribution boards as required
- Supply of 33kV/11kV and LV Cables
- Supply of lighting distribution board & lighting fixtures
- Technical Evaluation of mechanical packages and their vendor document review
- Review power system study report like load flow & short circuit analysis, motor starting study.
• EPC Work for SHAH & QUSAHWIRA Transfer line Project(Onshore)
- Modification in 11kV Switchboard to feed the power supply to HT Disposal water Pump Motor at Shah -CDS.
- Supply of HT Disposal Water Pump motor (375kW/11kV) at Shah CDS
- Modification of 415V Switchboard at Shah CDS, Qusahwira & RDS-1
- Supply of New Distribution board at ADNOC Sour Gas
- Supply of Lighting Fixtures at Shah CDS, Qusahwira & RDS-1 & 2
- Supply of HT/LT Cables
- Technical Evaluation of mechanical packages and their vendor document review

Responsibility

- Assures the detailed design is in line with the FEED package and in compliance with applicable standards and codes.
- Interfaces with other engineering discipline to properly address concerns and timely resolve design issues.
- Study of all existing drawings including available vendor prints to ascertain the requirement of modification and its impact on existing facility to ensure proper interface with other disciplines.
- Preparation of Detailed engineering deliverables such as Equipment Specifications, Datasheets, Equipment Sizing Calculations such as Switchgear, Transformer, Earthing, Lightning, HT/LT Cables etc., Equipment Lists, Load list, Tie-in Schedules, Cable Schedules, MTOs, MRs, TBEs and adequacy checks etc.
- Review of Key SLDs, Equipment SLDs, Typical metering & protection diagram, Earthing, Cable routing & illumination Layouts and Installation standards
- Vendor document review of major electrical equipment like 33/11/ 0.415kV Switchgear, LV Busduct, VSDS system, Transformer, Distribution boards, MOL Pump motor, Thyristor heater control panel, SCMS system, Electrical Bulk Material, Hazardous area related equipment.
- Technical Evaluation of mechanical packages and their vendor document review.
- Attend meeting with Client, Vendor, and Contractor, Subcontractor and Interdisciplinary.
- Review / preparation of site visit check list and site visit report.
- Preparation of CRS to explain and resolve design issues for COMPANY PMC approval.


Proposal handled:
• SAHIL Phase-3 Development- Preparation of Technical clarification list, deliverable list & manhours
Feb’22 ~ Oct’22 Equilibrium Engineering Consultancy, Abu Dhabi UAE Lead Engineer
Equilibrium Engineering Consultancy (EEC) provides technical and strategic solution to its customer for various major & minor projects across a wide engineering spectrum, including Hydrocarbon Exploration & production, Reservoir Engineering, Oil & Gas Processing, Refining Power Generation & Distribution. EEC provide a comprehensive range of service including corporate governance, Pre-Feed and FEED Studies across all engineering activities.
Responsibility

- Identify Brownfield project scope for electrical engineering and procurement activities.
- Managing & leading team of engineers & designers, assigning task to team members.
- Executing, monitoring & controlling the engineering deliverable activities and schedule as per project management plan and delivery schedule.
- Study of all existing drawings including available vendor prints to ascertain the requirement of modification and its impact on existing facility to ensure proper interface with other disciplines.
- Review / preparation of related document like Electrical Design Basis, Load Schedule,
- Protection & interlocking philosophy, Electrical Equipment Schedule, Equipment Sizing calculation (EDG, Cables, Switchgear etc.) Electrical bulk item MTO, Key SLD, Equipment SLDs & Installation standards.
- Interdisciplinary and client co-ordination to resolve technical queries.
- Review power system study report like load flow & short circuit analysis, motor starting study.
- Controlling the manhours and cost within the allocated budget.
June’18 ~ Jan’22 KAR Electrical Power Production Trading FZE Company , IRAQ Lead Engineer

KEPPT is established private company headquartered in Ras Al-Khaima, UAE, has rich experience in Power, Gas & the Refinery sectors. The Company’s activities include trading in power generation, transmission and distribution, including solar energy system.
Specific Project worked on
- SHATT AL- BASRA Combined Cycle 650MW Power Plant Project
- River Water Intake

Responsibility

- Review of Contract documents and preparation of technical queries.
- Review of overall key line diagram of Electrical system up to 650MW Power Plant from 400/132KV GIS (Gas Insulated Switchgear) to field equipment
- The Scope of Project involves 400kV GIS expansion by addition of 3 Power bays, Steam Turbine Generator (170MVA/15.75kV), Generator Synchronizing system, Three Winding Generator Step up Transformer (GSUT- 350MVA, 400kV / 15.75-15.75kV) / 25MVA Unit Auxiliary Transformer (UAT-15.75kV-7.2kV)/ LV Dry type Transformer, 400kV Cable and cable sealing end, Generator Circuit Breaker, Isolated Phase duct, MV/LV Switchgear, Battery & Battery Chargers, DC System, Neutral Grounding resistor (NGR), Emergency Diesel Generator, Non Segregated Phase duct, UPS, HT/LT Motors, Lighting, Lightning Protection and grounding control etc.
- Review of Data sheet/ Specification/ Material Requisition /Equipment Sizing calculation/ Technical evaluation of above electrical equipment.
- Review of Key SLD/ Equipment SLD, metering & protection diagram etc., Layout for Illumination, Cable routing & Earthing.
- Review power system study report like load flow & short circuit analysis, motor starting study
June’15 ~ June’18 GE Power India Pvt ltd (Formerly known as Alstom India) Lead Engineer
Alstom/GE in India has full capabilities in Engineering, manufacturing, project management and Supply of Power Generation equipment and solutions for Renewable and Thermal Power.

Specific Project worked on
- Neyveli , 2 x 500 MW Lignite Fired Power Plant
- Mae-Moh Power Plant-Thailand
- Worked on various supercritical Boiler projects (660 & 800 MW) under execution in India, Collaborating with technology lead centers (Windsor & Stuttgart) for various global projects

Dec’06 ~ June’15 ISGEC Heavy Engineering Pvt ltd Alstom India) Lead Engineer
The Growth Path:
Dec’06-May’07-Graduate Trainee.
May’07-May’09- Electrical Design Engineer
May’09-May’11-Sr. Electrical Design Engineer.
May’11-May’14- Asst. Manager
May’14-June’15- Deputy Manager
As Deputy Manager- Electrical Design
ISGEC is the Heavy Engineering wing of a Rs. 1700 Crores multi-product, public Limited Company with interests in Pressure vessels, Heat Exchangers, Hydraulic & Mechanical Presses, Steel & Alloy Steel Casting and turnkey project services for Sugar, Power Plant, EPC, Industrial & Pulverized coal Boilers.

The company has Head Quartered at Noida with manufacturing facilities situated at Yamuna Nagar (Haryana) & Muzaffarnagar (UP), India and Marketing Office in Noida, Pune & Chennai in India; Dusseldorf in Germany and Pittsburg in the USA. U.P Steels is a foundry of the ISGEC Group, manufacturing Stainless Steel & Alloy Steel Casting for the Power Sector and Valve & Pump Industries. It has a turnover exceeding Rs. 100 crores.

Specific Project working on

- HPCL Mittal Energy Ltd-Bathinda (2 x 300TPH CFBC Boiler)-Consultant: Tata Consultant Engg (TCE), Noida
- Ingenio La Gloria, -Mexico (1 x 200 TPH Pin Hole Grate Boiler)
- DEIFY INFRSTRUCTURES PVT LTD (Service 2 x 52.4 TPH WHRB BOILERS): Consultant-Synder-Bangalore
- Gujarat Fluor-chemicals Limited (1x90TPH, Single Drum, Water tube top supported AFBC Boiler)
- Areva Renewable Energies ltd (1 x 50 TPH TG Boiler)-Philippines
- Kampangpetch Bio Energy Ltd-Thailand ((1x 150 TPH, Travelling Grate Bagasse fired Boiler) and many more...


Project Executed successfully

- 1x16.115 MW Co-Generation Power Plant-Philippines
- M/s Sukhothai bio–Energy Ltd-Thailand (1x 150 TPH, Travelling Grate Bagasse fired Boiler)
- M/s El Alcaravan Ltd (Colombia). (1 x 180 TPH Traveling Grate Boiler)
- Sancarlos Bio Energy Ltd (1x45 TPH TG Boiler)-Philippines and many more….
Jun’06 ~ Dec’06 Triveni Engineering & industries ltd - Sabitgarh Officer Trainee

Triveni is one of leading producers of sugar in India, with seven manufacturing units at Khatauli, Deoband, Sabitgarh (all in west U.P), Chandanpur, Raninagal, Narainpur & Ramkola. The Sabitgarh unit had been established in year 2005 with installed capacity 4500 TCD. I had been assigned for electrical designing, repairing & maintenance of the equipment installed in the plant.


COMPUTER SKILLS
• Office Productivity: Word, Excel, Power Point and Internet Tools
• Working experience in AutoCAD software package for Detailed Engineering
• Working knowledge of SAP
• Working knowledge of COMOS PT for PID development and Electrical outputs
• Working knowledge of Wrench

SUMMER INTERNSHIP PRACTICAL EXPOSURE
• June-July 2005: DCM fertilizer & Chemical Ltd, Kota 40 days
• May-June2004: 220KV substation, Sikandra, Agra, 30days
• May-June 2003: Marson’s Transformer company, Agra, 30 days on “Construction of Transformer”.

SIGNIFICANT ACHIEVEMENTS
• 12 Days NCC camp at Agra
• NCC ‘B’ Certificate (Army wing)
• 10 Days NCC Camp at Dayalbagh
• H2S Awareness & Escape (Level 2) Certificate from ADNOC Academy
• Dialux-4.13
• Power System Analysis Training certificate from ETAP

ACADEMIC CREDENTIALS
2002-2006 Faculty of Engineering Dayalbagh Educational Institute
• B. Sc ENGG (Degree) 70% in Electrical Engineering
• Attended various professional courses

PERSONEL DETAILS
Father’s Name : Mr. Vinod Kumar Arora
Permanent Address: A-2 Sarla Bagh Extension Dayalbagh, Agra
Hobbies : Listening Music, reading, playing & watching Cricket, Driving
Strength : Positive Attitude, Flexibility in work under Stress, Innovative and problem solving
Language : Hindi, English, Punjabi
Sex : Male
Passport No. : W0789270
Passport validity : 25/10/2032
Date of Birth : 27/01/1983


Present Salary: ----
Expected salary:
Date VIKAS ARORA