Career Summary

Structural Engineer with 13 years of professional Experience (out of which 11 years in GCC) in the Execution & Supervision of construction activities. Constructed & Supervision different systems of Soil retaining structures, Foundations, Slabs, Waterproofing, and Formworks.

Skill Set

Multi tasks Engineer, Undertake technical submittals review, Time Management, Documentation Skills, Client satisfaction, QCD - Passive part cognizance, and DLP cognizance.

Professional Information

Total Experience : 13

Nationality : Egypt

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

Hany Ibraheem1984
hany_fraag@yahoo.com - 33432202
BSc, PMI-PMP, ISO 9001:2015, and MMUP-A
SUMMARY:
Structural Engineer with 13 years of professional Experience (out of which 11 years in GCC) in the Execution & Supervision of construction activities. Constructed & Supervision different systems of Soil retaining structures, Foundations, Slabs, Waterproofing, and Formworks. Knowledgeable in local & international standards, and construction codes.
Worked Civil QA/QC Engineer which gave me the advantage to earn experience in Architectural Exterior & Interior finishes in coordination with other construction disciplines (i.e.: Electrical, Mechanical, and Landscape).
Registered by the Ministry of Municipality and Urban Development in the State of Qatar “Grade-A”, ISO 9001:2015 Auditor Certified, and PMP Certified.

PROFESIONAL EXPERIENCE:
Kernel Engineering Consultants, Qatar
Project: Abraj Quartier {4 Towers (B+G+42F) + 4 Townhouses (B+G+7F) + 25 Standard Villas + 5 VIP Villas} with total BUA 2,436,868 m2 & total of 1,488 units, and total cost of 2.5 billion Qatari Riyals – Pearl Qatar
Sr. QA/QC Civil Engineer July 2019 – Present (3 years 6 months)
Tasks:
1. Implement and maintain the approved Project Quality Plan (PQP) and the related procedures, and evaluate the on-site effectiveness.
2. Arrange in coordination with the Contractor the Inspections plan as per the site requirements.
3. Review the technical quality submission (e.g.: Method Statements, Checklists, ITPs, … and etc.).
4. Responsible to maintain well all Quality related documents/records.
5. Conduct the regular site visit to check the quality of works on site against the approved Project Documents (e.g.: Material Submittals, Shop Drawings, Method Statements, …, and etc.)
6. Conduct on-site Audit of Contractor as per scheduled on the PQP, report the Audit findings, and follow up the corrective actions on site.
7. Conduct the off-site visits to check the technical capabilities of the Subcontractors/Vendors prior to selection/finalizing prequalification and submit the report the relevant in charge discipline.
8. Witness the on-site/Lap tests and prepare the required quality report.
9. Coordinate the site inspections with the other disciplines to achieve the maximum quality and avoid the discrepancies on site.
10. Review the Corrective Action Requests (CARs) to close the Non-Conformance Reports (NCRs) and Field Observation Reports (FORs).
11. Review the Contractors Monthly report and prepare & issue the Quality monthly report.
12. Prepare the weekly quality concern points.
13. Attend the Progress/Quality Meetings, and discuss the quality concern points & the relevant quality issue.
14. Prepare & maintain the proper documentation of the Quality and Project documents and make sure they are available in the right place.
15. Reviewing quality related trends and proposing the possible improvement measures.
16. Conduct the Workshops and Meetings as required.
17. Ensure that the work is going in a safe manner, complying with Health, Safety, and Environmental HSE policies.
18. Undertake technical submittals reviewing (e.g., Pre-Qualifications, Material Submittals, Shop Drawings, Design & Calculations, Operation & Maintenance Manuals, As-Builts, … etc.) to ensure that the execution is in accordance with the Project Documents.
19. Coordinate with all departments in charge as reviewing the technical submittals to avoid the discrepancies between the different aspects of the Project.
20. Prepare the Lessons learned file to avoid the recurrence of mistakes.
21.
QA/QC Civil Engineer June 2017 – June 2019 (2 years 1 month)
Tasks:
1. Prepare written records of all works at site.
2. Maintain a tracking register for all quality issues, and work with the Contactor to solve out the outlasting issues.
3. Inspect the works as requested by the contractor and comment as necessary.
4. Supervision of the works to ensure that the installations are implemented in line with the Contract documents.
5. Witness testing procedures as requested in/out site.
6. Co-ordination of site works with other trades (e.g., MEP clearance, … etc.).
7. Monitoring Day work site activities, and issue the necessary observation reports (i.e., FORs and NCRs).

Medad Engineering Consultants, Qatar January 2015 – May 2017 (2 years 4 months)
Project: 4 Buildings (B+G+4F) with total BUA 16,000 m2 & total cost of 45 million Qatari Riyals, and 1 Tower (2B+G+22F) with total BUA 29,200 m2 & total cost of 117 million Qatar Riyals – Foxhill & Lusail
Structural Inspector
Tasks:
1. Undertake the site inspections and prepare the quality reports.
2. Coordinate with the Senior Structural Engineer and other Engineers to provide support and guidance as required on temporary and permanent works.
3. Maintain tracking register for all inspections, both on-site and off-site.
4. Other tasks as instructed by the Senior Engineer.
5. Adopt a proactive approach to site safety at all times by monitoring and reporting potential unsafe work activities.

Al – Madar Holding Group, Qatar June 2013 – December 2014 (1 year 6 months)
Project: Ford Showroom Building @ the Airport Street
Site Engineer
Tasks:
1. Develop and maintain a proper execution plan by,
a. Determine the scope of work and the make sure that the approved relevant documents are available (e.g.: Shop Drawings, Materials, Samples, Method Statements, ITPs, … and etc.)
b. Setup a weekly lookahead schedule in line with the approved baseline program.
c. Determine the required resources (i.e.: manpower, materials, machines, and tools) as per scheduled.
d. Determine the required on-site facilities (i.e.: power supply, water supply, labors rest area, temporary store, wastes allocation point, … and etc.)
e. Setup the required coordination plan with the other parties and disciplines (e.g.: MEP team, quality team, Sub-contractors, …. and etc.)
f. Determine the required formats and documents which required to be issued (e.g.: daily report, progress report, procurement status report, … and etc.)
2. Allocation of manpower and resources on-site as per settled plan.
3. Follow up the on-site progress and solve out all issues to eliminate the non-conformity and defects.
4. Perform and maintain the proper coordination with the other disciplines & parties on-site, and take the necessary action to ensure the smooth progress & avoid the discrepancies.
5. Prepare and issue the required reports (e.g.: daily report, progress report, procurement status report, …)
6. Attending the Project progress/Quality meetings, and working on breaking the outstanding issues.
7. Conduct the workshops with the sub-contractors/vendors to achieve and follow up the on-site progress.
8. Generate and maintain a solid records and documentation related to the progress on-site.
9. Ensure the implementation of good housekeeping practices, and ensure to adherence to the safety rules of the Company with zero tolerance to the unsafe work practices.
10. Develop a good relationship with the Consultants and the other Project Stakeholders.

Al – Ali Construction & Development, UAE April 2010 – December 2012 (2 years 8 months)
Project: 7 Private Villas (G+2F) with total BUA 35,000 m2 & total cost of 10.5 million dirhams, and the foundations of the heat recovery tower inwards the Gulf Cement Factory – Ras Al-Khaimah.
Site Engineer
Tasks:
1. Responsible to prepare the look ahead plan in accordance with the Project Program Baseline.
2. Responsible to determine the required resources (i.e.: Manpower, Machines, and Materials) to achieve the plan.
3. Manage & allocate the resources on-site and supervise the execution of the construction activities.
4. Prepare and report the daily progress report to the top management.
5. Maintain the proper coordination with the other discipline in the Project to achieve the proper quality and avoid the discrepancies.
6. Ensure to adherence to the safety rules of the Company with zero tolerance to the unsafe work practices.

El – Tahhan Piling and Construction, Egypt September 2008 – March 2010 (1 year 6 months)
Project: CFA piles for 1 Building (G+15F), and CFA piles for 1 School – Alexandria
Site Engineer
Tasks:
1. Generate and maintain records related to the achieved daily progress.
2. Coordinate with design and supervision consultant to deal with unexpected issues.
3. Coordinate with the overseeing maintenance team to report daily about the equipment condition.

SKILLS:
• Undertake Technical Submittals Review.
• Site audits (Structural and Architectural).
• Time Management.
• Local Codes Cognizance (QCS, QCD, and QTM).
• International Codes Cognizance (ACI, ASTM, ANSI, NFPA, PTI, PCI, BS, ... and etc.)
• Strong Documentation Skills.
• Client Satisfaction.
• QCDD Passive Part Cognizance.
• Close-out Process Cognizance.
• DLP Cognizance.
• Quick Learner and Team Player.
• AutoCAD 2D Profession.
• MS Office Profession.
• ORACLE Aconex System Cognizance.

EDUCATION:
BSc Civil Engineering – Alexandria University, Egypt (2008, Grade: 69.40%)

PROFFISIOAL CERTIFICATES:
• Project Management Professional, PMP – May 2016
Project Management Institute, PMI – USA
• Quality Management System, ISO 9001:2015 – November 2016
Esenek, IRCA – Turkey

AFFILIATIONS:
• Urban Planning and Development Authority (UPDA), 2015
Grade-A – Qatar
• Member of Society of Engineers (SOE), 2010
Structural – UAE
• Member of Egyptian Syndicate of Engineers (EES), 2008
Civil – Egypt

PERSONAL DETAILS:
• Nationality: Egyptian.
• D.O.B: 3rd August 1984.
• Visa Types: Employment Visa – Transferable.
• Marital Status: Married.
• Driving License: Available.

REFERENCES:
• Mr. Haitham Nour, Former Managing Director – Kernel, h.nour@alshareef.com.qa, +974 7078 9366
• Mr. Chandan Kamat, Client Representative – Alshareef, chandan@alshareef.com.qa, +974 6646 3985
• Mr. Paul Apps, Project Director, Email: pauldapps@hotmail.com, Mobile: +974 5576 8552
• Mr. Mohamed Nayef, Project Director – Kernel, mdorra@kernel-ec.com, +974 555 39970
• Mr. Nader El-Kholy, Project Manager – Kernel, n.elkholy@kernel-ec.com, +974 5517 4619
• Mr. Ahmed Ramadan, Project Manager – Kernel, a.ramadan@kernel-ec.com, +974 7043 3958