Career Summary

Senior Electrical Engineer with 14+ years of construction industry experience. Expert in designing and implementing electrical systems for diverse projects. PMP and RMP certified, currently preparing for LEED Green Associate. Proven leader in managing complex projects and ensuring safety compliance.

Skill Set

Electrical System Design, Project Management Risk Management, Sustainable Building Practices, Safety Compliance, Cross-Functional, Team Leadership ,Budget Management, Performance Optimization, Technical Problem Solving, Regulatory Compliance.

Professional Information

Total Experience : 14

Nationality : Egypt

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

K H A L E D K H A L I L
R E A C H M E A T
+965 98829884
Al-Egila, Kuwait
Email: eng.khaledgalal@gmail.com
https://www.linkedin.com/in/khale
d-khalil-pmp®-0353b5292

C A R E E R G O A L S
I'm looking forward for joining a big scale Multinational Construction Company, Consulting office, a progressive organization that offers opportunities for advancement, where I can develop and utilize my
educational background and skills.

A C A D E M I C H I S T O R Y
Bachelor of Engineering | Electrical Power and Machines Department 2010 - Cairo University
Thesis involved studying Electrical engineering.
Member, SEIF (Student in Free Enterprise Society) fundraising team.

A C H I E V E M E N T S & E D U C A T I O N
Achieved Project management professional (PMP) Certificate on Feb 2024, PMP® Number: 3777742 (Above Target).
Achieved Risk management professional (RMP) Certificate on April 2024. RMP® Number: 3840949 (Above Target).
Achieved Professional Engineer from Kuwait Society of Engineers.
A member of Egypt Syndicate of engineers.
A member of Kuwait Society of Engineers.
Achieved Kuwait Oil Company approval as Electrical Engineer for KOC Housing Project.
Achieved Kuwait Ministry of Education approval as Electrical Engineer.
Preparing to Accredited LEED Green Associate.
Applied to Achieve MEW approved Engineer and waiting the Exam.

S K I L L S S U M M A R Y
Design & technical office experience
EPC Projects experience
Project management
Problem solving
Result driven
Constructive feedback
Active listening
Adaptability


C A R E E R H I S T O R Y
Senior MEP Engineer
Gulf Dredging Company | July 2020- Till present
Projects:
1. Rehabilitation of Berth 1 to 7 Shuwaikh Port, Kuwait. Project Cost: 48.5 million KWD)
2. Marine Construction & Repair Works at Kuwait Naval Base (US ARMY CORPS of Engineers)
3. KOC HOUSING, South of Ahmadi, Kuwait. (160 NOS. Of Villas, Two Utility Buildings, 4 Chillers: 3040 TR,
3NOS. of Substations and all External works, Project Cost:25 million KWD).
Activities Assigned for project 1 &2:
1. Site Offices building MEP Preparation.
2. MEP Site Facilities (Casting yard, Laboratory, Batching Plant).
3. Demolition of old existing MEP services.
4. Design and Shop drawings of electrical utility systems.
5. Installation of the Electrical systems.
Activities Assigned for project 3:
1. Design review and Shop drawings of electrical utility systems internal & external works as follow: (i.e. Lighting, Power, Cable Routing, Schematic Diagrams, Lightning, Grounding, Panel Board Schedules, Fire alarm, Security and telecommunication, Voltage Drop and Short Circuit Calculations).
2. Coordinated the electrical utility systems at buildings with other disciplines and builder work & composite shop drawings.
3. Get source and technical approvals for all materials.
4.Technical material review/evaluation for technical offers from the Procurement Department.
5. Material takeoff and review specifications
6. Supervision the Electrical CADD Operators
7. Responsible for all electrical site works.
8. Responsible for 11KV external cables routing to Ahmadi S.S (1.5 KM).
9.Responsible for fresh & Brackish lines to south Tank Farm (3.5 KM).
10. Responsible for work plan and look ahead schedule.

Senior Electrical Engineer
China Harbour Engineering Company LTD
March 2015 to July 2020
Projects:
1.KOC HOUSING, South of Ahmadi, Kuwait. (160 NOS. Of Villas, Two Utility Buildings, 4 Chillers: 3040
TR, 3NOS. of Substations and all External works, Project Cost:25 million KWD).
Activities Assigned :
1.Responsible for all electrical site works.
Fat Attended:
1.Siemens for HT panels (11&3.3KV, RCP & Annunciator panels) India.
2. Emerson for UPS, France.
3.Ducab Cables for Cables, UAE.
4.ABB for Capacitor Banks, India.
5. POWER BAR GULF LLC for Bus Duct, UAE.

Electrical Engineer (Design &Technical office)
Kharafi National KSC | May 2013 to March 2015
Projects:
1. Sabah Al Salem University, Decked Car Parking and Shelters, Kuwait. (22 Nos. Of Shelters, 11 Nos. Of Decked Parking &3 Nos. of ancillary Buildings, 7 Nos. OF Substations, MEP Cost:19 million KWD)
2. Administration Building, Amiri Diwan, Kuwait. (8 Nos. TR: 1600KVA, 3 Nos. Of Floor, Roof & 2 Nos. of Basements, Total Area: 22700m2, Project Cost:37 million KWD)

3. El Shaheed Park, Amiri Diwan, Kuwait. (5 Nos. TR: 1600KVA, Landscape Area: 107,000 m2,7 Nos. Of Buildings, Project Cost:34 million KWD)
4. El Seif Palace, Amiri Diwan, Kuwait.
5. Meshref Pump Station, Kuwait.
6. Sabah Al Salem University, Central Utility Plant 1&2 Including Ancillary Buildings &Utility Tunnel, Kuwait (For each Building: 9 Nos. TR: 4000KVA, 3.3KV feeding 18 Chillers 40000TR, 21 Nos. TR:1600KVA, 415V, MEP Cost:60 million KWD)

MEP Construction Manager
General Power Contracting Company
July 2020 to July 2022
Projects:
1. Kuwait National Guard Marina in Funatis Club, Kuwait.
2. Abdalla Salem Villa. Kuwait.
Activities Assigned :
1. Design review and Shop drawings & Coordinate the MEP systems at buildings with other disciplines and builder work & composite shop drawings.
2.Get source and technical approvals for all materials.
3. Technical material review/evaluation for technical offers from the Procurement Department.
4. Material takeoff and review specifications
5. Supervision the CADD Operators
6.Responsible for all MEP site works.
7. Coordination & management between Site Team and Technical Office.

Senior Electrical Engineer
MEP PRO Engineering Consultant office (Design & Supervision)
July 2018 to March 2022
Projects:
1. Al Oula Steel Factory, Kuwait.
2. Hessah Al Mubarak Residential project, Kuwait. (Packages1,8,&9)
3. Upgrade of Security Systems Land Force Artillery of various locations, Kuwait.
4. Moutiri Villa, Kuwait.
5. Shekha Basma Villa, Kuwait.
6. Yarmouk Villa, Kuwait.
7. Dusit Princes Mahboula Hotel, Kuwait
8. MANARAT AND GARAS School, Kuwait
Activities Assigned :
1. Design, load calculation, BOQ, specification & drawing elaboration, (I.e. lighting, Small &Main Power, Schematic Diagrams, Cable Routing, Panel Board Schedules, Voltage Drop
Calculations, Grounding and Lightning).
2.Coordinated the electrical utility systems at building with other trades
3. Supervision of Electrical works.
4. Approval of Electrical Submittals.
5. Approval of Shop drawings & Material.

Electrical Design Engineer
Saleh & Hegab Integrated Engineering Economical
Consultancy Formerly Sabbour Associates 1975-2006
May 2011 to May 2013
Projects:
1. UNIVERSAL Factory for Packaging Materials & Paper – (UNIPACK), 10th of Ramadan City, Egypt.
2.National Academy for Science & Skills (SAMCRETE), Cairo, Egypt. (2 Nos. of Floors, 30 Nos. of Labs)
3. Data Center for (ORASCOM), Cairo, Egypt. (Tier 4, 3Nos. of floors,1 No. of Substation, 2 Nos. of TR:2000KVA, Total Area: 1400 m2)
4. Faculty of Engineering for (AHRAM CANDIAN UNIVERSITY) 6th of October City, Egypt. (3 Nos. Of Floor, Roof & 1 No. of Basement, Project Cost:80 million EGP, Phase 3)
5. ADWIA Egypt Factory for Pharmaceutical Industries, 10th of Ramadan City, Egypt.
6. Design of Infrastructure Network, 66KV/220V, Electrical Medium voltage Network for (AL- TAJAMOUAT INDUSTRIAL CITY), Zezenya, Elobour city, Egypt. (Total Area: 1,100,000 m2 with Total Built Area of about 600,000m2 60 Nos. of Factories, 3 Nos. of Substations)
7. Technical Report (GAP Analysis) of the Electrical Networks of Administration Building for (EGYPT AIR), Cairo, Egypt. (3 Nos. of Substations, 6 Nos. of TR :2000 KVA, 3 Nos. of Buildings, Each Building: 3 Nos. of Floors & 2 Nos. of Basements) -Study of the Design & Site Survey & check all Electrical problems.
8. Redesign for Council of ministers Commercial Buildings, Cairo, Egypt. (Total Area: 26000m2)
9. Redesign for Jawhara The Presidential Guards, Cairo, Egypt.
10.(1 No. Car parking, 2 Nos. Of Commercial floors & 8 Nos. Of Residential towers, Total No. Of Units:307, Total Area:14000m2)