Myself Pranab Roy working in a 2000MW CCPP ,SUR IPP, Oman as an acting shift charge engineer in operation for the last 5 years 8 months. I have a total experience of 20 years in combined cycle power plant, I am authorised safety controller up to high voltage. I am looking for a better opportunity.

Skill Set

Power plant proffessional

Professional Information

Total Experience : 22

Nationality : India

Qualification Level : Post Graduate

Job Function : Energy /Nuclear /Solar /Power/ Other Energy

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

PRANAB ROY
Mobile No. +8801844217056 /0091-9730967193
Email: pranabroyus@gmail.com,pranab_roy_us@yahoo.com

Seeking challenging assignment in Power plant operations with organization of repute preferably in Power sector.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------
CARREAR SUMMERY
A result oriented professional with more than 22 years of experience in O&M of Combined cycle. Power Plant.
• Proficient in operation of power plant (CCPP).
Worked in maximum capacity of 4600MW CCPP.
Worked in GE (7FA, 9E, 6FA & 9FA), Siemens (V94.2, V94.3A) and Mitsubishi (701F) Gas turbine.
Worked in Single (supplementary firing), double and triple pressure (Reheat) boiler. Worked in GE, Siemens, Fujitsu and Mitsubishi Steam turbine (Fixed and sliding type).
Senior Authorized person and safety controller up to HV system following British 4th edition safety rules.
• Proficient in handling plant Permit system ensuring personal safety and system derivedhazards.
• Devising strategies for managing effective and efficient maintenance operations for reducingbreakdown
/ downtime & enhancing operational effectiveness of equipment.
• Proficient at studying electrical diagrams, trouble shooting of electrical circuits and knowledge of various electrical protections.
• Basic knowledge of:
? Various electrical testing in transformer, circuit breaker, isolators, CT and CVT. Operational aspects on LT & HT systems and all the trip circuits.
• Gained Basic knowledge in Instrumentation & Controls, DCS andPLC’s.


WORK EXPERIENCE

1. Bangladesh Power Distribution board: Plant Shift Manager from July 2021- present
( A 220MW CCPP with TWO GAS TURBINE of 6FA GE(DLN 2.6) gas turbine each of 75MW AND ONE STEAM TUBRINE of GE TRIVENI of 83MW, Operation by Maintenance by OEG Bangladesh and 163MW CCPP with ONE gas turbine of GE 9E(DLN1.0) 108MW and ONE STEAM TURBINE OF 55 MW, Operation and Maintenance by OMS Bangladesh.)

Responsibilities:
? Responsible for maintaining the dispatch and leading the Operation team of 5 members.
? Liasoning with external agency (LDC and gas agency) maintain good relationship.
? Up gradation of the technical knowledge and same to be shared with team members and try to maintain the team spirit.
? Ensuring all field activities carried out by a field operator safely comp lying with appropriate SOP and company environmental health & Safety (EHS) guidelines at all times within the power s
? 220KV switching operation through SCADA.
? Responsible for raising the plant modification, making of the plant operation procedures, trip reports and emergencyprocedures.
? As a safety controller preparing and issuing of PERMITS FOR WORK/ACCESS CERTIFICATE/SANCTION FOR TEST.

(A 2000MW CCPP in SUR IPP (OMAN) as a Shift charge engineer from Feb 2015 onwards(three blocks of Siemens V94.3 A m/c (Siemens T-3000 ),1st two blocks consist of 2-2-1 configuration of 800MW (GT capacity 250MW and ST capacity 300MW) each and 3rd block consist of 1-1-1(GT capacity 250MW and ST capacity 160MW) configuration of 400MW, HSRG is triple cycle with supplementary firing) .
Responsibilities:
? Responsible for maintaining the dispatch. Leading a group of 6 person( 3CCR & 3 FO). Liasoning with OGC, OPWP and LDC as when required and maintain good relationship.
? Up gradation of the technical knowledge and same to be shared with team members and try to maintain the team spirit.
? Ensuring all field activities carried out by a field operator safely comp lying with appropriate SOP and company environmental health & Safety (EHS) guidelines at all times within the power station.
? As a safety controller & Safety coordinator preparing and issuing of PERMITS FOR WORK/ACCESS CERTIFICATE, dealing with cross boundary isolation for 220KV GIS, we follow British safety rules 4th edition up to HV through Nisoft safety management system.
? Generating and sending daily reports, Gas reports through FDM(Fuel demand model) trip reports to LDC and OGC. identify faults, raise system modification ions and notify the same through the Plant Maintenance Management Software (ENGICA).


(Gas turbine is GE 7FA with DLN 2.6, triple cycle, VERTICALE BOILER): Consist of six block, each block with a configuration of 3 gas turbine of 171 MW with 1 steam turbine GE D11 of 275MW).

Responsibilities:
Involve in commissioning activities of CCPP with Doosan and Arabian Bemco as per requirement. Five blocks are fully commissioned, involve in daily operation activities such as startup/shut down of gas turbine, HRSG and ST and deal with LDC.

(700MW CCPP with GE Frame 9FA m/c, DLN-2E, triple cycle HP/IP/LP with HP steam flow of 295T/H). (Reporting to Operation manager)


Responsibilities:



• Consist of two units, each being 350MW (GE frame 9FA of 222MW and Siemens Steam turbine of 129MW), unit -2 of 350MW is commissioned and COD declared in April 2013.
• Raising punch points and to take up or follow up these points with EPC.
• Leading a team taking part in commissioning activities such as RODM/PT plant commissioning, EDG Commissioning, HRSG flushing/steam bowing/alkali boil out, fuel gas system leak test, gas charging, GT & & ST commission activities, Protection interlock checking, signing protocols along with EPC & OWNER etc.
• 220KV switching operation through SCADA.
• Preparation of reports, Operating Procedures, SOP’s, Operating Formats for routines on a wide array of subjects as
required by the Management.
• Preparation and issuing of PTW to EPC contractor including 220KV PTW.


5. Ras Girtas Power Company, Qatar Control Room Engineer Jan’10- April 12
(A joint venture of QP, QEWC, MITSUI and Hyundai) (2730MW CCPP with gas turbine of Mitsubishi M701F
and desalination plant of 63.9MGID with 10 ME D’S)



Responsibilities:


• Managing eight gas turbine and four no . of steam turbine with 2+1 configuration (four blocks), commercially declared full availability to Qatar electricity water and Power from 1st April 2011 onwards.
• Involved in commissioning activities with EPC (Hyundai) before commercial declaration, coordinating with National power control Centre for different commissioning activities.
• Responsible for operation of plant (start up/shut down) safely. Involve in operation of ST start commissioning activities.
• Managing daily plant operation activities, restoration of plant after tripping as soon as possible, emergency handling, troubleshooting with Hyundai (EPC) operators.
• Ensuring all field activities carried out by a field operator safely complying with appropriate SOP and company environmental health & Safety (EHS) guidelines at all times within the power station.
• Generating daily reports, Gas reports ,same communicating to NCC and NWCC.
• Identify faults, raise system modifications and notify the same through the Plant Maintenance Management Software(SAP)
• Responsible for raising the plant modification, making of the plant operation procedures, trip reports, various commissioning related reports and emergency procedures.
• Coordinating with maintenance, Kaharama, Qatar petroleum for gas related and maintaining good relationship can help us maintaining DI /Gas in crisis situation. . Involve in operations of 400KV, 220KV& 132KV GIS.

6. Jhajjar Power limited (CLP group, India): Dy. Manager (Electrical Department) Apr’09-Jan’10 1320 Super Critical, Thermal Power Plant (Reporting to electrical HOD).


Responsibilities:


• Reviewed and verifies accuracy and consistency of engineering drawings and specifications.
• Monitored progress to ensure compliance with plans and specifications
• Supervised construction work schedule, safety performance and work quality, inspection of material expected at site.
• Technical evaluation and vendor evaluation of any electrical equipment required for a particular electrical non-EPC jobs and also coordinate with different contractor for dealing non EPC electrical jobs.
• Ensured that site comply with current health and safety regulations and company’s safety policies.
• Developed good safety culture by ensuring that all personnel are trained or well briefed (method statements, risk assessments) in the tasks they undertake. Liaised with Local government officials.
• Preparation of procedures related to construction and also developed procedure for permit system for an EPC.



(65% Share International Power), a 285MW open cycle power plant GE frame 9E m/c DLN1


Responsibilities


• Responsible for operation of plant (startup/shut down); daily plant operation activities, restoration of plant after tripping as soon as possible, emergency handling, troubleshooting and rising of work orders for maintenance job and SHE (Safety health and environment)) related issues.
• Carried out shift routines as per routine will help maintaining plant / equipment availability high.
• Responsible for raising the plant modification, making of the plant operation procedures, trip reports and emergency procedures.
• Preparation/Cancellation of PTW.

8. CLP Power India Private Limited, INDIA: Assistant team manager (Aug’00-Dec’06)

A HONGKONG based (CCPP 655MW with gas turbine of Siemens V 94.2, each of 130MW) company at PAGUTHAN, Bharuch (Gujarat) previously named as POWERGEN India (UK based company).

Responsibilities
• Responsible for operation of plant (start up/shut down) safely and efficiently strictly complying with hourly dispatch instruction.
• Handled daily plant operation activities, restoration of plant after tripping as soon as possible, emergency handling, troubleshooting and rising of work orders for maintenance job and SHE (Safety health and environment)) related issues.
• Up gradation of the technical knowledge and same to be shared with team members and try to maintain the team spirit.
• Responsible for raising the plant modification, making of the plant operation procedures, trip reports and emergency procedures.
• Functioned as plant Senior Authorized person (we follow Powergen safety rules) responsible for releasing of plant / apparatus for work, isolation of plant & equipment including the HV apparatus. Issued PTW up to 400KV supply. Preparing
/issuing / canceling of the permit for work, Limited work certificate ,ROMP ,sanction for test etc.
• Coordinated with maintenance, Electricity Board, Gas Agencies etc and maintaining good relationship can help us maintaining DI /Gas in crisis situation and get DI regularized.
• Carried out shift routines as per routine will help maintaining plant / equipment availability high.
• Handled operation of 220 AND 400KV Switchyard.

Achievements (In 655MW CCPP, India):
• Generated document on generator and transformer protections with their set points.
• Gave presentation on Plant Gas Supply System and Gas Turbine Lube Oil System.
• Effectively made the
• Technical documentation on boiler pressure start-up curve and described about the steam turbine controller function.
• Recognized as a hardworking, sincere and technically sound.

Plant Achievements (655MW CCPP):
• Successfully delivered the highest standard and Plant was awarded with of Health & Safety (RoSPA- Gold).
• Maintained Environment management standard (ISO 14001). Received Greentech Award for environment management.
• Holds the merit of completing Hot Gas Path Inspection of Gas turbine in a record 19days.
• Ensured Plant commercial availability more than 95%.
ACADEMIC QUALIFICATION
• Postgraduate Diploma in Thermal Engineering from National Power training Institute, Delhi in 2000 with 74%.
• Bachelor of Electrical Engineering from Bhilai Institute of Technology (INDIA) in 1999 with72%. IT Skills: Well versed with MS Office and Internet Applications
TRAININGS ATTENDED
• SF6 breaker training at BHEL Hyderabad and GIS training by ABB at DOHA
• Generator protection and Excitation system, parallel operation and grid & SIEMENS RELAY
• O&M practices for combined cycle power plant by PMI Noida at KAYAMKULAM.
• Transformation Leadership through Personal Growth Lab by Synergy group.
• Workshop on requirements pertaining to industrial safety.
• Simulator training on combined cycle operation at PAKA Malaysia.
• LMI (Learning Management Institute, Vadodara) course for an effective self-development.
• Communication skill by GREYCELL INDIA.
• First aid training from MEDIC first aid, OMAN
• Safety audit and site inspection by Petro Knowledge