PROFILE SUMMARY
• Results-oriented professional with a proven track record of delivering innovative engineering solutions and successful project outcomes
• Accomplishment-driven professional with an extensive background in Mechanical Engineering, Production, Piping, and Project Control, spanning diverse sectors
• Formerly held the role of Workshop Supervisor at Ryboa Haima Trading Co. LLC, Muscat, Oman, overseeing maintenance of a vehicle fleet and leading a team of 20+ maintenance personnel
• Showcased proficiencies in troubleshooting, analytical thinking, test specification development, design and drafting, production, quality control, and site commissioning
• Attained an impressive 99% reduction in defect rate as a Production Engineer at ATC GUINEA, Conakry, Guinea, employing process capability analysis and weekly defect reports
• Highly skilled in utilizing advanced design software like AutoCAD, SolidWorks, and Advance Steel, contributing to the precision and success of multiple projects
• Orchestrated the production of over 200 oil and water storage tanks, underscoring adept project management and organizational capabilities
• Displayed exceptional project management acumen, consistently delivering projects on time and within budget, while leading teams and implementing streamlined methodologies
WORK EXPERIENCE
Project Engineer Aug2023-Present
MIMO Contracting Dubai
Successfully managed the operation of over structural and steel products, Ship Building maintenances while leading a team of 60 personnel, implementing process improvements, and reducing defect rates by 99%, showcasing strong leadership and technical expertise
Key Result Areas:
• Proficient in overseeing and managing ship construction projects from inception to completion, ensuring adherence to safety regulations, budget constraints, and project timelines.
• Experienced in conducting feasibility studies, risk assessments, and cost-benefit analyses for shipbuilding projects to ensure efficient resource allocation and project viability.
• Expertise in utilizing project management software such as Primavera P6 and Microsoft Project to track project progress, allocate resources, and mitigate potential risks.
• Proficient in conducting quality assurance inspections and implementing corrective actions to maintain high-quality standards throughout the shipbuilding process.
• Strong communication and interpersonal skills, with a proven track record of effectively coordinating with stakeholders, subcontractors, and vendors to resolve issues and achieve project objectives.
• Experienced in managing project budgets, controlling costs, and identifying opportunities for cost savings without compromising on project quality or safety.
• Skilled in interpreting technical drawings, specifications, and engineering plans to provide guidance and support to project teams during construction, installation, and commissioning phases.
• Proactive problem solver with a focus on continuous improvement, innovation, and implementing best practices to optimize project performance and enhance overall project outcomes.
Workshop Supervisor Jan2022-Jul2023
Ryboa Haima Trading Co. LLC, Muscat, Oman
Managing vehicle fleet maintenance and supervised a team of over 20 personnel, resulting in increased efficiency and reduced downtime, while ensuring compliance with safety regulations and maintaining strong supplier relationships.
Key Result Areas:
• Generated detailed maintenance documentation and scheduled daily maintenance for a fleet of vehicles, resulting in a 80% reduction in unscheduled downtime
• Led training sessions that improved maintenance staff efficiency, leading to a 95% decrease in maintenance completion time
• Introduced innovative project strategies that reduced project implementation time by 70%, resulting in quicker project turnovers
• Maintained detailed records of over 200 vehicle inspections, contributing to a 99% accuracy rate in maintenance documentation
• Achieved 95% adherence to federal, state, and local safety regulations, ensuring a safe work environment and zero safety violations
• Applied process analysis techniques, reducing defects by 95% through targeted process improvements
• Implemented new work methods that increased team productivity by 95%, achieving higher maintenance output with the same resources
• Produced over 200 detailed vehicle inspection reports using MS Word and Excel, providing actionable insights for maintenance optimization
• Successfully managed procurement of materials, resulting in a 95% reduction in material acquisition time and improved project timelines
• Evaluated supplier performance, leading to a 90% cost reduction through strategic supplier negotiations and selection
• Collaborated with drivers and supervisors to optimize maintenance schedules, leading to a 95% increase in vehicle availability during peak operational hours
Production Engineer Jun2017-May2021
ATC GUINEA, Conakry, Guinea
Successfully managed the production of over 100 structural, storage, and steel products, while leading a team of 60 personnel, implementing process improvements, and reducing defect rates by 99%, showcasing strong leadership and technical expertise
Key Result Areas:
• Identified, analyzed, and implemented process improvements to enhance production efficiency, reduce waste, and optimize resource utilization, resulting in increased output and cost savings
• Developed and implemented quality control measures to ensure products meet or exceed industry standards and customer expectations
• Planned and managed production schedules, ensuring smooth operations and timely delivery of products
• Implemented and enforced safety protocols and practices to create a secure work environment for all personnel
• Created engineering documentation for manufacturing processes, equipment specifications, and change notices
• Assisted drafters in developing structural design of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software
• Worked as a Quality Control Engineer, driving continuous improvement in manufacturing tasks by effectively communicating diagnostic findings to elicit production changes and encourage iteration
• Used statistical process control (SPC) methods to detect and analyze manufacturing process data, applying process changes as needed
• Determined root cause of deviations and non-conforming results and implemented appropriate corrective and preventive actions throughout product development process
• Worked as a Site Engineer, analyzed survey reports, maps, blueprints, and other topographical and geologic data to plan infrastructure and construction projects
• Supervised quality control and health and safety matters for construction teams
• Implemented on-site sustainable waste disposal and recycling programs to reduce project environmental impact
• Established and implemented construction schedules, methods, equipment, and labor requirements using Gantt charts and MS Project
• Recorded daily events and activities in site diary to evaluate process and improve productivity
Highlights:
• Used AutoCAD and SolidWorks to examine product scopes and plan for adaptations in production methods
• Implemented Method Study and Time Study process improvements to increase yields, improve quality, and reduce downtime
• Collaborated with a 15-member team to produce and install structural building components for Hospital Donka-Guinea, working under the supervision of PICCINI Guinea
• Contributed to projects with esteemed clients such as Vivo Energy Guinea, CBG/Fluor, GAC, Topaz Multi Industries, Total Guinea, IDFCA, DTP Mining Guinea, Afcons Guinea, and PICCINI Group
PERSONAL DETAILS
• Date of Birth: 1st August 1995
• Languages Known: English, Hindi and French
• Address: Maharajganj, 273303, Uttar Pradesh, India
• Nationality: Indian
• Marital Status: Unmarried
• Passport Details: R0482133 (Ex. Date: 16 May 2027)