Profile

Recruiters: To view this profile, please Register / Login

Jobseekers: To make your profile available to Recruiters for free, opt for Premium Membership

Damian Emesowum

Candidate ID: 525130

Career Summary

Engineering Graduates/PG with 14 years experience in Engineering functional area

Skill Set

Auto Card, Project Schedulling, Progress tracking,

Professional Information

Total Experience : 15

Nationality : Nigeria

Qualification Level : Engineering Graduates/PG

Job Function : Engineering

Work Location Preference : Kuwait, Bahrain, Oman, Saudi Arabia, Qatar, UAE

Detailed Profile

RESUME


EMESOWUM, DAMAN CHINEDU (C.Eng, Mnse)
Field Construction Coordinator/Construction Coordinator/Project Coordinator



PERSONAL DATA

Surname: Emesowum
Other names: Damian Chinedu
Date of Birth: 16th March 1974
Age: 45yrs.
Nationality Nigerian
State of Origin: Imo State
L.G.A. Orlu
Home Town: Ezikenataraomumu Village in Umuowa Community.
Sex: Male
Marital status: Married
Contact Address: Project Development-Onshore, Nigerian Agip Oil Company Limited, Mile 4, Rumueme,
P.O. Box 923 Port Harcourt.
Telephone Number: 084-236400 ext 77600, 08037513878,
E-mail Address: Emdac2000@yahoo.com
INSTITUTIONS ATTENDED WITH DATES
1994-1999 Federal University of Technology Owerri, Imo State
B.Eng., Civil Engineering; 2nd Class Honours, Upper Division
1987 – 1992 Secondary Technical School Umuowa Orlu, Imo State
S.S.C.E.
1980 -1986: Central School 1, Umuowa Orlu L.G.A., Imo State
First school leaving certificate
ADDITIONAL/PROFESSIONAL QUALIFICATIONS

2008 – Till Date Council for Regulation of Registered Engineers in Nigeria. Registration No. R 15755
2007 – Till Date. Corporate Member, Nigerian Society of Engineers. Membership No. 18291
WORKING EXPERIENCE WITH NIGERIAN AGIP OIL COMPANY LIMITED – ENTRY DATE: 2ND OCTOBER, 2002.
August2018 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Field Construction Coordinator
Project Title: VARIABLE (ALL SWAMP AREA PROJECTS)
Responsibility: Coordination of Supervision of all on-going swamp area projects.
EPC Contractors: Many
Status: On-going

Responsibilities:
• Coordination of field Engineers of different disciplines.
• Field Supervision.
• Preparation and Sending of daily progress site reports to Field Execution Manager.
• Tracking of daily, weekly and monthly progress using S-curve, Level 3 Schedule.
• Coordinating weekly and monthly progress meetings and reporting to Field Execution Manager.
December2018 – August2019 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Project Engineer
Project Title: NAOC JV BRASS TANK 7 RESTORATION PROJECT
Project Objective: Total Revamping of Brass Crude Oil Tank 7 Project
EPC Contractor: HOPIC Nig Ltd.
Status: On-going

Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Tracking of weekly and monthly progress using S-curve, Level 3 Schedule.
• Coordinating weekly and monthly progress meetings and reporting to Division Manager.

Position: Project Engineer
Project Title: INSTALLATION OF OB/OB TO OB3 GAS METERING SYSTEM
Project Objective: GAS SUPPLY (100 STANDARD CUBIC FEET) TO OB3 FACILITY
EPC Contractor: ANCHORIC.
Status: Completed.

Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Tracking of weekly and monthly progress using S-curve, Level 3 Schedule.
• Coordinating weekly and monthly progress meetings and reporting to Division Manager.
March 2015 – Dec 2018 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Project Coordinator
Project Title: NAOC JV IDU MPB Turbo Compressor Installation Project
Project Objective: like for like Replacement of the existing MP-B Compressor that is currently malfunctioning.
LLI Vendor: Solar System
EPC Contractor: Zerock Construction Company Ltd.
Status: Completed

Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Tracking of weekly and monthly progress using S-curve, Level 3 Schedule.
• Coordinating weekly and monthly progress meetings and reporting to Division Manager.
June 2014 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Project Coordinator
Project Title: NAOC JV OB/OB POWER TRANMISSION PROJECT
(NNPC/CONOCOPHILLIPS/NAOC JV)
Project Objective: To transmit 15MVA of electricity from OB/OB to Ebocha compression Island in case of power shut down at Ebocha Compression Island.
• To isolate unwanted fault current from the downstream ie community to OB/OB power generation system that might lead to uncontrolled shut-down of the plant.
• To transmit 15MVA of electricity from OB/OB to New base round about 11KV substation.
• To transmit 2.5MVA of electricity from OB/OB to Ebocha Oil Center 11KV switchgear.
• To make available the existing 2.5MVA, 11KV transmission line from New base round about to Ebocha Oil Center 11KV switchgear thereby making it available for use.
Contractor: JOENY NIG. LIMITED.
Status: Still on-going. Overall progress achieved is 69% completion
Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Tracking of weekly and monthly progress using S-curve, Level 3 Schedule.
• Coordinating weekly and monthly progress meetings and reporting to Division Manager.

January.2012 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
Project Title: NAOC JV Waste Water Management Plan
Position: Project Coordinator
Overall Objective: NAOC JV Waste Water Management Plan is aimed at the proper collection, evacuation and treatment/processing of the entire produced water and enclosed facilities surface drain off water in line with global best practices, Department of Petroleum Resources (DPR) EGASPIN guidelines and ENI standards to meet onshore reinjection conditions.
Project Classifications: Short Term and Long Term Projects

Short Term Projects: Aimed at reducing incidence of Oil Passage into Brass Canal.

January.2012 – August 2012 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
? Project Title: Piping Modification for Separation of Gun Barrel Line from Tanks Drain Line in Brass Terminal.
Objective: Aimed at separating Gun Barrel Line from Tank Drain Lines which was causing back pressure to the tanks.
Contractor: Network Oil & Gas Ltd.
Status: Completed in August 2012
Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Interfacing with Construction Section on Construction activities
• Reporting to project Sponsor on monthly Progress S-curves, Financial S-curves, and Manpower histogram.
• Monitoring /evaluation of contractor master schedule aimed at achieving the project planned date.
• Monitoring /evaluation of contractor weekly and monthly Progress aimed at achieving the project planned date

January2013 – March 2014 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
? Project Title: Procurement and Installation of Automated Chemical Dosing System in Brass Terminal.
Objective: Aimed at replacing the manual existing chemical dosing system to automated dosing system.
Contractor: Servon Nigeria Limited.
Status: Completed in March 2014
Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Interfacing with Construction Section on Construction activities
• Reporting to project Sponsor on monthly Progress S-curves, Financial S-curves, and Manpower histogram.
• Monitoring /evaluation of contractor master schedule aimed at achieving the project planned date.
• Monitoring /evaluation of contractor weekly and monthly Progress aimed at achieving the project planned date.

June.2013 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
? Project Title Replacement, Connection and Modification of Tanks Drain Lines in Brass Terminal.

Objective: Aimed at replacing drain lines and valves and automating crude oil tanks draining system.
Contractor: Nec Technical System Ltd.
Status: On-hold

Long Term Projects: Aimed at stopping produced water discharge into Brass Canal.

November.2012 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)

? Project Title; Replacement of 4no Strings of 6’’ sch 120 PE Coated Flowlines from Ebocha Oil Centre to candidate Wells for Ebocha Produced Water Reinjection Project.
Objective: Aimed at having reinjection lines ready from EOC to the selected Wells.
Contractor: B+G&S Ltd -16.93km and Topline Ltd -17.2km.
Status: Execution is on-going. Cumulative Progress achieved till date is 85% completion.
Responsibilities:
• Preparation of Project in-house estimate
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Interfacing with Construction Section on Construction activities
• Reporting to project Sponsor on monthly Progress S-curves, Financial S-curves, and Manpower histogram.
• Monitoring /evaluation of contractor master schedule aimed at achieving the project planned date.
• Monitoring /evaluation of contractor weekly and monthly Progress aimed at achieving the project planned date.

November.2012 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
? Project Title Procurement of 6’’ X 50KM SCH 120 PE Coated Line Pipes for Ebocha Produced Water Reinjection Project.
Objective: Aimed at procuring line pipes considered as LLI needed for the flowlines laying.
Contractor: kilo Global, AS Energy, Mamtech Technical Services and Fiddil Ltd..
Status: Procurement is on-going. Cumulative Progress till date is 80% completion
Responsibilities:
• Preparation of Project in-house estimate
• Technical bids Evaluation.
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Interfacing with Construction Section on Construction activities
• Reporting to project Sponsor on monthly Progress S-curves, Financial S-curves, and Manpower histogram.
• Monitoring /evaluation of contractor master schedule aimed at achieving the project planned date.
• Monitoring /evaluation of contractor weekly and monthly Progress aimed at achieving the project planned date.

Feb.2012 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
? Project Title: EPC for Tebidaba Produced Water Reinjection Project.
Position: Project Coordinator
Objective: Aimed at installing a functional produced water treatment plant in Tebidaba Flow station
Contractor: TBD.
Status: Tendering on-going.
Responsibilities:
• Preparation of Investment Proposal for Partners approval.
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Interfacing with Construction Section on Construction activities
• Reporting to project Sponsor on monthly Progress S-curves, Financial S-curves, and Manpower histogram.
• Monitoring /evaluation of contractor master schedule aimed at achieving the project planned date.
• Monitoring /evaluation of contractor weekly and monthly Progress aimed at achieving the project planned date.
• Preparation of Project in-house estimate.
Feb.2012 – Till Date Nigeria Agip Oil Company Limited Port Harcourt, Rivers State Communities (NNPC/CONOCOPHILLIPS/NAOC JV)
Position: Project Coordinator
Project Title: Stepping Down of 33KV Overhead Transmission Line to Samabri Biseni Location & Five Host
Project Objective: To run ESP Wells at Samabri and Communities Electrification.
Contractor: TBD.
Status: Tendering on-going.
Responsibilities:
• Preparation of Investment Proposal for Partners approval.
• Interfacing with Engineering Section on Basic and Detailed Engineering
• Budget Defence with Partners.
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Preparation of Project in-house estimate.
• Reporting weekly and monthly updates to Divisional Manager.
Dec.2011 – Feb 2012 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Project Coordinator
Project: 33KV Overhead Transmission Line From Idu Flowstation to Samabri Biseni
Location (NNPC/CONOCOPHILLIPS/NAOC JV)
Project Objective: To Run ESP Wells at Samabri and Communities Electrification.
EPC Contractor: Franco International Services.
LLI Procurement Contractor: Franco International Services..
Status: On-going. Cumulative progress is 90% completion.
Responsibilities:
• Budget Performance Defence with Partners.
• Technical bids Evaluation.
• Reporting to project sponsor on monthly Progress S-curves, Financial S-curves, Manpower histogram.
• Monitoring /evaluation of contractor master schedule aimed at achieving the project planned date.
• Monitoring /evaluation of contractor weekly and monthly Progress aimed at achieving the project planned date.
• Preparation of Project in-house estimate.
• Preparation of project scope of work

Nov. 2011 – Dec. 2011 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: Rehabilitation of OB/OB Existing API Skimmer –(NNPC/CONOCOPHILLIPS/NAOC JV)
Project Objective: To Rehabilitate the Existing API Skimmer.
EPC Contractor: Zerock Nig. Ltd.
LLI Procurement Contractor: Zerock Nig. Ltd.
Status: Completed
Responsibilities:
• Prepared Civil works scope of work.
• Prepared Civil Works Bill of Quantities.
• Prepared of Civil Works Basic Engineering for API Skimmer Rehabilitation.
• Coordinated the Geotechnical and Topographic Survey prior to Commencement of Detailed Engineering.
• Reviewed Contractor’s Detailed Engineering Documents till approval stage.
• Site Supervision of the ongoing Civil Works such as Flash Tank Foundation and Reinforced Concrete Recovery Pit.
Jan 2011 – Nov. 2011 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: OB/OB LLP Compressor Installation – (NNPC/CONOCOPHILLIPS/NAOC JV)
Project Objective: To flare down LLP Separators Train.
EPC Contractor: Zerock Nig. Ltd.
LLI Procurement Contractor: Zerock Nig. Ltd.
Status: Completed.
Responsibilities:
• Prepared General Scope of Work which includes Civil Works, Mechanical & Piping Works, Electrical & Instrumentation Works.
• Prepared Civil Works Bill of Quantities.
• Prepared of Civil Works Basic Engineering for the LLP Compressor Foundation.
• Coordinated the Geotechnical and Topographic Survey prior to Commencement of Detailed Engineering.
• Reviewed Contractor’s Detailed Engineering Documents till approval stage.
• Site Supervision of the Civil Works such as CFA Piling works, Pile Cap Construction, Column Plinths Construction, Grouting, Compressor Shelter Fabrication, Painting, Erection, touch-up, paving etc.
June 2009 – May. 2010 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer.
Project: Ebocha Oil Centre Early Gas Recovery – (NNPC/CONOCOPHILLIPS/NAOC JV)
Project Objective: To flare down Ebocha Oil Centre.
EPC Contractor: Saipem Contracting
LLI Procurement Contractor: GE-NP
Status: Completed
Responsibilities: Part of Supervision Team on Site for the following activities.
• Topographic Survey of Existing Ebocha Oil Centre & Ebocha Recovery Project Site to identify buried facilities like Addax 12”Crude Pipeline, Kwale Gas Line and Ob/Ob 24” Gas Line.
• Geotechnical Survey of the Proposed Site Ebocha Gas Recovery Project.
• Reviewed Contractor’s Detailed Engineering Documents from Draft stage, Issue for comments stage to approval stage.
• Commenting on Civil works documents.
• Deep foundations construction for LP (A), LP (B) and MP compressors.
• Compressor steel structural shelter installation with overhead crane of 10 tons capacity.
• Construction of foundations/installation of compressors scrubbers.
• Construction of foundations/installation of compressors Air coolers.
• Construction of foundations/installation of water console skid.
• Construction of foundations/installation of fuel gas skid.
• Construction of foundations/installation of turbo generator.
• Construction of foundations/installation of fire walls.
• Construction of foundations/installation of transformers.
• Construction of foundations/installation of containerized control cabins.
• Construction of foundations/installation of steel structural pipe bridge.
• Construction of foundations/installation of steel structural pipe supports.
• Hot tapping, tie-in, Pre-commissioning, Commissioning and Handover
April 2009 – June 2009 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: Swamp Area Flare Down & Further Oil Development.
(NNPC/CONOCOPHILLIPS/NAOC JV)
Contractor: Prequalification on-going.
Status: Front End Engineering Stage
Responsibilities: Scope of work and Bill of quantities Preparation of the following
activities:
• Topographic Survey of the Proposed Site for New Tebidaba Flow.
• Topographic Survey of the Proposed Right of Way for 24” Tebidaba-Ogbainbiri Gas Pipeline.
• Geotechnical Survey of the Proposed Site for New Tebidaba Flow station.
March 2009 - April 2009 Nigeria Agip Oil Company Limited, Port Harcourt, Rivers State
Position: Civil Engineer
Location: Samabri-Biseni Cluster“2”Location
(SPDC/TOTALFINAELF/CONOCOPHILLIPS/NAOC/NNPC JV
Project: Various
Contractor: NELCO INTEGRATED SERVICES
Status: Completed
Responsibilities: Scope of work and Bill of quantities Preparation of the following activities:
• Modification of Existing Fire Fighting Facilities.
• Rehabilitation of existing Samabri-Biseni Cluster “2” Location prior to Work- over Rig Move.
• Extension of Idu arrival Manifold foundation and skid
January 2008 – March 2009 Nigeria Agip Oil Company Limited, Port Harcourt, Rivers State
Project: Civil Engineer
Project: Various Security Projects in PH Office (NNPC/CONOCOPHILLIPS/NAOC JV)
Contractor: Various
Status: Completed
Responsibilities: Preparation of Scope of work, Bill of quantities and Site Supervision of following sub projects:
• Construction of Mopol Camp (Caravans) at NAOC jetty Area.
• Construction of Military Campsite at NAOC jetty Area.
• Pre-fabrication and Installation of Bullet Proof Screen Wall at Naoc Main Office Reception Area.
• Pre-fabrication and Installation of Bullet Proof Screen Wall at NAE New Office Reception.
• Feasibility Study of existing Brass Canal/Fire Fighting Pumps Station Revamping Project. (Point engineering).
November 2005 – December 2007 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Supervisor
Project: Ebocha Oil Centre Revamping Project Phase II - Detailed Engineering
Design (NNPC/CONOCOPHILLIPS/NAOC JV)
Contractor: Sudelettra Nigeria Limited
Status: Completed
Responsibilities: Civil Works Coordinator/Supervisor of the following activities:
• Coordination of Detailed Engineering of Civil works Activities
• Controlling of Civil works incoming documents
• Preparation of Civil works document status
• Commenting on Civil works drawings for correction
• Master Document Register Update
• Monitoring and tracking of project activities
• Supervision of on-going construction of Coalescers Filter Foundations (LP & LLP)
October 2004- January 2005 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: Samabri/Biseni Fire fighting Pumping Station Foundation
(SPDC/TOTALFINAELF/CONOCOPHILLIPS/NAOC/NNPC JV)
Contractor: FRIGATE
Status: Completed
Responsibilities: Civil Works Supervisor on site
• Supervision of Raft Foundation for the fire fighting pumping station slab.
• Monitoring and tracking of project activities
February 2004 - April. 2004: Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: BrassLNG Access Road Creation (CONOCOPHILLIPS/NNPC/Chevron/NAOC JV)
Contractor: CRT Limited
Status: Completed
Responsibilities: Civil Works Supervisor on site
• Supervision of Bush clearing for the Access Road Creation to Brass LNG Site. Distance = 2.5km
• Timbering for Crude Oil Pipe crossing of Tebidaba Pipe line and Ebocha Oil Center Pipe line to Brass Terminal. (24” pipe line each)
May 2004 - December 2004 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Project: Civil Engineer
Project: Construction of Samabri/Biseni Fire Fighting Water Storage Tank Foundation
(SPDC/TOTALFINAELF/CONOCOPHILLIPS/NAOC/NNPC JV
Contractor: Zerock
Status: Completed
Responsibilities: Civil Works Supervisor on site
• Supervision of Foundation (Piled) for the fire fighting water Storage Tank Foundation.
• Monitoring and tracking of project activities
January 2003 – April 2004 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: Construction of Samabri/Biseni Power Generation.
(SPDC/TOTALFINAELF/CONOCOPHILLIPS/NAOC/NNPC JV
Contractor: SAIPEM CONTRACTING NIGERIA LIMITED
Status: Completed
Responsibilities: Supervision of Civil Works Construction activities of the following
Facilities
• Gas Generators (3no. Gas Generator + 1no. Diesel) foundation base
• Power Generation Shelter
• Installation of 3no. Gas Generators + 1no. Diesel Generator
• Post-drilling campsite of capacity 75 Persons
• Installation of Containerized Electrical Control Room
• Maintenance Workshop Shelter
• Telecom Mast Foundation
• Hydraulic Control Unit sleeper support Foundation
• Installation Hydraulic Control Unit
• Hydraulic Control Room Shelter
• VSD(Variable Speed Drive 5no.) foundation bases
• Installation of 5no. VSD transformers for ESP wells
• VSD (Variable Speed Drive) Shelter.
• Well Head Shelter
• Hazard Protective Fence.
• Fuel Gas Sleeper Support Foundation
• Installation of fuel Gas Scrubber unit.
• Steel Tower Lights Foundation
October 2002 – March 2003 Nigeria Agip Oil Company Limited Port Harcourt, Rivers State
Position: Civil Engineer
Project: Samabri/Biseni Cluster "2” Location Preparation
(SPDC/TOTALFINAELF/CONOCOPHILLIPS/NAOC/NNPC JV
Contractor: BILFINGER + BERGER GAS AND OIL SERVICES
Status: Completed
Responsibilities: Supervision of Construction for
• 6km Access Road to the Location (Surface Dressing)
• Pre-cast concrete Fence around the Location (260m x 260m)
• Sand-Cement Stabilization of the Location
• Evaporation Ponds (2no.)
• Waste Burning Pit
• Box Culverts (7no.s)
• Chemical Storage Shelter
• Test Separator Sleeper Foundation
• Manifold sleeper support foundation
• Concrete Support for the 14” Crude Oil Delivery pipe line from Samabri to IDU Flow Station
• Chain Link Mesh Wire Fence
• Septic Tank and Soak Away Pit
• 25m X 25m Helipad with Side Drains.
• Concrete Inspection Chambers (9no.s) for Electrical Submersible Pumps Cable for ESP Wells
• Drilling of two boreholes of productivity not less than 15m3/hr
• Installation of Entrance Gate to the Location
WORKING EXPERIENCE WITH BUSSDOR GROUP OF COMPANIES LIMITED – ENTRY DATE: JUNE, 2001.
July 2001 - October 2002 Bussdor Group of Companies Limited, Port Harcourt, Rivers State
Position: Civil Engineer
Project: Construction of 1- Bedroom 4no. Flats Doctors Quarters at Ossemoto,
Oguta, Imo State.
Client: NDDC
Status: Completed
• Organizing the team members on site by way of conducting project progress meeting every evening at the close of work
• Procurement of materials
• Planning of the project
• Labour Allocation
• Civil works supervision

NYSC EXPERIENCE WITH BUSSDOR GROUP OF COMPANIES LIMITED – ENTRY DATE: DEC, 2000.
December 2000 - July 2001 Bussdor Group of Companies Limited, Port Harcourt, Rivers State
Position: N.Y.S.C.
Project: Reconstruction of Ibeku High School Assembly Hall, Umuahia, Abia State (Shell
Community Project)
Client: SPDC
Status: Completed
• Organizing the team members on site by way of conducting project progress meeting every evening at the close of work
• Procurement of materials.
• Planning of the project
• Labour Allocation
• Civil works supervision
• Preparation of weekly and Monthly Progress Report for onward transmission to Project Manager.

NYSC EXPERIENCE WITH G. CAPPA PLC PH – ENTRY DATE: JULY, 2000.
July 2000 - December 2000 G.CAPPA PLC Port Harcourt, Rivers State.
Position: N.Y.S.C.
Project: Construction of FINIDI GEORGE Residential Building (Duplex)
Client: Finidi George
Status: Completed
• Supervision of civil works activities like Setting-out, Excavation, Compaction, Blinding, Footing e.t.c.
• Labour allocation to each item of work /activities.
• Material requisition to main office for supply.

REFEREE:


MR. PORTALUPI CARLO
Field Execution Manager,
Construction, Commissioning and Handover Department
Project Development- Onshore
Nigerian Agip Oil Co. Ltd. PH.
+2349062652189