Name: Sasikanth Vaddadi
Title: Project Engineer -E&I
Mobile: +91 7569338491
+91 9052128329
+91 9490234333
Email: sasikanth.vaddadi@gmail.com
sasikanth7@rediffmail.co.in
Educational Qualifications:
Diploma in Electrical Engineering – 1986
B.Tech in Electrical Engineering – 2006
Detailed Experiences
Consolidate Contractor Company (CCC) – 11 years 8 months
Responsibilities:
• Manage and support the field operations on projects, report to the Project Manager.
• Planning and estimation of manpower, materials, equipment and other necessary information required for site the project.
• Preparation scope of work, quantity takeoffs as required, review project specification and scope of work and identify anomalies. Prepare & distribute submittals
• Manage project specific materials and equipment purchases and maintaining vendor relations, ordering and tracking deliveries, and receiving and processing invoices.
• Support field in expedite schedule, completion of work, inspections, materials status.
• Coordinate with client regarding project schedules, report, technical requirements etc.
• Prepare & review JSA for permit to work system.
• Monitor the HSE performance against contractor HSE plan and ensure that all work site control and operate in safe manner.
• Identify, plan and implement safety training programs, for technical staff as and when require in coordination with Safety Manager and Project Manager.
• Conduct safety tool box talk with all staff & work force, maintain records.
• Conduct weekly meetings with contractor, and field staff to review site progress, site issues etc.
Attend client’s review meetings, coordinate with design team and others.
• Preparation monthly / weekly/ daily progress reports and re-view with project management team.
Setup team and conduct punch list walk-through as needed; compile the punch list and forward to Project manager and concern supervisor.
• Review and Monitor of contractors work progress. Preparation of commissioning test packs and co-ordinate with client during commissioning.
• Provide required closeout information to the client at the end of the project (record drawings, O&M, warranties etc.)
Area of Responsibilities:
• Establish good work relationship with other team members.
• Foster positive communications and relationships with team members, management, vendors and clients.
• Adhere to company policies and procedures.
• Actively participate in meetings as and when required.
Areas worked in various projects:
Oil & Gas Mid – Stream, LNG Utilities, Storage tanks facilities, Liquid Sulphur & Refrigerant Storage (live plant) and LNG loading berth facilities (JETTY) Area. On & Off-Shore Marine & Infrastructure facilities, Main Control & ITR Buildings, Slug Catcher Facilities.
E&I Systems worked in various projects:
LV & HV Power distribution, BMS, CCTV, HVAC, and Building F&G alarm systems, PAGA systems, Plant Illumination, Cathodic Protection system, Heavy electrical equipment installation, and Power, Control, Instrument and FO Cable installations, Field instruments, PLC installations etc.
Projects worked in CCC:
Maj Noon FCP Gas Project – Slug Catcher Facilities - Basra - Iraq
Client: SHALL Iraq Petroleum Development (SIPD)
Consultant: Chiyoda-CCC Engineering ltd (CCEL)
Period: From 26th August 2014 to 11th Dec 2018
Position: Project Engineer – E & I
Area worked: Mid-Stream – Oil & Gas
PNG LNG Project (Onshore & Off shore facilities) - Papua New Guinea.
Client: Exxon Mobile (ESSO High Lands Limited)
Consultant: Chiyoda – JGC Joint Venture
Period: 28th May 2012 to 28th Nov 2013
Position: Section Engineer - Electrical
Ras Laffan Port Expansion Project – Qatar (On & Off-shore marine & Infrastructure Facilities)
Client: Qatar Petroleum (QP)
Period: 14th March 2009 to 28th May 2012
Position: Section Engineer - Electrical
QGXII – LNG Onshore Facilities Project - Qatar
Main Client: Qatar Gas (QG)
Consultant: Chiyoda & Technip
Period: 21st April 2007 to 13th March 2009
Position: Site Engineer - E & I
Past Experience (21 years)
Nature of work & responsibilities:
• Worked in field engineering design for Power & Control cable routing, Plant illumination, Fire & Alarm Heavy electrical equipment installation, Power distribution system.
• Worked in EPC projects, supervision and construction and commissioning activities in Power plants, EHV Sub-Stations, OHL transmission lines, Water treatment plants, Cooling Towers, Material Handling system.
• Involved in preventive electrical maintenance work as per schedules, Preparing of method statements for various electrical works and emergency shut-down works.
• Involved in erection and commission of ABB-DCS & PLC systems.
Alstom Projects India Ltd – Baroda
Project: Merowe Hydro Power Plant - Sudan
Period: Sep 2006 – April 2007
Position: Electrical Engineer– BOP
LTEM LLC – Division of Construction (Oil & Gas) – Muscat
Engineering & Maintenance Contract (EMC) - North Fahud
Main Client: Petrol Development of Omen– North Fahud
Consultant: Worley parsons
Period: Sep 2005 – August 2006
Position: Area Engineer – E&I
Tata Projects Limited – India
Power Generation, Transmission & Distribution)
Period: Feb 1999 – August 2005.
Position: Asst. Electrical Engineer (Construction)
Projects worked in Tata:
Power System Improvement Projects – India.
Main Client: State Electricity Boards (MSEB& APSEB)
Consultant: Tata Consulting Engineers (TCE)
2 X 77 MW Thermal Power Plant - Rajasthan - India
Main Client: Hindustan Zinc Limited – (HZL)
Main contractor: Bharat Heavy Electrical Limited (BHEL)
Consultant: Tata consulting engineers (TCE)
Surya Electrical Engineering & Consultants-India
Main Client: State Electricity Board.
Period: Sep 1997 – Feb 1999
Position: Site Engineer
VBC Ferro Alloys Ltd – Hyderabad
Period: Feb 1996 – August 1997
Position: Electrical Engineer (Operation & Maintenance)
Ferro Alloys Corporation Ltd:
Period: Dec 1986-Feb 1996
Position: Junior Manager (Operation & Maintenance)
Specialization Field:
• Switching Stations installations of EHV SS Indoor & Out door
• Heavy electrical equipment erection & Pre-commissioning and Commissioning works.
• Transmission Line up to including 132kv
• Erections of DC Drive & Controls
• Erection & Commission of FCC, MCC, and EOT Crane Controls
• Systems with radio remote control.
• Erection of PLC & DCS system.
• Power plant BOP Installations
• 132kv, 33kv, 11kv cable installations
• HVAC, PAGA systems
• Fire & Gas system for field application
• Fire & Alarm system for Building application
Personal Profile:
Age & Date of Birth: 12/02/1965
Family Status: Married
Children: One
Nationality: Indian
Passport Number: S 8833159
Place of Issue: Hyderabad, India
Date of Issue: 24/12/2018
Date of Expiry: 23/12/2028
Declaration
I hereby declare that the above-mentioned particulars are true and correct to best of my knowledge and belief.
(Sd/)
(Sasikanth Vaddadi)