Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

ABDELAZEZ OMAR

Candidate ID: 2081627

Career Summary

Diploma with 15 years experience in Oil / Gas / Petroleum functional area

Skill Set

All work and I have - (Kuwait driving heavy license).

Professional Information

Total Experience : 15

Nationality : Egypt

Qualification Level : Higher Secondary School & Equivalent

Job Function : Oil / Gas / Petroleum

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

Personal Data

Name : Abdelaziz Omar Abdelaziz Ismail.
Date of birth :10-07-1992.
Nationality: Egyptian. Designation: piping foreman How to contact:
Mail:abdulazizomar.107@gmail.com
Tel : +965 699 180 49
+2 01004177903
Education

-Industrial high school -Mechanical Division- Forming and welding of metals industry at 2010.

- Industrial Technical Institute diploma-Mechanical Division at 2013.

Technical Experience
Supervisory responsibilities and skill set.

? Masterful Pipe Foreman with more than (10) years of oil and gas pipes as well as firefighting, chilled water, plumbing, petrol stations (GRP) Pipes (and I can do this with my hands) with commendable leadership skills.
? Demonstrated capacity to effectively lead and manage crew members' daily activities and production.
? Excellent team-building, communication and problem-solving skills and record of quickly adjusting to changing circumstances while promoting continuous safe Work environment.
? Ability to apply common sense understanding to carry out instructions furnished in written, oral, or diagram form.
? Ability to resolve problems involving several concrete variables in standardized situations.
? overseeing and assist craftsmen with the interpretation of isometric drawing.
? Ability to calculate quantities of materials.

? Manages subordinate craft workers. Is responsible for the overall direction, coordination, and evaluation of your crew.

? Carries out supervisory responsibilities in accordance with the organization's policies and applicable laws.

? Responsibilities include training employees; planning, assigning, and directing work; appraising performance; addressing complaints and resolving problems.

? Studies specifications to plan procedures for construction the project schedule and staffing requirements for each phase of construction.

? Assembles crew members at the start of project.

? Works with Superintendent to order tools and materials to be delivered at specified times to conform to work schedules.

? Confers with supervisory personnel to receive directions for crew and subcontractors engaged in planning and executing work procedures, interpreting specifications, and coordinating various phases of construction to prevent delays.

? Confers with workforce personnel and subcontractors and suppliers of tools and materials to resolve construction problems and improve construction methods.

? Inspects work in progress to ensure that workmanship conforms to specifications and the adherence to construction schedules.

? Understand and interpret specifications on prints as well as the ability to correlate them with in field survey staking.

? Comprehensive understanding of the plans and specifications for their item of work.

? Understanding and knowledge of proper equipment utilization and daily maintenance requirements.

? Able to communicate effectively with crew, Supervisors, and Owners.

? Ability to effectively utilize a tablet system for time card entry and plan document access.

? Responsible for submitting daily and progress reports.





Kuwait:
FEB 2020 until MAR 2022


PROJECT TITLE:
GC-32 – NEW GATHERING CENTRE FOR SEK CONTRACT NO :- 17051820
Piping Foreman


NOV 2016 until 2019

PROJECT TITLE:
REPLACEMENT OF DAMAGED SPARE FLARES OF COANDA HP FLARE AND MF/X LP FLARE. CONTRACT NO:- 13050598
Mechanical Foreman.

Work duties:
• Stringing and fit-up of 110" CS pipes (FLARE STACK).
• Fabrication as per isometric drawing and line specification and specification break if any.
• Pipe support, wear pad, directional anchor supports (line stop) and guide supports location, leveling and installation.
• Installation all types of valves.

• Installation of weldolet,sockolet,swages,WNRF and SWRF flanges with CNAF ,SS spiral wound and insulation kits.
• Hydro test, pneumatic test and Tie-ins.
• Alignment and installation of Flare Stack ( 50 Meters high ) with ladders, platforms and davit assembly.
• Installation of HP Flare tip
• Installation of AWL system.
• Fabrication of ½" and 1"fuel gas stainless steel BE pipes and pilots installation.
• Fabrication of ½" and 1½" instrument air stainless steel PE pipes.
• Fabrication of liquid carry over pot and drain pipes to sock away pit.
• Fabrication of trunnion support for 24" 90° elbow.
• Installation of LP ground flare including LRGO burners and pilots.

Mar 2014 until Aug 2016

Projects: KNPCLM – 0047
- Construction & Maintenance of 4 New Petrol Filling Statoin at Umm Al-Aish, Jahra Al-Waha, Ardiya – Jaber Stadium and Al-Siddiq (South Surra).
&LM-CSPD- 4017
STANDBY CONTRACT FOR DIFFERENT CONSTRUCTION AND MODIFICATION WORKS AT LM DEPT. FACILITIES At Sabhan Depot
and PFS At Shuaikh.

Mechanical foreman

Work duties:
• Laying, leveling and fixing fiberglass fuel tanks inside RC enclosure.
• Pneumatic test of fiberglass fuel tanks and backfilling after test.
• Installation of new FRP filling, feeding pipes, and Vapor recovery fiberglass pipes with leveling.

• Installation of new Vapor recovery fiberglass pipes and how to connecting to exist vent pipes of existing fiberglass fuel tanks.
• Hydro test and pneumatic test of fiberglass pipes.
• Installation with leveling and water testing of HDPE pipes for water/oil spill lines.
• Installation of air and water towers for PFS with required rerouting of pipes.
• Installation of dispenser sumps with emergency shutoff valves.
• Installation of fuel dispensers with fuel hoses, nozzles, breakaways and valence kits.
• Installation of firefighting pumps and related piping, valves, check valves, gages, pressure switches and flexible joints.
• Installation of irrigation pumps and related piping network with sprayers and control valves.
• Installation of oil separators and related piping network.
• Installation of PE water tanks and copper piping network and tanker filling points.
• Installation of water supply pipes and drainage pipes for PFS office buildings.
• Installation of rainwater pipes for main canopies and office buildings.
• Installation of drainage submersible pumps and related pipes.


Egypt :

- 2012 to 2013 as plumber and pipes fitter and fabricator at The United Company for Estate Investment, Agriculture & Tourism Development S.A.E.
- 2011 to 2012 as a mechanical installation Technician at Lafarge Cement.
- 2009 to 2011 as a mechanical installation Technician at Fayed for Engineering & Contracting S.A.E.
- 2008 to 2009 as a pumps maintenance Technician at National communication institute.

- 2005 to 2008 as a plumber, fire fighting Technician and welder at private work.



Attachments


- Graduation certificates.
- Experiences certificates.
- Kuwait driving heavy license.