In my most recent role at China Civil Engineering Construction Corporation and Hyundai Engineering & Construction Ltd, I prepared and implemented the project inspection strategy to cover all project phases, and ensured the quality control of the work in accordance with contract requirements. I also reviewed and approved the subcontractor's pre-qualification and material approval request, and identified, analyzed, and resolved problems and issues with quality assurance. I contributed to achieving contractor's milestones and boosting the company's standards in terms of project monitoring, quality assurance and quality control inspection, supervision, document management, and system completion.
Total Work Exp.: 20 years
QA/QC Exp.:
12 years’ plus
Projects worked on:
1) Implementation of AL Nakhli Tunnel on Dubai-Hatta Road - DUBAI, UAE
2) Design & Build for TSE (Treated Sewage Effluent) Seasonal Storage
Lagoon (Phase1) Consists of 5 Reservoirs and 1 Evaporation Pond - QATAR
3) Al-Bustan Street South Project - Upgrade of 3km Existing
Carriageway, 1.9M Long Bridge, Service roads, drainage system, extra-highvoltage cables, street lighting, substations, irrigation transmission pipelines,
water pipelines, foul sewer, landscape, intelligent transportation, art-scaping
design and construction - QATAR
4) Lusail Expressway Qatar -5.8 kilometers in length, a large-scale
project consisting of 16 lanes, 10 tunnels, 4 bridges, and a Micro tunnel,
together with the construction of infrastructure including a water supply and
sewage system, a telecommunication line, and a substation with A special
arch-shaped structure QATAR
5) Construction of offshore Port and terminal complex by creating an
artificial island with an area over a square mile (about 2.8 square km.) more
than 5 km. from shore - Abu DHABI, UAE
6) Construction of facility for ethylene feedstock, as well as offsite
facilities and utilities. - JUBAIL, KSA